Isuzu N-Series. Service manual — part 471
6G-4 TURBOCHARGER
8. Gasket.
9. Injection pipe.
10. Intake manifold.
11. Gasket and discard.
Installation
1. Intake manifold.
Tighten:
Intake manifold to 19 N
⋅m(1.9 kg⋅m/ 14 lb⋅ft)
2. Injection pipe
Tighten:
Fuel injector line nuts to 26 N
⋅m(2.7 kg⋅m/ 20 lb⋅ft)
3. Gasket
4. Charge air pipe.
5. Engine harness connector.
6. Bracket engine stop cable and vacuum hose.
7. Bracket accelerator cable.
8. Connecting hose.
9. Accelerator cable injection pump side.
10. PCV hose.
Turbocharger
Refer to “Statement on Cleanliness and Care” previous-
ly in this section.
Component
N6A1375E
N6A1373E
TURBOCHARGER 6G-5
Removal
1. Turbocharger air inlet pipe.
2. Turbocharger intake pipe.
3. Connecting hose.
4. Exhaust gas recirculation (EGR) pipe.
5. Heat shield bolt.
6. Water feed and drain lines.
7. Oil feed line.
8. Oil drain line.
9. Exhaust pipe to exhaust adapter nuts.
10. Exhaust adapter to turbocharger nuts.
11. Turbocharger to exhaust manifold nuts.
Caution:
The turbocharger for 4HG1-T Engine has a unit con-
struction of turbin housing and exhaust manifold.
Inspection and Repair
Caution:
• Turbocharger housing for cracks or damage.
• Gasket surfaces for damage.
• Seals and gaskets for damage.
• Turbine and compressor blades for damage or car-
bon buildup.
• Air and exhaust exit openings for oil or wetness.
• For grinding or roughness when spinning turbine
and compressor wheels by hand.
• For evidence of turbine or compressor blades con-
tacting the shroud or housing. If any of the above
conditions exist, the turbocharger must be re-
placed or repaired by an authorized repair facility.
Play in Radial Clearance
Moving the rotor in the radial clearance, measure the
play by a dial gage.
• Measure the play at several points while letting the
rotor revolve.
• Use only the flat dial gage attachment. Do not use
the pointed one.
• Attach the turbocharger and dial gage firmly.
If excessive, replace the turbocharger.
Legend
1. Water return pipe
6. Turbocharger assembly
2. Turbocharger intake pipe
7. Water feed pipe
3. Heat shield
8. Oil return pipe
4. Exhaust adapter
9. Oil feed pipe
5. Gasket
Legend
1. Air inlet pipe
2. Oil supply line
3. Turbo charger
4. Heat shield
N6A1376E
Play in radial clearance
mm (in)
Standard
Limit
0.056 — 0.127
(0.0022 — 0.0050)
0.140
(0.0055)
Legend
1. Oil outlet
2. Oil inlet
N6A1377E
6G-6 TURBOCHARGER
Play in Axial Clearance
Moving the rotor in the axial clearance, measure the
play by a dial gage.
• Measure the play at several points while letting the
rotor revolve.
• Attach the turbocharger and dial gage firmly.
If excessive, replace the turbocharger.
Operation of Waste Gate
• Disconnect hose (2) from waste gate (1), and in-
stall pressure gauge (3) as shown in the figure.
• With the engine stopped, operate the pressure
gauge pump to apply pressure to the waste gate
for check the waste gate function.
Oil Leakage Check
1. Remove the charge air pipe connecting hose to the
compressor side of the turbocharger.
2. Clean the area around the compressor wheel.
3. Remove the blow-by hose.
4. Start the engine and let idle. Rev the engine and
hold at wide open throttle (WOT) for five seconds,
then release and let idle for five seconds. Repeat
this cycle for a total of five times then let the engine
idle steady for five minutes.
5. Shut off the engine.
6. Check the compressor area for an oil stream.
Caution:
• A stream of oil indicates a possible defective turbo-
charger. If mist or spray is present, however, this is
normal and is NOT indicative of a turbocharger
problem.
7. If the turbocharger is suspect, refer to the on-vehi-
cle service procedures in this section.
Installation
1. Exhaust manifold to turbocharger.
2. New gasket and turbocharger to exhaust manifold.
Tighten:
Turbo charger to 52 N
⋅m (5.3 kg⋅m/ 38 lb⋅ft)
3. Tighten the cylinder head to turbinhousing and ex-
haust manifold to the specified torque in the nu-
merical order shown in the illustration. (4HG1-T)
Tighten:
Exhaust manifold to 34 N
⋅m (3.5 kg⋅m/ 25 lb⋅ft)
Play in axial clearance
mm (in)
Standard
Limit
0.013 — 0.097
(0.0005 — 0.0038)
0.097
(0.0038)
N6A1378E
N6A1379E
N6A1380E
TURBOCHARGER 6G-7
4. Turbocharger to exhaust adapter.
Tighten:
Exhaust adapter to 32 N
⋅m (3.3 kg⋅m/ 24 lb⋅ft)
5. Exhaust pipe to exhaust adapter.
Tighten:
Exhaust pipe to 67 N
⋅m (6.8 kg⋅m/ 49 lb⋅ft)
6. Turbocharger oil drain line.
Tighten:
Oil drain line to
• Turbocharger 9 N
⋅m (0.9 kg⋅m/ 6 lb⋅ft)
• Cylinder body 21 N
⋅m (2.1 kg⋅m/ 15 lb⋅ft)
7. Turbocharger oil supply line to turbocharger.
Tighten:
Oil supply line to 27 N
⋅m (2.8 kg⋅m/ 20 lb⋅ft)
8. Water supply and drain lines.
Tighten:
Water supply to 41 N
⋅m (4.2 kg⋅m/ 30 lb⋅ft)
9. Heat shield to exhaust adapter
10. Charge air pipe connecting hoses and clamps to
turbocharger.
11. Air inlet pipe to turbocharger.
12. Fit the connecting hose over the pipe to its project-
ing part. (4HG1-T)
13. Align connecting hose and pipe marks with each
other (4HG1-T)
N6A1381E
N6A1382E
Legend
1. Mark
N6A1383E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст