Suzuki Grand Vitara JB419. Service manual — part 105
Electronic Stability Program: 4F-53
Specifications
Tightening Torque Specifications
S5JB0B4607001
Reference:
For the tightening torque of fastener not specified in this section, refer to “Fastener Information in Section 0A”.
Special Tools and Equipment
Special Tool
S5JB0B4608001
Fastening part
Tightening torque
Note
N
⋅m
kgf-m
lb-ft
Yaw rate / G sensor assembly bolt
8
0.8
6.0
09956–02311
SUZUKI scan tool
Brake pressure gauge
—
This kit includes following
items. 1. Tech 2, 2. PCMCIA
card, 3. DLC cable, 4. SAE
16/19 adapter, 5. Cigarette
cable, 6. DLC loop back
adapter, 7. Battery power
cable, 8. RS232 cable, 9.
RS232 adapter, 10. RS232
loop back connector, 11.
Storage case, 12.) / ) / ) /
)
4F-54 Electronic Stability Program:
Table of Contents 5- i
5
Section 5
CONTENTS
Transmission / Transaxle
Precautions . . . . . . . . . . . . .5-1
Precautions. . . . . . . . . . . . . . . . 5-1
Precautions for Transmission / Transaxle. . . . 5-1
Manual Transmission/Transaxle . . . 5B-1
General Description . . . . . . . . . . . .5B-1
Manual Transmission Construction. . . . . . 5B-1
Diagnostic Information and Procedures. . . 5B-2
Manual Transmission Symptom Diagnosis . . . 5B-2
Repair Instructions . . . . . . . . . . . ..5B-3
Manual Transmission Assembly Components . 5B-3
Gear Shift Lever Case Assembly
Components. . . . . . . . . . . . . .. 5B-5
Gear Shift Shaft and Fork Components. . . .. 5B-6
Input Shaft Assembly, Main Shaft Assembly
and Countershaft Assembly Components . . 5B-7
Manual Transmission Oil Level Check. . . . 5B-8
Manual Transmission Oil Change . . . . . ... 5B-8
Transmission Shift Control Lever Removal
and Installation. . . . . . . . . . . . .. 5B-9
Transmission Shift Control Lever Inspection. .5B-11
Back Up Light Switch Removal and
Installation. . . . . . . . . . . . . ...5B-11
Back Up Light Switch Inspection. . . . . ... 5B-11
Gear Shift Lever Case Assembly Removal
and Installation. . . . . . . . . . . . 5B-12
Gear Shift Lever Case Assembly
Disassembly and Reassembly. . . . . . 5B-13
Gear Shift Lever Case Assembly Inspection. .5B-13
Engine Rear Mounting Replacement . . . . 5B-13
Manual Transmission Assembly Dismounting
and Remounting. . . . . . . . . . . .. 5B-14
Manual Transmission Unit Disassembly . . ... 5B-16
Manual Transmission Unit Reassembly. . . 5B-18
Locating Spring Inspection. . . . . . . . 5B-22
Input Shaft Assembly Disassembly and
Reassembly . . . . . . . . . . . . . 5B-22
Input Shaft Inspection . . . . . . . . . ... 5B-23
Main Shaft Disassembly . . . . . . . . ...5B-23
Main Shaft Inspection . . . . . . . . . ... 5B-24
Main Shaft Reassembly . . . . . . . . . 5B-26
Countershaft Assembly Disassembly and
Reassembly . . . . . . . . . . . . . 5B-29
Reverse Idle Gear Assembly Disassembly
and Reassembly . . . . . . . . . . . .5B-31
Countershaft and Reverse Idle Gear
Inspection. . . . . . . . . . . . . . 5B-32
Manual Transmission Adapter Case
Disassembly and Assembly . . . . . . . 5B-32
Specifications. . . . . . . . . . . . . .5B-33
Tightening Torque Specifications. . . . . ..5B-33
Special Tools and Equipment . . . . . . ...5B-33
Recommended Service Material . . . . . ...5B-33
Special Tool . . . . . . . . . . . . . ..5B-34
Clutch . . . . . . . . . . . . . ... 5C-1
General Description . . . . . . . . . . . .5C-1
Clutch (Hydraulic Type) Construction . . . . .5C-1
Component Location . . . . . . . . . . ...5C-2
Clutch Fluid Pipe and Hose Location . . . . ..5C-2
Diagnostic Information and Procedures. . . 5C-*
Clutch (Hydraulic Type) Symptom Diagnosis. .. 5C-*
Repair Instructions . . . . . . . . . . . ..5C-2
Clutch Pedal Height Inspection . . . . . . ... 5C-*
Clutch Pedal Free Travel Check . . . . . . . 5C-*
Clutch Fluid Inspection. . . . . . . . . . 5C-*
Air Bleeding of Clutch System. . . . . . . .5C-2
Clutch Pedal Position (CPP) Switch Removal
and Installation . . . . . . . . . . . . .. 5C-*
Clutch Pedal Position (CPP) Switch
Inspection and Adjustment. . . . . . . . 5C-*
Clutch Fluid Pipe and Hose Removal and
Installation . . . . . . . . . . . . . . . 5C-*
Clutch Fluid Pipe and Hose Inspection . . . ... 5C-*
Clutch Master Cylinder Removal and
Installation . . . . . . . . . . . . . . .5C-3
Clutch Master Cylinder Inspection . . . . . .. 5C-*
Clutch Operating Cylinder Assembly
Removal and Installation. . . . . . . . ...5C-4
Clutch Cover, Clutch Disc and Flywheel
Components. . . . . . . . . . . . . ..5C-5
Clutch Cover, Clutch Disc and Flywheel
Removal and Installation. . . . . . . . ...5C-5
Clutch Cover, Clutch Disc and Flywheel
Inspection. . . . . . . . . . . . . . .. 5C-*
Specifications. . . . . . . . . . . . . ...5C-7
Tightening Torque Specifications. . . . . . 5C-7
Special Tools and Equipment . . . . . . . .5C-7
Recommended Service Material . . . . . . .5C-7
NOTE
For the items with asterisk (*) in the “CONTENTS” below, refer to the same section of the service manual
mentioned in the “FOREWORD” of this manual.
5-ii Table of Contents
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст