Nissan X-Trail 32. Instruction — part 236
BODY CONSTRUCTION
BRM-105
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
BODY CONSTRUCTION
Body Construction
INFOID:0000000010843501
Outer side body
Outer front pillar reinforcement
Upper inner front pillar
Weld nut
Side dash
Upper hinge plate
Upper dash
Rear hoodledge reinforcement
Lower front pillar hinge brace
JSKIA4721ZZ
BRM-106
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
BODY CONSTRUCTION
Lower hinge plate
Lower dash
Outer sill reinforcement
Lower front pillar reinforcement
Inner sill
Front floor
Front side member outrigger
Inner center pillar
Center pillar hinge brace
Lower center pillar hinge brace
Anchor plate
Inner sill extension
Rear floor front extension
Inner rear wheelhouse
Outer rear wheelhouse
Inner rear pillar
Inner rear pillar reinforcement
Rear pillar seat belt anchor
Back pillar seat belt anchor
Rear roof rail brace
Upper back pillar reinforcement
Center back pillar main
REPLACEMENT OPERATIONS
BRM-107
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
REPLACEMENT OPERATIONS
Description
INFOID:0000000010843502
• This section is prepared for technicians who have attained a high level of skill and experience in repairing
collision-damaged vehicles and also use modern service tools and equipment. Persons unfamiliar with body
repair techniques should not attempt to repair collision-damaged vehicles by using this section.
• Technicians are also encouraged to read the Body Repair Instruction (Fundamentals) in order to ensure that the
original functions and quality of the vehicle are maintained. The Body Repair Instruction (Fundamentals) con-
tains additional information, including cautions and warnings, that are not including in this instruction. Techni-
cians should refer to both instructions to ensure proper repair.
• Please note that this information is prepared for worldwide usage, and as such, certain procedures might not
apply in some regions or countries.
The symbols used in this section for welding operations are shown below.
Symbol marks
Description
2-spot welds
3-spot welds
MIG plug weld
For 3 panels plug weld method
MIG seam weld / Point weld
JSKIA0049ZZ
JSKIA0053ZZ
JSKIA0050ZZ
JSKIA0051ZZ
JSKIA0054ZZ
JSKIA0055ZZ
JSKIA0052ZZ
JSKIA0056ZZ
BRM-108
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
REPLACEMENT OPERATIONS
• Front pillar butt joint can be determined anywhere within shaded
area as shown in the figure. The best location for the butt joint is at
position A due to the construction of the vehicle.
• Determine cutting position and record distance from the locating
indent. Use this distance when cutting the service part. Cut outer
front pillar over 60 mm (2.36 in) above the inner front pillar cut
position.
• Prepare a cutting jig to make outer pillar easier to cut. Also, this will
permit the service part to be accurately cut at the joint position.
• An example of cutting operation using a cutting jig is as per the fol-
lowing.
1.
Mark cutting lines.
A: Cut position of outer pillar
B: Cut position of inner pillar
2.
Align cutting line with notch on jig. Clamp jig to pillar.
3.
Cut outer pillar along groove of jig (at position A).
4.
Remove jig and cut remaining portions.
5.
Cut inner pillar at position B in same manner.
Welding of Ultra High Strength Steel
INFOID:0000000010843503
SPOT WELDING
Spot welding is limited to ultra high strength steel (tensile strength: 980 MPa) according to the welding condi-
tions listed below.
CAUTION:
• If the below welding conditions cannot be met, then perform plug welding.
• Never spot weld ultra high strength steel of tensile strength more than 980 MPa. For this type of ultra
high strength steel, perform plug welding.
PIIA0150E
JSKIA0104GB
JSKIA0105GB
PIIA0153E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст