Nissan Leaf. Instruction — part 354
BRM-40
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
View D and G: Before installing front suspension mounting bracket (Rear)
z
Front side member assembly (LH)
z
Front side member closing plate as-
sembly (LH)
z
Front suspension mounting bracket
(LH Rear)
High voltage system parts (Removal required depending on damage)
z
Service plug
z
Front side Li-ion battery high voltage harness connector
z
Charge port
z
PTC elements heater
z
Traction motor
z
Electric compressor
z
Traction motor inverter
z
DC/DC-J/B
Front
Drill
φ 8 mm (0.31 in) hole for the plug welding hole (ultra high strength steel plate).
AWKIA2294ZZ
REPLACEMENT OPERATIONS
BRM-41
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
Front Side Member (Partial Replacement)
INFOID:0000000010121702
Work after radiator core support is removed.
Front
N·m (kg-m, ft-lb)
M. Bolt diameter 12 mm (0.47 in) N. Bolt diameter 13 mm (0.51 in)
AWKIA2384ZZ
BRM-42
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
View A: Before installing outer add on frame bracket
Front
Replacement parts
z
Front suspension mounting bracket
(RH Front)
z
Outer add on frame bracket (RH)
High voltage system parts (Removal required depending on damage)
z
Service plug
z
Front side Li-ion battery high voltage harness connector
z
Charge port
AWKIA2388ZZ
REPLACEMENT OPERATIONS
BRM-43
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
Front Pillar
INFOID:0000000010121703
Work after hoodledge reinforcement is removed.
Unit: mm (in)
1. Body sealing
2. Front pillar brace
3. Urethane foam
Drill
φ 8 mm (0.31 in) hole for the plug welding hole (ultra high strength steel plate).
Front
Replacement parts
z
Side body assembly (LH)
z
Side dash (LH)
AWKIA2392ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст