Nissan Versa Note. Instruction — part 153
CHG
CHARGING SYSTEM
CHG-13
< WIRING DIAGRAM >
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
AAMIA1694GB
CHG-14
< BASIC INSPECTION >
DIAGNOSIS AND REPAIR WORKFLOW
BASIC INSPECTION
DIAGNOSIS AND REPAIR WORKFLOW
Work Flow (With EXP-800 NI or GR8-1200 NI)
INFOID:0000000009682024
CHARGING SYSTEM DIAGNOSIS WITH EXP-800 NI OR GR8-1200 NI
To test the charging system, use the following special service tools:
• EXP-800 NI Battery and electrical diagnostic analyzer
• GR8-1200 NI Multitasking battery and electrical diagnostic station
NOTE:
Refer to the applicable Instruction Instruction for proper charging system diagnosis procedures.
CHG
DIAGNOSIS AND REPAIR WORKFLOW
CHG-15
< BASIC INSPECTION >
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
OVERALL SEQUENCE
DETAILED FLOW
NOTE:
To ensure a complete and thorough diagnosis, the battery, stater and generator test segments must be done
as a set from start to finish.
1.
PRELIMINARY INSPECTION
Perform the preliminary inspection. Refer to
.
AWMIA1283GB
CHG-16
< BASIC INSPECTION >
DIAGNOSIS AND REPAIR WORKFLOW
>> GO TO 2.
2.
STOP POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM
Stop the operation of the power generation voltage variable control in either of the following procedures.
• After selecting “ENGINE” using CONSULT, set the DUTY value of “ALTERNATOR DUTY” to 0 % by select-
ing “ALTERNATOR DUTY” of “Active Test”. Continue “Active Test” until the end of inspection. (When the
DUTY value is 0 or 100 %, the normal power generation is performed according to the characteristic of the
IC regulator of the generator.)
• Turn the ignition switch OFF, and disconnect the battery current sensor connector. [However, DTC (P1550–
P1554) of the engine might remain. After finishing the inspection, connect the battery current sensor connec-
tor and erase the self diagnosis results history of the engine using CONSULT.]
>> GO TO 3.
3.
DIAGNOSIS WITH EXP-800 NI OR GR8-1200 NI
Perform the charging system test using Multitasking battery and electrical diagnostic station GR8-1200 NI or
Battery and electrical diagnostic analyzer EXP-800 NI. Refer to the applicable Instruction Instruction for proper
testing procedures.
Test result
NO PROBLEMS>>Charging system is normal and will also show “DIODE RIPPLE” test result.
NO VOLTAGE>>GO TO 4.
LOW VOLTAGE>>GO TO 12.
HIGH VOLTAGE>>GO TO 14.
EXCESSIVE RIPPLE, OPEN PHASE, OPEN DIODE or SHORTED DIODE>>Replace the generator. Refer
to
CHG-29, "Removal and Installation"
. Perform “DIODE RIPPLE” test again using Multitasking
battery and electrical diagnostic station GR8-1200 NI or Battery and electrical diagnostic analyzer
EXP-800 NI to confirm repair.
4.
INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)
Turn the ignition switch ON.
Does the charge warning lamp illuminate?
YES
>> GO TO 6.
NO
>> GO TO 5.
5.
“L” TERMINAL CIRCUIT (OPEN) INSPECTION
Check “L” terminal circuit (open). Refer to
Is the “L” terminal circuit normal?
YES
>> Replace generator. Refer to
CHG-29, "Removal and Installation"
NO
>> Repair as needed.
6.
INSPECTION WITH CHARGE WARNING LAMP (IDLING)
Start the engine and run it at idle.
Does the charge warning lamp turn OFF?
YES
>> GO TO 9.
NO
>> GO TO 7.
7.
“L” TERMINAL CIRCUIT (SHORT) INSPECTION
Check “L” terminal circuit (short). Refer to
Is the “L” terminal circuit normal?
YES
>> GO TO 8.
NO
>> Repair as needed.
8.
“S” TERMINAL CIRCUIT INSPECTION
Check “S” terminal circuit. Refer to
Is the “S” terminal circuit normal?
YES
>> GO TO 10.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст