Nissan GT-R. Instruction — part 89
EM-4
< PRECAUTION >
PRECAUTIONS
1.
Clamp valve stem in a vice.
2.
The valve has a specially-hardened surface. To cut through it,
first remove a half-round section, approximately 30 mm (1.18 in)
long using air-powered grinder until black color is removed and
silver color appears.
3.
Use hacksaw to cut through approximately half the diameter of
valve stem. Make the serration at a point 40 mm (1.57 in) from
the end of valve stem.
4.
Cover the serrated end of the valve with a large shop towel (A).
Strike the valve face end with a hammer, separating it into two
pieces.
5.
Fill a bucket (such as a 20 oil can) with at least 10 (2-1/4
lmp gal) of water. Carefully place the alreadycut (serrated)
valves into the water one-at-a-time using a set of large tweezers
and quickly move away at least 2.7 m (9 ft).
6.
The valves should be placed in a standing position as shown in
the illustration to allow complete reaction. After the bubbling
action has subsided, additional valves can be placed into the
bucket allowing each subsequent chemical reaction to subside.
However, no more than 8 valves should be placed in the same
10 (2-1/4 lmp gal) amount of water. The complete chemical
reaction may take as long as 4 to 5 hours. Remove the valves
using a set of large tweezers after the chemical reaction has
stopped. Afterwards, valves can be disposed as ordinary scrap.
General Precautions
INFOID:0000000009162807
CAUTION:
After finishing servicing, check that all the tools and waste are stored in a customary place.
Precautions For Engine Service
INFOID:0000000009162808
DRAINING ENGINE COOLANT
Drain engine coolant and engine oil when the engine is cooled.
A
: Black color
B
: Silver color
c
: 47 mm (1.85 in)
d
: 17 mm (0.67 in)
JPBIA4964ZZ
a
: 32 mm (1.26 in)
JPBIA4965ZZ
JPBIA4966ZZ
A
: Bucket (Such as 20
oil can)
JPBIA4967ZZ
PRECAUTIONS
EM-5
< PRECAUTION >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
Definitions of Bank Names
INFOID:0000000009162811
• In this instruction, each bank name is defined as follows:
• For cylinder numbers and bank layout, refer to the illustration.
A
: Bank 1 (The conventional right bank)
B
: Bank 2 (The conventional left bank)
: Engine front
Bank 1
: The bank side including cylinder No. 1
(odd-numbered cylinder side)
Bank 2
: The other bank side of the above
(even-numbered cylinder side)
JPBIA1135ZZ
EM-6
< PERIODIC MAINTENANCE >
DRIVE BELT
PERIODIC MAINTENANCE
DRIVE BELT
Exploded View
INFOID:0000000009162814
Checking
INFOID:0000000009162815
WARNING:
Be sure to perform this step when engine is stopped.
• Check that the indicator (C) (notch on fixed side) of drive belt auto-tensioner is within the possible use range
(A).
NOTE:
• Check the drive belt auto-tensioner indication when the engine is cold.
• When new drive belt is installed, the indicator (notch on fixed side) should be within the range (B) in the fig-
ure.
• Visually check entire drive belt for wear, damage or cracks.
• If the indicator (notch on fixed side) is out of the possible use range or belt is damaged, replace drive belt.
JPBIA0002ZZ
1.
Power steering oil pump
2.
Alternator
3.
Drive belt auto-tensioner
4.
Crankshaft pulley
5.
A/C compressor
6.
Idler pulley
7.
Drive belt
8.
Idler pulley
A.
Possible use range
B.
Range when new drive belt is installed
C.
Indicator
D.
View D
AIR CLEANER FILTER
EM-7
< PERIODIC MAINTENANCE >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
AIR CLEANER FILTER
Removal and Installation
INFOID:0000000009162819
REMOVAL
1.
Unhook clips (A) and remove holder (1) from air cleaner case.
2.
Remove air cleaner filter (2) from holder (1).
INSTALLATION
Note the following, and install in the reverse order of removal.
• Install the air cleaner filter by aligning the seal with the notch of air cleaner case.
NNBIA0177ZZ
NNBIA0178ZZ