Nissan Pathfinder (2009 year). Instruction — part 391
FUEL INJECTOR AND FUEL TUBE
EM-185
< ON-VEHICLE REPAIR >
[VK56DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
• Insert new O-ring straight into fuel tube. Do not twist it.
6.
Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
After installing the fuel tubes, make sure there are no fuel leaks at the connections using the following steps.
1.
Apply fuel pressure to the fuel lines by turning ignition switch ON (with engine stopped). Then check for
fuel leaks at the connections.
2.
Start the engine and rev it up and check for fuel leaks at the connections.
WARNING:
Do not touch the engine immediately after stopping, as engine becomes extremely hot.
NOTE:
Use mirrors for checking on hidden points.
2009 Pathfinder
EM-186
< ON-VEHICLE REPAIR >
[VK56DE]
TIMING CHAIN
TIMING CHAIN
Exploded View
INFOID:0000000003939560
AWBIA0100GB
2009 Pathfinder
TIMING CHAIN
EM-187
< ON-VEHICLE REPAIR >
[VK56DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
Removal and Installation
INFOID:0000000003939561
NOTE:
• To remove timing chain and associated parts, start with those on the LH bank. The procedure for removing
parts on the RH bank is omitted because it is the same as that for removal on the LH bank.
• To install timing chain and associated parts, start with those on the RH bank. The procedure for installing
parts on the LH bank is omitted because it is the same as that for installation on the RH bank.
REMOVAL
1.
Remove the engine assembly from the vehicle. Refer to
EM-220, "Removal and Installation"
.
2.
Remove the following components and related parts:
• Drive belt auto tensioner and idler pulley. Refer to
EM-156, "Drive Belt Auto Tensioner and Idler Pulley"
.
• Thermostat housing and water hose. Refer to
CO-54, "Removal and Installation"
• Power steering oil pump bracket. Refer to
ST-21, "Removal and Installation"
.
• Oil pan (lower), (upper) and oil strainer. Refer to
EM-175, "Removal and Installation"
• Ignition coil. Refer to
EM-179, "Removal and Installation"
• Rocker cover. Refer to
EM-180, "Removal and Installation"
3.
Remove the Intake valve control solenoid valve cover (RH) (A)
and Intake valve control solenoid valve cover (LH) (B) as fol-
lows:
a.
Loosen and remove the bolts as shown.
b.
Cut the liquid gasket and remove the covers using Tool.
CAUTION:
Do not damage mating surfaces.
1.
Camshaft sprocket LH bank EXH
2.
Camshaft sprocket LH bank INT
(VTC)
3.
Camshaft sprocket RH bank INT
(VTC)
4.
Camshaft sprocket RH bank EXH
5.
Front cover
6.
Intake valve control solenoid valve
(RH)
7.
Intake valve control solenoid valve
cover (RH)
8.
Intake valve timing control position
sensor (RH)
9.
Intake valve timing control position
sensor (LH)
10.
Intake valve control solenoid valve
cover (LH)
11.
Camshaft position sensor (PHASE)
12
Crankshaft pulley bolt
13.
Crankshaft pulley
14.
Chain tensioner cover
15.
Front oil seal
16.
Intake valve control solenoid valve
(LH)
17.
O-ring
18.
Timing chain tension guide RH bank
19.
Timing chain slack guide (RH)
20.
Timing chain RH bank
21.
Timing chain LH bank
22.
Chain tensioner (RH)
23.
Timing chain slack guide LH bank
24.
Timing chain tension guide LH bank
25.
Chain tensioner (LH)
26.
O-ring
27.
Bracket
28.
Oil pump drive spacer
29.
Oil pump assembly
30.
Crankshaft sprocket
A.
To crankshaft
B.
To camshaft LH bank EXH
C.
To camshaft LH bank INT (VTC)
D.
To camshaft RH bank INT (VTC)
E.
To camshaft RH bank EXH
F.
Apply sealant to mating side
G.
Tool number
: KV10111100 (J-37228)
WBIA0798E
2009 Pathfinder
EM-188
< ON-VEHICLE REPAIR >
[VK56DE]
TIMING CHAIN
4.
Obtain compression TDC of No. 1 cylinder as follows:
a.
Turn the crankshaft pulley clockwise to align the TDC identifica-
tion notch (without paint mark) with the timing indicator on the
front cover.
b.
At this time, make sure both intake and exhaust cam lobes of
No. 1 cylinder (top front on LH bank) point outside.
• If they do not point outside, turn crankshaft pulley once more.
5.
Remove the crankshaft pulley.
a.
Loosen the crankshaft pulley bolts using a hammer handle to
secure the crankshaft.
b.
Remove the crankshaft pulley from the crankshaft using tool.
• Remove the crankshaft pulley using suitable tool. Set the bolts
in the two bolt holes [M6 x 1.0 mm (0.04 in)] on the front sur-
face.
NOTE:
The dimension between the centers of the two bolt holes is 61
mm (2.40 in).
6.
Remove the front cover.
a.
Loosen and remove the bolts in the reverse of order shown.
b.
Cut the liquid gasket and remove the covers using Tool.
CAUTION:
Do not damage mating surfaces.
7.
Remove the front oil seal using suitable tool.
CAUTION:
Do not damage front cover.
KBIA2476E
KBIA0400J
PBIC0053E
KBIA2477E
Tool number
: KV10111100 (J-37228)
KBIA2478E
2009 Pathfinder
TIMING CHAIN
EM-189
< ON-VEHICLE REPAIR >
[VK56DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
8.
Remove the oil pump drive spacer.
• Hold and remove the flat space of the oil pump drive spacer by
pulling it forward.
9.
Remove the oil pump. Refer to
LU-30, "Removal and Installation"
10. Remove the chain tensioner on the LH bank using the following steps.
NOTE:
To remove the timing chain and associated parts, start with those on the LH bank. The procedure for
removing parts on the RH bank is omitted because it is the same as that for the LH bank.
a.
Squeeze the return-proof clip ends using suitable tool and push
the plunger into the tensioner body.
b.
Secure the plunger using stopper pin.
• Stopper pin is made from hard wire approximately 1 mm (0.04
in) in diameter.
c.
Remove the bolts and chain tensioner.
WARNING:
Plunger, spring, and spring seat pop out when (squeezing)
return-proof clip without holding plunger head. It may
cause serious injuries. Always hold plunger head when
removing.
NOTE:
• Stop the plunger in the fully extended position by using the
return-proof clip (1) if the stopper pin is removed.
• Push the plunger (2) into the tensioner body while squeezing
the return-proof clip (1). Secure it using stopper pin (3).
11. Remove the timing chain tension guide and timing chain slack guide.
12. Remove the timing chain and crankshaft sprocket.
13. Loosen the camshaft sprocket bolts as shown and remove the
camshaft sprocket.
• A: Camshaft holding location
CAUTION:
To avoid interference between valves and pistons, do not
turn crankshaft or camshaft when timing chain is discon-
nected.
14. Repeat the same procedure to remove the RH timing chain and
associated parts.
INSPECTION AFTER REMOVAL
KBIA2512E
KBIA2479E
KBIA2483E
WBIA0799E
2009 Pathfinder
EM-190
< ON-VEHICLE REPAIR >
[VK56DE]
TIMING CHAIN
Check for cracks and any excessive wear at link plates. Replace
chain if necessary.
• In the same way as for the LH bank, inspect the timing chain and
associated parts on the RH bank.
INSTALLATION
NOTE:
• The above figure shows the relationship between the mating mark on each timing chain and that of the cor-
responding sprocket, with the components installed.
• To install the timing chain and associated parts, start with those on the RH bank. The procedure for installing
parts on the LH bank is omitted because it is the same as that for installation on the RH bank.
PBIC0282E
AWBIA0150ZZ
1.
Camshaft sprocket RH bank INT
(VTC)
2.
Camshaft sprocket RH bank EXH
3.
Camshaft dowel pin RH bank
4.
Timing chain RH bank
5.
Timing chain slack guide RH bank
6.
Chain tensioner (RH)
7.
Crankshaft sprockets
8.
Crankshaft key
9.
Timing chain tension guide LH bank
10. Timing chain LH bank
11.
Camshaft dowel pin LH bank
12. Camshaft sprocket LH bank EXH
13. Camshaft sprocket LH bank INT
(VTC)
14. Chain tensioner (LH)
15. Timing chain tension guide RH bank
16. Timing chain slack guide LH bank
A.
LH bank
B.
RH bank
C.
Alignment mark (Link color: blue)
D.
Alignment mark (Link color: blue)
E.
Alignment mark (Identification mark)
F.
Alignment mark for LH bank (Notch) G.
Alignment mark for LH bank (Link
color: copper)
H.
Alignment mark for RH bank (Link
color: copper)
J.
Alignment mark (Link color: blue)
K.
Alignment mark (Identification mark) L.
Alignment mark (Identification mark)
M
Alignment mark (Link color: blue)
N.
Alignment mark (Identification mark)
2009 Pathfinder
TIMING CHAIN
EM-191
< ON-VEHICLE REPAIR >
[VK56DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
1.
Make sure the crankshaft key and camshaft dowel pin RH bank
and camshaft dowel pin LH bank are facing in the direction
shown.
2.
Install the camshaft sprockets.
• Install the camshaft sprocket INT (VTC) (A) and camshaft
sprockets EXH (B) by selectively using the groove of the
dowel pin according to the bank. (Common part used for both
exhaust banks.)
NOTE:
Use the groove marked (R) for RH bank and (L) for LH bank.
• Lock the hexagonal part of the camshaft in the same way as
for removal, and tighten the bolts.
• A : Intake
• B = V: Exhaust
3.
Install the crankshaft sprockets for both banks.
• Install LH bank crankshaft sprocket (B) and RH bank crank-
shaft sprocket (C) so that their flange side (A) (the larger diam-
eter side without teeth) faces in the direction shown.
NOTE:
The same parts are used but facing directions are different.
4.
Install the timing chains and associated parts.
• Align the alignment mark on each sprocket and the timing chain for installation.
CAUTION:
• Before installing chain tensioner, it is possible to change the position of alignment mark on
timing chain and each sprocket. After the alignment marks are aligned, keep them aligned by
holding them by hand.
• Install the slack guides and tension guides onto the correct side by checking the identification mark on
the surface.
• Install the chain tensioner with the plunger locked in with the stopper pin.
CAUTION:
• Before and after the installation of the chain tensioner, make sure that the alignment mark on
the timing chain is not out of alignment.
• After installing the chain tensioner, remove the stopper pin to release the chain tensioner.
Make sure the chain tensioner is released.
• To avoid chain-link skipping of the timing chain, do not move crankshaft or camshafts until the
front cover is installed.
5.
In the same way as for the RH bank, install the timing chain and associated parts on the LH bank.
6.
Install the oil pump.
SBIA0356E
AWBIA0151ZZ
WBIA0701E
2009 Pathfinder
EM-192
< ON-VEHICLE REPAIR >
[VK56DE]
TIMING CHAIN
7.
Install the oil pump drive spacer as follows:
• Install so that the front mark on the front edge of the oil pump
drive spacer faces the front of the engine.
• Insert the oil pump drive spacer according to the directions of
the crankshaft key and the two flat surfaces of the oil pump
inner rotor.
• If the positional relationship does not allow the insertion, rotate
the oil pump inner rotor to allow the oil pump drive spacer to
be inserted.
8.
Install the front oil seal using suitable tool.
CAUTION:
Do not scratch or make burrs on the circumference of the
oil seal.
9.
Install the chain tensioner cover.
• Apply liquid gasket as shown.
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-26, "Recommended Chemical Products and Sealants"
.
10. Install the front cover as follows:
a.
Install a new O-ring on the cylinder block.
KBIA2490E
PBIC0059E
KBIA2547E
KBIA2516E
2009 Pathfinder