Nissan Qashqai (2007-2010). Manual — part 844
HEATER CORE
VTL-41
< ON-VEHICLE REPAIR >
[AUTOMATIC AIR CONDITIONER]
C
D
E
F
G
H
J
K
L
M
A
B
VTL
N
O
P
HEATER CORE
Exploded View
INFOID:0000000001093726
Removal and Installation
INFOID:0000000001093727
REMOVAL
1.
Intake connector seal
2.
Blower motor assembly
3.
Heater pipe seal
4.
Air conditioner filter
5.
Air conditioner filter cover
6.
Air mix door motor (left)
7.
Air mix door lever
8.
Electrical heater
9.
Air mix door (slide door)
10.
Intake sensor
11.
Evaporator and expansion valve unit
12. Center case (lower)
13.
Center case (upper)
14.
Defroster door
15. Intake door motor
16.
Intake motor bracket
17.
Intake connector
18. Heater core
19.
Air mix door link bracket
20.
Front ventilator door
21. Side ventilator door
22.
Intake door lever
23.
Intake door box
24. Intake door
25.
Mode door motor
26.
Air mix door link (left)
27. Heater and cooling unit case
28.
Air mix door motor (right)
29.
Aspirator
30. Air mix door link (right)
*
With left and right ventilation temperature separately system.
Refer to
for symbols in the figure.
E1IIA0008GB
VTL-42
< ON-VEHICLE REPAIR >
[AUTOMATIC AIR CONDITIONER]
HEATER CORE
1.
Remove LH instrument lower panel (LHD).
2.
Remove glove box (RHD). Refer to
IP-12, "Removal and Installation"
3.
Remove LH foot duct.
4.
Disconnect harness connectors, remove harness bracket (1).
5.
Remove air mix door motor fixing screw.
6.
Remove air mix door motor (4), from heater.
7.
Remove heater core pipes metal clip retainers (2).
CAUTION:
Use shop cloth and all other protection necessaries to
avoid damaging floor carpet.
8.
Remove heater pipes as shown.
9.
Pull to remove heater core.
INSTALLATION
Installation is basically the reverse order of removal.
E1IIA0022ZZ
DUCTS AND GRILLES
VTL-43
< ON-VEHICLE REPAIR >
[AUTOMATIC AIR CONDITIONER]
C
D
E
F
G
H
J
K
L
M
A
B
VTL
N
O
P
DUCTS AND GRILLES
CENTER VENTILATOR GRILLES
CENTER VENTILATOR GRILLES : Exploded View
INFOID:0000000001093728
CENTER VENTILATOR GRILLES : Removal and Installation
INFOID:0000000001093729
REMOVAL
1.
Remove cluster lid C. Refer to
IP-12, "Removal and Installation"
2.
Remove center ventilator grilles.
1.
Center defroster duct
2.
Defroster duct - RH
3.
Side ventilator duct - RH
4.
Front upper ventilator duct
5.
Front ventilator duct
6.
Defroster duct - LH
7.
Side foot duct - RH
8.
Clip
9.
Air mix duct
10. Side ventilator duct - LH
11. Glove box duct
12. Side foot duct - LH
13. Front defroster grille - center
14. Instrument panel
15. Side defroster grille - RH
16. Side defroster grille - LH
17. Side ventilation grille - RH
18. Side ventilation grille - LH
19. Center ventilation grille
20. Cluster lid C
21. Floor duct - RH
22. Floor duct - LH
E1IIA0023ZZ
VTL-44
< ON-VEHICLE REPAIR >
[AUTOMATIC AIR CONDITIONER]
DUCTS AND GRILLES
• Push pawl (A).
• Push center ventilator grille from the back, to remove it.
CAUTION:
Use shop cloth and all other protection necessaries to avoid
damage.
INSTALLATION
Installation is basically the reverse order of removal.
SIDE VENTILATOR GRILLES
SIDE VENTILATOR GRILLES : Exploded View
INFOID:0000000001093730
SIDE VENTILATOR GRILLES : Removal and Installation
INFOID:0000000001093731
E1IIA0034ZZ
1.
Center defroster duct
2.
Defroster duct - RH
3.
Side ventilator duct - RH
4.
Front upper ventilator duct
5.
Front ventilator duct
6.
Defroster duct - LH
7.
Side foot duct - RH
8.
Clip
9.
Air mix duct
10. Side ventilator duct - LH
11. Glove box duct
12. Side foot duct - LH
13. Front defroster grille - center
14. Instrument panel
15. Side defroster grille - RH
16. Side defroster grille - LH
17. Side ventilation grille - RH
18. Side ventilation grille - LH
19. Center ventilation grille
20. Cluster lid C
21. Floor duct - RH
22. Floor duct - LH
E1IIA0023ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст