Nissan Tiida C11. Instruction — part 600
EC-1050
< BASIC INSPECTION >
[K9K]
INSPECTION AND ADJUSTMENT
3.
Check the continuity between high pressure supply pump (volumetric control valve) harness connector
and ECM harness connector.
4.
Also check harness for short to ground and short to power.
Is the inspection result normal?
YES
>> GO TO 11.
NO
>> Repair open circuit or short to ground or short to power in harness or connectors.
11.
CHECK HIGH PRESSURE SUPPLY PUMP (VOLUMETRIC CONTROL VALVE)-II
EC-1110, "Component Inspection"
.
Is the inspection result normal?
YES
>> GO TO 12.
NO
>> Replace high pressure supply pump.
12.
CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE) POWER SUPPLY
1.
Turn ignition switch OFF.
2.
Disconnect high pressure supply pump (pressure control valve) harness connector.
3.
Turn ignition switch ON.
4.
Check the voltage between high pressure supply pump (pressure control valve) harness connector and
ground.
Is the inspection result normal?
YES
>> GO TO 14.
NO
>> GO TO 13.
13.
DETECT MALFUNCTIONING PART
Check the following.
• IPDM E/R
• Harness for open or short between IPDM E/R and high pressure supply pump (pressure control valve)
• Harness for open or short between ECM and high pressure supply pump (pressure control valve)
>> Repair open circuit or short to ground or short to power in harness or connectors.
14.
CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE) OUTPUT SIGNAL CIR-
CUIT FOR OPEN AND SHORT
1.
Turn ignition switch OFF.
2.
Disconnect ECM harness connector.
3.
Check the continuity between high pressure supply pump (pressure control valve) harness connector and
ECM harness connector.
4.
Also check harness for short to ground and short to power.
Is the inspection result normal?
High pressure supply pump
(volumetric control valve)
ECM
Continuity
Connector
Terminal
Connector
Terminal
F54
2
F11
50
Existed
High pressure supply pump
(Pressure control valve)
Ground
Voltage
Connector
Terminal
F53
3
Ground
Battery voltage
High pressure supply pump
(Pressure control valve)
ECM
Continuity
Connector
Terminal
Connector
Terminal
F53
4
F11
49
Existed
INSPECTION AND ADJUSTMENT
EC-1051
< BASIC INSPECTION >
[K9K]
C
D
E
F
G
H
I
J
K
L
M
A
EC
N
P
O
YES
>> GO TO 15.
NO
>> Repair open circuit or short to ground or short to power in harness or connectors.
15.
CHECK HIGH PRESSURE SUPPLY PUMP (PRESSURE CONTROL VALVE)-II
EC-1123, "Component Inspection"
.
Is the inspection result normal?
YES
>> GO TO 16.
NO
>> Replace high pressure supply pump.
16.
CHECK FUEL RAIL PRESSURE SENSOR POWER SUUPLY CIRCUIT
1.
Turn ignition switch OFF.
2.
Disconnect fuel rail pressure sensor harness connector.
3.
Turn ignition switch ON.
4.
Check the voltage between fuel rail pressure sensor harness connector and ground.
Is the inspection result normal?
YES
>> GO TO 17.
NO
>> Repair open circuit or short to ground or short to power in harness or connectors.
17.
CHECK FUEL RAIL PRESSURE SENSOR GROUND CIRCUIT FOR OPEN AND SHORT
1.
Turn ignition switch OFF.
2.
Disconnect ECM harness connector.
3.
Check the continuity between fuel rail pressure sensor harness connector and ECM harness connector.
4.
Also check harness for short to ground and short to power.
Is the inspection result normal?
YES
>> GO TO 18.
NO
>> Repair open circuit or short to ground or short to power in harness or connectors.
18.
CHECK FUEL RAIL PRESSURE SENSOR INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
1.
Check the continuity between fuel rail pressure sensor harness connector and ECM harness connector.
2.
Also check harness for short to ground and short to power.
Is the inspection result normal?
YES
>> GO TO 19.
NO
>> Repair open circuit or short to ground or short to power in harness or connectors.
19.
CHECK FUEL RAIL PRESSURE SENSOR
EC-1139, "Component Inspection"
.
Is the inspection result normal?
YES
>> GO TO 20.
NO
>> Replace fuel rail.
20.
CHECK FUEL RAIL PRESSURE-I
1.
Reconnect all harness connectors disconnected.
Fuel rail pressure sensor
Ground
Voltage (V)
Connector
Terminal
F51
3
Ground
Approx. 5
Fuel rail pressure sensor
ECM
Continuity
Connector
Terminal
Connector
Terminal
F51
2
F10
15
Existed
Fuel rail pressure sensor
ECM
Continuity
Connector
Terminal
Connector
Terminal
F51
1
F10
19
Existed
EC-1052
< BASIC INSPECTION >
[K9K]
INSPECTION AND ADJUSTMENT
2.
Start engine and let it idle speed.
3.
Select “DATA MONITOR” mode with CONSULT-III.
4.
Check that the “RAIL PRESSURE” indication under the following conditions.
NOTE:
An unusual combustion noise may be heard.
Is the inspection result normal?
YES
>> GO TO 22.
NO
>> GO TO 21.
21.
CHECK FUEL RAIL PRESSURE-II
1.
Turn ignition switch OFF.
2.
Replace fuel rail. Refer to
EM-281, "Removal and Installation"
3.
Start engine and let it idle speed.
4.
Select “DATA MONITOR” mode with CONSULT-III.
5.
Check that the “RAIL PRESSURE” indication under the following conditions.
NOTE:
An unusual combustion noise may be heard.
Is the inspection result normal?
YES
>> GO TO 22.
NO
>> Replace high pressure supply pump.
22.
INSPECTION END
High pressure supply pump (volumetric control valve) OK.
>> INSPECTION END
BASIC INSPECTION : Special Repair Requirement (TEST 6: Major Leak in Fuel Injec-
tors/Fuel Injectors Open)
INFOID:0000000001162520
NOTE:
• CONDITIONS PRIOR TO TEST
- The entire low pressure system must be in good condition.
- Check the sealing of the high pressure pipes and unions.
- Test 3 High pressure supply pump (pressure control valve) check is OK
- Test 4 High pressure supply pump (volumetric control valve) check is OK
- Test 5 Rail high pressure regulation circuit check is OK.
• CAUSE
- Not enough or no rail pressure during starting.
- The engine does not start.
1.
CHECK FUEL INJECTOR-I
EC-1141, "Component Inspection"
.
Is the inspection result normal?
CONDITION (ENGINE SPEED)
INDICATION
At idle speed
190 - 210 bar
2000 rpm
400 - 500 bar
3000 rpm
500 - 700 bar
4000 rpm
700 - 900 bar
CONDITION (ENGINE SPEED)
INDICATION
At idle speed
190 - 210 bar
2000 rpm
400 - 500 bar
3000 rpm
500 - 700 bar
4000 rpm
700 - 900 bar
INSPECTION AND ADJUSTMENT
EC-1053
< BASIC INSPECTION >
[K9K]
C
D
E
F
G
H
I
J
K
L
M
A
EC
N
P
O
YES
>> GO TO 2.
NO
>> Replace malfunctioning fuel injector.
2.
CHECK INTERNAL FUEL TRANSFER PUMP
1.
Turn ignition switch OFF.
2.
Disconnect the return system connections at the fuel injectors and close off the return pipes so they are
leak-tight.
3.
To authorise a 15 second cranking engine and carry out this test it is essential to carry out the following
procedure:
-
Disconnect high pressure supply pump (volumetric control valve) harness connector
-
Turn ignition switch ON.
-
Perform “SAVE DATA FOR CPU REPLC” in WORK SUPPORT mode with CONSULT-III.
-
Perform “PRGRM REINITIALIZE” in WORK SUPPORT mode with CONSULT-III.
-
Cranking engine for at least 15 seconds (starting speed 250 rpm)
-
Perform “WRT DATA AFTR REPLC CPU” in WORK SUPPORT mode with CONSULT-III.
Is the return volume at the fuel injectors more than 20 ml per fuel injector for the starting phase?
NOTE:
•
Do not repeat this procedure more than 3 times and wait 30 seconds between each 15 second cranking
engine.
•
Then wait 30 minutes before cranking the engine for 3 15 second cycles.
•
Follow this instruction so that the starter does not get damaged.
Does the flow measure more than 20ml?
Yes
>> Replace malfunctioning fuel injector.
No
>> GO TO 3.
3.
CHECK FUEL INJECTOR-II
1.
Turn ignition switch OFF.
2.
Reconnect return pipes.
3.
Start Engine.
4.
Select “DATA MONITOR” mode with CONSULT-III.
5.
Check “RAIL PRESSURE” and “RAIL PRES SET” indication.
6.
Does “RAIL PRESSURE” follow “RAIL PRES SET” during the 3 second cranking engine?
Is the inspection result normal?
YES
>> GO TO 5.
NO
>> GO TO 4.
4.
CHECK GLOW PLUG
1.
Turn ignition switch OFF.
2.
Remove the glow plugs and check for moisture.
3.
If the glow plugs are wet with fuel, it is possible that the fuel injector is leaking.
Are the glow plugs wet with fuel?
Yes
>> Replace malfunction fuel injector.
No
>> Replace high pressure supply pump.
5.
INSPECTION END
Fuel injector system OK.
>> INSPECTION END
BASIC INSPECTION : Special Repair Requirement (TEST 7: Incorrect Fuel Injection
Quantity)
INFOID:0000000001162521
NOTE:
• CONDITIONS PRIOR TO TEST
- The entire low pressure system must be in good condition.
- Check the sealing of the high pressure pipes and unions.
- Test 3 High pressure supply pump (pressure control valve) check is OK
- Test 4 High pressure supply pump (volumetric control valve) check is OK
- Test 5 Rail high pressure regulation circuit check is OK.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст