Nissan Quest E52. Instruction — part 266
BRM-30
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Front Side Member (Partial Replacement)
INFOID:0000000009648877
Work after radiator core support and lower front hoodledge are removed.
Unit: mm (in)
: Vehicle front
Replacement parts
z
Front side member assembly
z
Front side member closing plate as-
sembly
JSKIA2456GB
REPLACEMENT OPERATIONS
BRM-31
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
POINT
The front side member on the left can also be replaced partially by cutting at the position shown in the figure.
Unit: mm (in)
: Vehicle front
Replacement parts
z
Front side member assembly (RH)
z
Front side member closing plate as-
sembly (RH)
JSKIA2457GB
BRM-32
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
NOTE:
For welding method and the number of welding points, refer to the front side member on the right.
Front Pillar
INFOID:0000000009648878
Work after hoodledge reinforcement is removed.
C.
Front side member assembly cutting
position (LH)
D.
Front side member closing plate as-
sembly cutting position (LH)
Unit: mm (in)
: Vehicle front
Replacement parts
z
Front side member assembly (LH)
z
Front side member closing plate as-
sembly (LH)
JSKIA2458GB
REPLACEMENT OPERATIONS
BRM-33
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
View B: Before installing outer front side body and front fender bracket assembly
1.
Body sealing
2.
Urethane foam
Unit: mm (in)
: Vehicle front
Replacement parts
z
Outer front side body
z
Upper front pillar reinforcement
z
Front pillar brace
z
Upper inner front pillar
z
Side dash
z
Front fender bracket assembly
JSKIA2459GB
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст