Nissan Pathfinder (2011 year). Instruction — part 371
CAMSHAFT
EM-79
< REMOVAL AND INSTALLATION >
[VQ40DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
• Equally loosen camshaft bracket bolts in several steps in
reverse order as shown.
11. Remove camshafts.
12. Remove valve lifters, if necessary.
• Identify installation positions, and store them without mixing them up.
13. Remove timing chain tensioner (secondary) from cylinder head.
• Remove timing chain tensioner (secondary) with its stopper
pin attached.
CAUTION:
Do not reuse O-rings.
NOTE:
Stopper pin was attached when timing chain (secondary) was
removed.
INSPECTION AFTER REMOVAL
Camshaft Runout
1. Put V-block on precise flat table, and support No. 2 and 4 journal
of camshaft.
CAUTION:
Do not support journal No. 1 (on the side of camshaft
sprocket) because it has a different diameter from the other
three locations.
2. Set dial indicator vertically to No. 3 journal.
3. Turn camshaft to one direction with hands, and measure the
camshaft runout on dial indicator. (Total indicator reading)
4. If it exceeds the limit, replace camshaft.
Camshaft Cam Height
PBIC2050E
PBIC2111E
Standard
: Less than 0.02 mm (0.0008 in)
Limit
: 0.05 mm (0.0020 in)
PBIC0929E
2011 Pathfinder
EM-80
< REMOVAL AND INSTALLATION >
[VQ40DE]
CAMSHAFT
1. Measure the camshaft cam height with micrometer.
2. If wear exceeds the limit, replace camshaft.
Camshaft Journal Oil Clearance
CAMSHAFT JOURNAL DIAMETER
• Measure the outer diameter of camshaft journal with micrometer.
CAMSHAFT BRACKET INNER DIAMETER
• Tighten camshaft bracket bolt with the specified torque.
• Measure the inner diameter “A” of camshaft bracket with bore
gauge.
CAMSHAFT JOURNAL OIL CLEARANCE
• (Oil clearance) = (Camshaft bracket inner diameter) – (Camshaft journal diameter).
• If the calculated value exceeds the limit, replace either or both camshaft and cylinder head.
NOTE:
Camshaft bracket cannot be replaced as a single part, because it is machined together with cylinder head.
Replace whole cylinder head assembly.
Camshaft End Play
Standard:
Intake
: 45.465 - 45.655 mm (1.7900 - 1.7974 in)
Exhaust : 45.075 - 45.265 mm (1.7746 - 1.7821 in)
Limit:
Intake
: 45.265 mm (1.7821 in)
Exhaust : 44.875 mm (1.7667 in)
EMQ0072D
Standard:
No. 1
: 25.935 - 25.955 mm (1.0211 - 1.0218 in)
No. 2, 3, 4
: 23.445 - 23.465 mm (0.9230 - 0.9238 in)
PBIC0040E
Standard:
No. 1
: 26.000 - 26.021 mm (1.0236 - 1.0244 in)
No. 2, 3, 4
: 23.500 - 23.521 mm (0.9252 - 0.9260 in)
PBIC1645E
Standard:
No. 1
: 0.045 - 0.086 mm (0.0018 - 0.0034 in)
No. 2, 3, 4 : 0.035 - 0.076 mm (0.0014 - 0.0030 in)
Limit
: 0.15 mm (0.0059 in)
2011 Pathfinder
CAMSHAFT
EM-81
< REMOVAL AND INSTALLATION >
[VQ40DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
• Install dial indicator in thrust direction on front end of camshaft.
Measure the end play of dial indicator when camshaft is moved for-
ward/backward (in direction to axis).
• Measure the following parts if out of the limit.
- Dimension “A” for camshaft No. 1 journal
- Dimension “B” for cylinder head No. 1 journal bearing
• Following the standards above, replace camshaft and/or cylinder
head.
Camshaft Sprocket Runout
1. Put V-block on precise flat table, and support No. 2 and 4 journal of camshaft.
CAUTION:
Do not support journal No. 1 (on the side of camshaft sprocket) because it has a different diameter
from the other three locations.
2. Measure the camshaft sprocket runout with dial indicator. (Total
indicator reading)
• If it exceeds the limit, replace camshaft sprocket.
Valve Lifter
Check if surface of valve lifter has any wear or cracks.
• If anything above is found, replace valve lifter. Refer to
Valve Lifter Clearance
VALVE LIFTER OUTER DIAMETER
Standard
: 0.115 - 0.188 mm (0.0045 - 0.0074 in)
Limit
: 0.24 mm (0.0094 in)
SEM864E
Standard
: 27.500 - 27.548 mm (1.0827 - 1.0846 in)
Standard
: 27.360 - 27.385 mm (1.0772 - 1.0781 in)
KBIA2404J
Limit
: 0.15 mm (0.0059 in)
PBIC0930E
KBIA0182E
2011 Pathfinder
EM-82
< REMOVAL AND INSTALLATION >
[VQ40DE]
CAMSHAFT
• Measure the outer diameter at 1/2 height of valve lifter with
micrometer since valve lifter is in barrel shape.
VALVE LIFTER HOLE DIAMETER
• Measure the inner diameter of valve lifter hole of cylinder head with
inside micrometer.
VALVE LIFTER CLEARANCE
• (Valve lifter clearance) = (Valve lifter hole diameter) – (Valve lifter outer diameter), Refer to
.
• If the calculated value is out of the standard, referring to each standard of valve lifter outer diameter and
valve lifter hole diameter, replace either or both valve lifter and cylinder head.
INSTALLATION
1. Install timing chain tensioners (secondary) on both sides of cyl-
inder head.
• Install timing chain tensioner with its stopper pin attached.
• Install timing chain tensioner with sliding part facing downward
on right-side cylinder head, and with sliding part facing upward
on left-side cylinder head.
• Install new O-rings as shown.
CAUTION:
Do not reuse O-rings.
2. Install valve lifters.
• Install it in the original position.
3. Install camshafts.
Standard (Intake and exhaust)
: 33.977 - 33.987 mm (1.3377 - 1.3381 in)
JEM798G
Standard (Intake and exhaust)
: 34.000 - 34.016 mm (1.3386 - 1.3392 in)
SEM867E
Standard (Intake and exhaust)
: 0.013 - 0.039 mm (0.0005 - 0.0015 in)
PBIC2111E
2011 Pathfinder
CAMSHAFT
EM-83
< REMOVAL AND INSTALLATION >
[VQ40DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
• Install camshaft with dowel pin attached to its front end face on
the exhaust side.
• Follow your identification marks made during removal, or fol-
low the identification marks that are present on new camshafts
for proper placement and direction.
• Install camshaft so that dowel pin hole and dowel pin on front
end face are positioned as shown. (No. 1 cylinder TDC on its
compression stroke)
NOTE:
• Large and small pin holes are located on front end face of
camshaft (INT), at intervals of 180
°
. Face small dia. side pin
hole upward (in cylinder head upper face direction).
• Though camshaft does not stop at the portion as shown, for
the placement of cam nose, it is generally accepted cam-
shaft is placed for the same direction as shown.
KBIA1071E
Bank
INT/EXH
Dowel pin
Paint marks
Identification
mark
M1
M2
RH
INT
No
Green
No
RE
EXH
Yes
No
White
RE
LH
INT
No
Green
No
LH
EXH
Yes
No
White
LH
KBIA1009E
PBIC2478E
2011 Pathfinder
EM-84
< REMOVAL AND INSTALLATION >
[VQ40DE]
CAMSHAFT
4. Install camshaft brackets.
• Remove foreign material completely from camshaft bracket
backside and from cylinder head installation face.
• Install camshaft bracket in original position and direction as
shown.
• Install camshaft brackets (No. 2 to 4) aligning the stamp marks
as shown.
NOTE:
There are no identification marks indicating left and right for
camshaft bracket (No. 1).
• Apply liquid gasket to mating surface of camshaft bracket (No.
1) as shown on right and left banks.
CAUTION:
• Use Genuine RTV Silicone Sealant or equivalent. Refer
to
GI-14, "Recommended Chemical Products and Seal-
• The components must be installed within 5 minutes of
the liquid gasket application. Then allow 30 minutes for
the liquid gasket to set before operating the engine.
• Remove water, oil, dust, dirt, or other foreign material on
all sealing surfaces prior to installation.
PBIC2051E
PBIC2052E
PBIC2660E
2011 Pathfinder
CAMSHAFT
EM-85
< REMOVAL AND INSTALLATION >
[VQ40DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
5. Tighten camshaft bracket bolts in the following steps, in numeri-
cal order as shown.
6. Measure the difference in levels between front end faces of
camshaft bracket (No. 1) and cylinder head.
• Measure two positions (both intake and exhaust side) for a
single bank.
• If the measured value is out of the standard, re-install cam-
shaft bracket (No. 1).
7. Check and adjust the valve clearance. Refer to
8. Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection of Camshaft Sprocket (INT) Oil Groove
WARNING:
• Check when engine is cold so as to prevent burns from any splashing engine oil.
CAUTION:
• Perform this inspection only when DTC P0011 or P0021 are detected in self-diagnostic results of
CONSULT-III and it is directed according to inspection procedure of EC section. Refer to
.
1. Check the engine oil level. Refer to
.
2. Perform the following procedure so as to prevent the engine from being unintentionally started while
checking.
a. Release fuel pressure. Refer to
.
b. Disconnect ignition coil and injector harness connectors.
3. Remove intake valve timing control solenoid valve. Refer to
EM-53, "Removal and Installation"
Camshaft bracket bolts
Step 1 (bolts 7 - 10)
: 1.96 N·m (0.2 kg-m, 17 in-lb)
Step 2 (bolts 1 - 6)
: 1.96 N·m (0.2 kg-m, 17 in-lb)
Step 3 (bolts 1 - 10)
: 5.88 N·m (0.6 kg-m, 52 in-lb)
Step 4 (bolts 1 - 10)
: 10.4 N·m (1.1 kg-m, 92 in-lb)
PBIC2050E
Standard : –0.14 to 0.14 mm (–0.0055 to 0.0055 in)
EMQ0044D
2011 Pathfinder
EM-86
< REMOVAL AND INSTALLATION >
[VQ40DE]
CAMSHAFT
4. Crank the engine, and then make sure that engine oil comes out
from camshaft bracket (No. 1) oil hole. End cranking after check-
ing.
WARNING:
• Be careful not to touch rotating parts (drive belts, idler
pulley, and crankshaft pulley, etc.).
CAUTION:
• Engine oil may squirt from intake valve timing control
solenoid valve installation hole during cranking. Use a
shop cloth to prevent the engine components and the
vehicle.
• Do not allow engine oil to get on rubber components such
as drive belt or engine mount insulators. Immediately wipe off any splashed engine oil.
• Clean oil groove between oil strainer and intake valve timing control solenoid valve if engine oil does not
come out from camshaft bracket (No. 1) oil hole. Refer to
5. Remove components between intake valve timing control solenoid valve and camshaft sprocket (INT),
and then check each oil groove for clogging.
• Clean oil groove if necessary. Refer to
.
6. After inspection, installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
• Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to
MA-18, "FOR USA AND CANADA : Fluids and Lubricants"
(United
States and Canada) or
MA-20, "FOR MEXICO : Fluids and Lubricants"
(Mexcio).
• Use procedure below to check for fuel leakage.
• Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
• Start engine. With engine speed increased, check again for fuel leakage at connection points.
• Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal and installation, slack in the guide
may generate a pounding noise during and just after engine start. However, this is normal. Noise will stop
after hydraulic pressure rises.
• Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gas, or any oils/fluids including
engine oil and engine coolant.
• Bleed air from passages in lines and hoses, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to spec-
ified level, if necessary.
• Summary of the inspection items:
*Power steering fluid, brake fluid, etc.
PBIC2869E
Item
Before starting engine
Engine running
After engine stopped
Engine coolant
Level
Leakage
Level
Engine oil
Level
Leakage
Level
Transmission/
transaxle fluid
A/T and CVT Models
Leakage
Level/Leakage
Leakage
M/T Models
Level/Leakage
Leakage
Level/Leakage
Other oils and fluids*
Level
Leakage
Level
Fuel
Leakage
Leakage
Leakage
Exhaust gas
—
Leakage
—
2011 Pathfinder
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст