Nissan Primera P12. Instruction — part 35
REFRIGERANT LINES
ATC-133
C
D
E
F
G
H
I
K
L
M
A
B
ATC
*1
ATC-21, "LUBRICANT RETURN
OPERATION"
*2
ATC-146, "Checking for Refrigerant
Leaks"
*3
ATC-146, "Checking for Refrigerant
Leaks"
*4
ATC-89, "PERFORMANCE TEST
DIAGNOSES"
SHA383F
ATC-134
REFRIGERANT LINES
Components
EJS003A9
YD22DDTI ENGINE MODELS
Refer to
ATC-5, "Precautions for Refrigerant Connection"
.
RJIA2341E
REFRIGERANT LINES
ATC-135
C
D
E
F
G
H
I
K
L
M
A
B
ATC
F9Q ENGINE MODELS
RJIA2371E
ATC-136
REFRIGERANT LINES
Compressor
EJS003AA
REMOVAL
With YD Engine
With F9Q Engine
1.
Use refrigerant collecting equipment (for HFC-134a) to discharge refrigerant.
2.
Disconnect the compressor connector.
3.
Remove the engine under cover (right side).
4.
Remove the compressor-alternator belt.
Refer to
(YD engine),
(F9Q engine).
5.
Remove the mounting nuts (bolts) from the high-pressure flexi-
ble hose and low-pressure flexible hose.
CAUTION:
Cap or wrap the joint of the pipe with suitable material such
as vinyl tape to avoid the entry of air.
RJIA0834E
RJIA2372E
RJIA0779E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст