Nissan Altima L32. Instruction — part 656
EM-160
< ON-VEHICLE REPAIR >
[VQ35DE]
FRONT TIMING CHAIN CASE
2. Install the new front oil seal on the front timing chain case. Apply
new engine oil to the oil seal edges.
NOTE:
Install it so that each seal lip is oriented as shown.
a. Install the new front oil seal so that it becomes flush with the
face with front timing chain case using suitable drift.
CAUTION:
Press fit straight and avoid causing burrs or tilting the oil
seal.
NOTE:
Make sure the garter spring is in position and seal lip is not
inverted.
3. Apply Silicone RTV Sealant to front timing chain case as shown.
• Use Genuine Silicone RTV Sealant, or equivalent. Refer to
15, "Recommended Chemical Products and Sealants"
.
• Before installation, wipe off the protruding sealant.
• C: 2.6 - 3.6 mm (0.102 - 0.142 in) dia.
4. Install dowel pin on the rear timing chain case into dowel pin hole in front timing chain case.
SEM715A
PBIC0790E
ALBIA0252ZZ
FRONT TIMING CHAIN CASE
EM-161
< ON-VEHICLE REPAIR >
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
5. Loosely install the front timing chain case bolts.
6. Tighten the front timing chain case bolts in the order as shown.
• Retighten the front timing chain case bolts in the order as
shown.
7. Remove lower oil pan.
8. Install upper oil pan bolts. Refer to
EM-139, "Removal and Installation"
.
9. Install lower oil pan. Refer to
EM-139, "Removal and Installation"
.
10. Install IVT control valve covers.
11. Apply liquid gasket and install the water pump cover.
• Use Genuine Silicone RTV Sealant or equivalent. Refer to
GI-15, "Recommended Chemical Products
12. Install crankshaft pulley and tighten the bolt in two steps.
• Lubricate thread and seat surface of the bolt with new engine
oil.
• Apply a paint mark for the second step of angle tightening.
13. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
14. Installation of the remaining components is in reverse order of removal.
Bolt position Bolt diameter
1, 2
: 8 mm (0.31 in)
3 – 22
: 6 mm (0.24 in)
Bolt position Tightening specification
1, 2
: 28.5 N·m (2.9 kg-m, 21 ft-lb)
3 – 22
: 12.8 N·m (1.3 kg-m, 9 ft-lb)
AWBIA0708ZZ
Step 1
: 44 N·m (4.5 kg-m, 32 ft-lb)
Step 2
: 84
° - 90° degrees clockwise
Tool Number
: KV10112100 (BT-8653-A)
SEM531G
EM-162
< ON-VEHICLE REPAIR >
[VQ35DE]
TIMING CHAIN
TIMING CHAIN
Component
INFOID:0000000004202167
• Refer to
EM-111, "Precaution for Liquid Gasket"
• Before installation, wipe off any protruding sealant.
CAUTION:
• After removing timing chain, do not turn the crankshaft and camshaft separately, or the valves will
strike the pistons.
• When installing camshafts, chain tensioners, oil seals, or other sliding parts, lubricate contacting
surfaces with new engine oil.
• Apply new engine oil to bolt threads and seat surfaces when installing camshaft sprockets, camshaft
brackets, and crankshaft pulley.
• Before disconnecting fuel hose, release fuel pressure. Refer to
.
• Before removing the upper oil pan, remove the crankshaft position sensor (POS).
• Be careful not to damage sensor edges.
• Do not spill engine oil or coolant on drive belts.
1.
Timing chain tensioner
2.
Internal chain guide
3.
Timing chain tensioner
4.
Camshaft sprocket (EXH)
5.
Timing chain (secondary)
6.
Timing chain (primary)
7.
Camshaft sprocket (INT)
8.
Camshaft sprocket (INT)
9.
Timing chain (secondary)
10. Camshaft sprocket (EXH)
11. Slack guide
12. Crankshaft sprocket
13. Rear timing chain case
14. Tension guide
15. O-ring
AWBIA0578GB
TIMING CHAIN
EM-163
< ON-VEHICLE REPAIR >
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
Removal
INFOID:0000000004202168
1. Remove front timing chain cover. Refer to
EM-155, "Removal and Installation"
2. Disconnect the power brake booster vacuum hose.
3. Disconnect the electric throttle control actuator.
4. Disconnect the coolant hoses at the electric throttle control actuator.
5. Disconnect the PCV hose.
6. Disconnect the EVAP canister purge volume control solenoid vacuum hose.
7. Remove the intake manifold collector. Refer to
EM-130, "Removal and Installation"
8. Remove the six ignition coils.
9. Remove the six spark plugs. Refer to
EM-119, "Removal and Installation"
10. Remove the engine oil dipstick.
11. Remove the rocker covers. Loosen the bolts in the numerical order as shown.
: Front
ALBIA0244ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст