Nissan Altima L32. Instruction — part 179
CCS-4
< FUNCTION DIAGNOSIS >
[VQ35DE]
AUTOMATIC SPEED CONTROL DEVICE (ASCD)
FUNCTION DIAGNOSIS
AUTOMATIC SPEED CONTROL DEVICE (ASCD)
Description
INFOID:0000000004206764
For information regarding the ASCD system, refer to
CHG
CHG-1
ELECTRICAL & POWER CONTROL
C
D
E
F
G
H
I
J
K
L
B
SECTION
CHG
A
O
P
N
CONTENTS
CHARGING SYSTEM
BASIC INSPECTION . . . . . . . . .
DIAGNOSIS AND REPAIR WORKFLOW . . ..
Work Flow . . . . . . . . . . . . . . . .....
FUNCTION DIAGNOSIS . . . . . . . ...
CHARGING SYSTEM . . . . . . . . . . ..
System Diagram . . . . . . . . . . . . . ....
System Description . . . . . . . . . . . . ...
Component Description . . . . . . . . . . ....
POWER GENERATION VOLTAGE VARI-
ABLE CONTROL SYSTEM . . . . . . . . .
System Diagram . . . . . . . . . . . . . ....
System Description . . . . . . . . . . . . ...
Component Description . . . . . . . . . . .....
COMPONENT DIAGNOSIS . . . . . . ..
CHARGING SYSTEM PRELIMINARY IN-
SPECTION . . . . . . . . . . . . . . ...
Inspection Procedure . . . . . . . . . . . ....
Inspection Procedure . . . . . . . . . . . ....
B TERMINAL CIRCUIT . . . . . . . . . ..
Description . . . . . . . . . . . . . . . ..
Diagnosis Procedure . . . . . . . . . . . ...
L TERMINAL CIRCUIT . . . . . . . . . ...
Description . . . . . . . . . . . . . . . ..
Diagnosis Procedure . . . . . . . . . . . ...
S TERMINAL CIRCUIT . . . . . . . . . ..
Description . . . . . . . . . . . . . . . ..
Diagnosis Procedure . . . . . . . . . . . ...
CHARGING SYSTEM . . . . . . . . . ...
Wiring Diagram - Coupe . . . . . . . . . . ..
Wiring Diagram - Sedan . . . . . . . . . . ..
SYMPTOM DIAGNOSIS . . . . . . . ..
CHARGING SYSTEM . . . . . . . . . ...
Symptom Table . . . . . . . . . . . . . ...
PRECAUTION . . . . . . . . . . . ..
PRECAUTIONS . . . . . . . . . . . . .
Supplemental Restraint System (SRS) "AIR BAG"
and "SEAT BELT PRE-TENSIONER" . . . . . .
Necessary for Steering Wheel Rotation After Bat-
tery Disconnect . . . . . . . . . . . . . .
Precaution for Power Generation Voltage Variable
Control System . . . . . . . . . . . . . .
PREPARATION . . . . . . . . . . ...
PREPARATION . . . . . . . . . . . . .
Special Service Tool . . . . . . . . . . . .
Commercial Service Tool . . . . . . . . . .
ON-VEHICLE REPAIR . . . . . . . . .
GENERATOR . . . . . . . . . . . . .
Removal and Installation . . . . . . . . . . .
Inspection . . . . . . . . . . . . . . . .
SERVICE DATA AND SPECIFICATIONS
(SDS) . . . . . . . . . . . . . . .
SERVICE DATA AND SPECIFICATIONS
(SDS) . . . . . . . . . . . . . . . . .
CHG-2
< BASIC INSPECTION >
DIAGNOSIS AND REPAIR WORKFLOW
BASIC INSPECTION
DIAGNOSIS AND REPAIR WORKFLOW
Work Flow
INFOID:0000000004205646
OVERALL SEQUENCE
DETAILED FLOW
ALMIA0055GB
CHG
DIAGNOSIS AND REPAIR WORKFLOW
CHG-3
< BASIC INSPECTION >
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
NOTE:
To ensure a complete and thorough diagnosis, the battery, starter and generator test segments must be done
as a set from start to finish.
1.
PRELIMINARY INSPECTION
Perform the preliminary inspection. Refer to
.
>> GO TO 2
2.
DISABLE THE POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM
Disable the power generation voltage variable control with either of the following procedures.
• After selecting “ENGINE” on the “SELECT SYSTEM” screen of CONSULT-III, set the “ALTERNATOR DUTY”
value to 0 % by selecting “ALTERNATOR DUTY” with “Active Test”. Continue “Active Test” until the end of
inspection. (When the DUTY value is 0 or 100 %, the normal power generation is performed according to the
characteristic of the IC regulator of the generator.)
• Turn the ignition switch OFF, disconnect the battery current sensor connector and leave it disconnected dur-
ing the course of the test.
NOTE:
Running the engine with the battery current sensor disconnected will cause DTC's (P1550-P1554) to set.
After finishing the inspection, connect the battery current sensor connector and erase the self-diagnostic
results history of the engine using CONSULT-III.
>> GO TO 3
3.
DIAGNOSIS WITH STARTING/CHARGING SYSTEM TESTER
Perform the charging system test using Starting/Charging System Tester (J-44373). For details and operating
instructions, refer to Technical Service Bulletin.
Test result
CHARGING SYSTEM NOMAL>>Charging system is normal and will also show “DIODE RIPPLE” test result.
NO CHARGING VOLTAGE>>GO TO 4
LOW CHARGING VOLTAGE>>GO TO 12
HIGH CHARGING VOLTAGE>>GO TO 14
DIODE RIPPLE NORMAL>>Diode ripple is OK and will also show “CHARGING VOLTAGE” test result.
EXCESS RIPPLE DETECTED>>Replace the generator. Perform “DIODE RIPPLE” test again using Starting/
Charging System Tester (J-44373) to confirm repair.
DIODE RIPPLE NOT DETECTED>>GO TO 4
4.
INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)
Turn the ignition switch ON.
Does the charge warning lamp illuminate?
YES
>> GO TO 6
NO
>> GO TO 5
5.
TERMINAL“2” (OPEN) CIRCUIT INSPECTION
Check terminal “2” circuit for open circuits. Refer to
Is the terminal “2” circuit normal?
YES
>> Replace generator. Refer to
CHG-27, "Removal and Installation"
NO
>> Repair as needed.
6.
INSPECTION WITH CHARGE WARNING LAMP (IDLING)
Start the engine and run it at idle.
Does the charge warning lamp turn OFF?
YES
>> GO TO 9
NO
>> GO TO 7
7.
TERMINAL “2”(SHORT) CIRCUIT INSPECTION
Check terminal “2” circuit for short to ground. Refer to
.
Is the terminal “2” circuit normal?
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст