Nissan Terrano model r20 series 2004. Instruction — part 318
Removal and Installation
YST062
POWER STEERING OIL PUMP
ST-16
Removal and Installation
YST063
STEERING LINKAGE
ST-17
Remove gear arm with Tool.
Remove tie-rod from knuckle arm with Tool.
YST064
YST024
NFA010
STEERING LINKAGE
Removal and Installation (Cont’d)
ST-18
Disassembly and Assembly
IDLER ARM ASSEMBLY
I
Apply coat of multi-purpose grease to bushing.
I
Press bushing into idler body, and insert shaft of idler bracket
carefully until bushing protrudes.
Tighten nut to the specified torque.
: 54 - 69 N
⋅
m (5.5 - 7.0 kg-m, 40 - 50 ft-lb)
CROSS ROD AND TIE-ROD
1. When tie-rod ball joints and tie-rod bar are separated, adjust
tie-rod length correctly.
Adjustment should be done between ball stud centers.
L: Standard
287 mm (11.30 in)
2. Lock tie-rod clamp nuts so that ball joint on outer ball stud is
as follows with respect to that on inner ball stud.
CAUTION:
Make sure that tie-rod bars are screwed into tie-rod tube more
than 35 mm (1.38 in). Refer to illustration.
NST012
YST019
STEERING LINKAGE
ST-19
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст