Nissan Frontier D22. Instruction — part 234
BASIC SERVICE PROCEDURE
EC-39
[KA24DE]
C
D
E
F
G
H
I
J
K
L
M
A
EC
2.
CHECK IGNITION TIMING
With CONSULT-II
1.
Run engine at about 2,000 rpm for about 2 minutes under no-load.
2.
Rev engine two or three times under no-load, then run engine at
idle speed for about 1 minute.
3.
Select “IGNITION TIMING ADJ” in WORK SUPPORT mode.
4.
Touch “START”.
5.
Rev engine (2,000 to 3,000 rpm) two or three times under no-
load, then run engine at idle speed.
6.
Check ignition timing with a timing light.
OK or NG
OK
>> GO TO 5.
NG
>> GO TO 4.
SEF978U
PEF546N
M/T
: 20
°±2° BTDC
A/T
: 20
°±2° BTDC (in P or N position)
SEF320V
EC-40
[KA24DE]
BASIC SERVICE PROCEDURE
3.
CHECK IGNITION TIMING
Without CONSULT-II
1.
Run engine at about 2,000 rpm for about 2 minutes under no-load.
2.
Rev engine two or three times under no-load, then run engine at
idle speed for about 1 minute.
3.
Stop engine and disconnect throttle position sensor harness
connector.
4.
Start engine and rev it (2,000 to 3,000 rpm) two or three times
under no-load, then run engine at idle speed.
5.
Check ignition timing with a timing light.
OK or NG
OK
>> GO TO 5.
NG
>> GO TO 4.
SEF978U
SEF265S
M/T
: 20
°±2° BTDC
A/T
: 20
°±2° BTDC (in P or N position)
SEF320V
BASIC SERVICE PROCEDURE
EC-41
[KA24DE]
C
D
E
F
G
H
I
J
K
L
M
A
EC
4.
ADJUST IGNITION TIMING
With CONSULT-II
1.
Adjust ignition timing to the specified value by turning distributor after loosening bolts which secure distrib-
utor.
Without CONSULT-II
1.
Adjust ignition timing to the specified value by turning distributor after loosening bolts which secure distrib-
utor.
2.
Stop engine and connect throttle position sensor harness con-
nector to throttle position sensor.
With CONSULT-II >> GO TO 2.
Without CONSULT-II >> GO TO 3.
5.
CHECK BASE IDLE SPEED
With CONSULT-II
1.
Read idle speed in “IGNITION TIMING ADJ” in “WORK SUP-
PORT” mode.
Without CONSULT-II
1.
Check idle speed.
OK or NG
OK (With CONSULT-II) >> GO TO 7.
OK (Without CONSULT-II) >> GO TO 8.
NG
>> GO TO 6.
6.
ADJUST BASE IDLE SPEED
1.
Rev engine (2,000 to 3,000 rpm) two or three times under no-load, then run engine at idle speed.
2.
Adjust idle speed by turning idle speed adjusting screw.
With CONSULT-II >> GO TO 7.
Without CONSULT-II >> GO TO 8.
SEF265S
M/T
: 750
±50 rpm
A/T
: 750
±50 rpm (in P or N position)
M/T
: 750
±50 rpm
A/T
: 750
±50 rpm (in P or N position)
SEF713Z
M/T
: 750
±50 rpm
A/T
: 750
±50 rpm (in P or N position)
SEF240SA
EC-42
[KA24DE]
BASIC SERVICE PROCEDURE
7.
CHECK TARGET IDLE SPEED
With CONSULT-II
1.
Touch “BACK” on CONSULT-II.
2.
Rev engine (2,000 to 3,000 rpm) two or three times under no-
load, then run engine at idle speed.
3.
Read idle speed in “DATA MONITOR” mode with CONSULT-II.
OK or NG
OK
>> GO TO 10.
NG
>> GO TO 9.
8.
CHECK TARGET IDLE SPEED
Without CONSULT-II
1.
Stop engine and connect throttle position sensor harness con-
nector.
2.
Start engine.
3.
Rev engine (2,000 to 3,000 rpm) two or three times under no-
load, then run engine at idle speed.
4.
Check target idle speed.
OK or NG
OK
>> GO TO 10.
NG
>> GO TO 9.
9.
DETECT MALFUNCTIONING PART
Check the following.
1.
Check IACV-AAC valve and replace if necessary. Refer to
.
2.
Check IACV-AAC valve harness and repair if necessary. Refer to
.
3.
Check ECM function by substituting another known-good ECM.
(ECM may be the cause of an incident, but this is rare a case.)
>> GO TO 10.
SEF602K
M/T
: 800
±50 rpm
A/T
: 800
±50 rpm (in P or N position)
SEF058Y
M/T
: 800
±50 rpm
A/T
: 800
±50 rpm (in P or N position)
SEF265S
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст