Nissan Frontier. Instruction — part 1196
STR-32
< WIRING DIAGRAM >
STARTING SYSTEM
ABBIA1212GB
STARTING SYSTEM
STR-33
< WIRING DIAGRAM >
C
D
E
F
G
H
I
J
K
L
M
A
STR
N
P
O
ABBIA1560GB
STR-34
< SYMPTOM DIAGNOSIS >
STARTING SYSTEM
SYMPTOM DIAGNOSIS
STARTING SYSTEM
Symptom Table
INFOID:0000000009482303
Symptom
Reference
No normal cranking
Refer to
STR-6, "Work Flow (With GR8-1200 NI)"
or
"Work Flow (Without GR8-1200 NI)"
Starter motor does not rotate
STARTER MOTOR
STR-35
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
A
STR
N
P
O
REMOVAL AND INSTALLATION
STARTER MOTOR
Removal and Installation (QR25DE)
INFOID:0000000009482304
REMOVAL
1. Disconnect the negative battery terminal. Refer to
PG-83, "Removal and Installation"
2. Remove the air cleaner cover and the air cleaner to intake manifold collector duct. Refer to
3. Remove terminal "1" (S) and terminal "2" (B) nuts.
4. Remove the two starter motor bolts, using power tools.
5. Remove the starter motor.
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
Be sure to tighten terminal nuts carefully.
AWBIA0994ZZ
1.
Starter motor assembly
2.
Transmission housing
3.
Engine oil cooler
4.
Terminal "1" (S) nut
5.
Terminal "2" (B) nut
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст