Lexus ES300 (1997 year). Service manual — part 554
R08702
Calipers
R11290
Vinyl Tape
W03541
Press
SST
Oil Seal
SR–24
–
STEERING
POWER STEERING VANE PUMP
1320
1997 LEXUS ES300 (RM511U)
4.
INSPECT SPRING
Using a calipers, measure the free length of the spring.
Minimum free length: 32.3 mm (1.272 in.)
If it is not within the specification, replace the spring.
5.
IF NECESSARY, REPLACE OIL SEAL
(a)
Using a screwdriver with vinyl tape wound around its tip,
remove the oil seal.
NOTICE:
Be careful not to damage the front housing.
(b)
Coat a new oil seal lip with power steering fluid.
(c)
Using SST, press in the oil seal.
SST
09950–60010 (09951–00330),
09950–70010 (09951–07100)
NOTICE:
Make sure to install the oil seal facing the correct direction.
SR062–01
R13458
Inscribed Mark
R01149
Round End
R11292
–
STEERING
POWER STEERING VANE PUMP
SR–25
1321
1997 LEXUS ES300 (RM511U)
REASSEMBLY
NOTICE:
When using a vise, do not overtighten it.
1.
COAT WITH POWER STEERING FLUID
(See page
2.
INSTALL VANE PUMP SHAFT
3.
INSTALL STRAIGHT PINS
Using a plastic hammer, tap in 2 new pins.
NOTICE:
Be careful not to damage the pins.
4.
INSTALL CAM RING
Align the holes of the ring and 2 straight pins, and install the ring
with the inscribed mark facing outward.
5.
INSTALL VANE PUMP ROTOR
(a)
Install the rotor with the inscribed mark facing outward.
(b)
Install a new snap ring to the vane pump shaft.
6.
INSTALL VANE PLATES
Install the 10 plates with the round end facing outward.
7.
INSTALL GASKET
Install a new gasket.
8.
INSTALL SIDE PLATE
Align the holes of the plate and 2 straight pins.
9.
INSTALL WAVE WASHER
Install the washer so that its protrusions fit into the slots in the
side plate.
10.
INSTALL REAR HOUSING
(a)
Coat 2 new O–rings with power steering fluid and install
them to the housing.
(b)
Torque the 4 bolts.
Torque: 24 N·m (240 kgf·cm, 17 ft·lbf)
R11986
SST
SR–26
–
STEERING
POWER STEERING VANE PUMP
1322
1997 LEXUS ES300 (RM511U)
11.
INSTALL SPRING, FLOW CONTROL VALVE AND
PRESSURE PORT UNION
(a)
Install the valve facing the correct direction.
(See page
(b)
Coat a new O–ring with power steering fluid and install it
to the union.
(c)
Torque the union.
Torque: 83 N·m (850 kgf·cm, 62 ft·lbf)
12.
INSTALL SUCTION PORT UNION
(a)
Coat a new O–ring with power steering fluid and install it
to the union.
(b)
Torque the bolt.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
13.
INSTALL FRONT AND REAR BRACKETS
Torque the 3 bolts and 2 nuts.
Torque: 43 N·m (440 kgf·cm, 32 ft·lbf)
14.
INSTALL VANE PUMP PULLEY
Using SST to stop the pulley rotating, torque the nut.
SST
09960–10010 (09962–01000, 09963–01000)
Torque: 43 N·m (440 kgf·cm, 32 ft·lbf)
15.
MEASURE PS VANE PUMP ROTATING TORQUE
(See page
SR063–01
W03441
Pressure
Feed
Tube
Stopper
R11355
A
B
Z19285
SST
Clamp
Engine Wire
Fulcrum
Length
–
STEERING
POWER STEERING VANE PUMP
SR–27
1323
1997 LEXUS ES300 (RM511U)
INSTALLATION
1.
INSTALL PRESSURE FEED TUBE
(a)
Torque the union bolt with a new gasket.
HINT:
Make sure the stopper of the tube is touching the front bracket,
as shown, then torque the union bolt.
Torque: 52 N·m (525 kgf·cm, 38 ft·lbf)
(b)
Install the oil pressure switch to the union bolt.
Torque: 21 N·m (210 kgf·cm, 15 ft·lbf)
2.
INSTALL PS VANE PUMP ASSEMBLY WITH PRESS-
ER FEED TUBE
Temporarily tighten the 2 (A and B) bolts.
3.
INSTALL DRIVE BELT
(a)
Adjust drive belt tension.
(See page
(b)
Using SST, torque the A bolt.
SST
09249–63010
Torque: 29 N·m (293 kgf·cm, 21 ft·lbf)
HINT:
Use a torque wrench with a fulcrum length of 300 mm
(11.81 in.).
Disconnect the clamp with engine wire.
(c)
Torque the B bolt.
Torque: 43 N·m (440 kgf·cm, 32 ft·lbf)
(d)
Connect the connector to the oil pressure switch.
NOTICE:
Be careful for oil on the connector.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст