Lexus GS300/400 (2000 year). Service manual — part 114
CH049–01
P10639
Pulley
P10637
B02022
29 mm
Socket
Wrench
B01648
Wire
Clip
P10835
Turn
SST (B)
SST (A)
–
CHARGING (2JZ–GE)
GENERATOR
CH–13
1615
REASSEMBLY
1.
PLACE DRIVE END FRAME ON PULLEY
2.
INSTALL ROTOR TO DRIVE END FRAME
3.
INSTALL RECTIFIER END FRAME
(a)
Place the generator washer on the rotor.
(b)
Using a 29 mm socket wrench and press, slowly press in
the rectifier end frame.
(c)
Install the 3 nuts.
Torque: 4.5 N·m (46 kgf·cm, 40 in.·lbf)
(d)
Install the wire clip with the nut.
Torque: 5.4 N·m (55 kgf·cm, 48 in.·lbf)
4.
INSTALL PULLEY
(a)
Install the pulley to the rotor shaft by tightening the pulley
nut by hand.
(b)
Hold SST (A) with a torque wrench, and tighten SST (B)
clockwise to the specified torque.
SST
09820–63010
Torque: 39 N·m (400 kgf·cm, 29 ft·lbf)
(c)
Check that SST (A) is secured to the pulley shaft.
Z00045
Turn
SST (C)
P10836
Turn
SST (B)
SST (A)
B01649
Inside
Rubber
Insulator
B01650
Push
B01651
Seal Plate
CH–14
–
CHARGING (2JZ–GE)
GENERATOR
1616
(d)
Mount SST (C) in a vise.
(e)
Insert SST (B) into SST (C), and attach the pulley nut to
SST (C).
(f)
To torque the pulley nut, turn SST (A) in the direction
shown in the illustration.
Torque: 110.5 N·m (1,125 kgf·cm, 81 ft·lbf)
(g)
Remove the generator from SST (C).
(h)
Turn SST (B), and remove SST (A and B).
5.
INSTALL RECTIFIER HOLDER
(a)
Install the 4 rubber insulators on the lead wires.
(b)
Install the rectifier holder while pushing it with the 4
screws.
Torque: 2.9 N·m (30 kgf·cm, 26 in.·lbf)
6.
INSTALL VOLTAGE REGULATOR AND BRUSH
HOLDER
(a)
Place the seal plate on the rectifier end frame.
B01652
Upward
Long
Long
B01653
B01654
Plate Terminal
–
CHARGING (2JZ–GE)
GENERATOR
CH–15
1617
(b)
Place the voltage regulator and brush holder on the recti-
fier end frame.
NOTICE:
Be careful of the holder installation direction.
(c)
Install the 5 screws.
Torque: 2.0 N·m (20 kgf·cm, 18 in.·lbf)
(d)
Place the brush holder cover on the brush holder.
7.
INSTALL REAR END COVER
(a)
Install the end cover and plate terminal with the bolt and
3 nuts.
Torque:
Nut 4.4 N·m (45 kgf·cm, 39 in.·lbf)
Bolt 3.9 N·m (39 kgf·cm, 35 in.·lbf)
(b)
Install the terminal insulator with the nut.
Torque: 6.5 N·m (67 kgf·cm, 58 in.·lbf)
8.
CHECK THAT ROTOR ROTATES SMOOTHLY
CH04A–01
CH–16
–
CHARGING (2JZ–GE)
GENERATOR
1618
INSTALLATION
Installation is in the reverse order of removal. (See page
)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст