Chrysler Voyager. Manual — part 471

TEST

ACTION

APPLICABILITY

9

Turn the ignition off to the lock position.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Install a substitute Relay in place of the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Ignition on, engine not running.
With the DRBIII

t, actuate the Transmission Control Relay.

Using a 12-volt test light connected to ground, check the Transmission Control Relay
Output circuit in the Transmission Solenoid /Pressure Switch Assembly harness
connector.
Does the test light blink on and off?

All

Yes

→ Replace the Transmission Control Relay.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

Go To 10

10

Using the schematics as a guide, inspect the wiring and connectors. Repair as
necessary. Pay particular attention to all power and ground circuits.
If there are no possible causes remaining, view repair.

All

Repair

Replace the Transmission Control Module per the Service Infor-
mation. WITH THE DRBIII

t PERFORM QUICK LEARN AND

REPROGRAM PINION FACTOR.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

11

The conditions necessary to set this DTC are not present at this time.
Using the schematics as a guide, inspect the wiring and connectors specific to this
circuit.
Wiggle the wiring while checking for shorts and open circuits.
With the DRBIII

t, check the EATX EVENT DATA to help identify the conditions in

which the DTC was set.
Were there any problems found?

All

Yes

→ Repair as necessary.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Test Complete.

111

TRANSMISSION - EATX

P0888-RELAY OUTPUT ALWAYS OFF —

Continued

Symptom:

P0890-SWITCHED BATTERY

When Monitored and Set Condition:

P0890-SWITCHED BATTERY

When Monitored:

Ignition key is turned from the OFF position to RUN position and/or

ignition key is turned from the CRANK position to RUN position.

Set Condition:

This DTC is set if the Transmission Control Module senses voltage on any

of the Pressure Switch Inputs prior to the TCM energizing the Transmission Control Relay.

POSSIBLE CAUSES

2/4 PRESSURE SWITCH SENSE CIRCUIT SHORT TO VOLTAGE

L/R PRESSURE SWITCH SENSE CIRCUIT SHORT TO VOLTAGE

OD PRESSURE SWITCH SENSE CIRCUIT SHORT TO VOLTAGE

TRANSMISSION CONTROL MODULE

INTERMITTENT WIRING AND CONNECTORS

TEST

ACTION

APPLICABILITY

1

NOTE: Low fluid level can be the cause of many Transmission problems. If
the fluid level is low locate and repair the leak then check and adjust the
fluid level per the Service Information.
NOTE: Always perform diagnostics with a fully charged battery to avoid
false symptoms.
With the DRBIII

t, read the engine DTC’s. Check and repair all engine DTC’s prior

to performing Transmission Symptom Diagnostics.
With the DRBIII

t, read Transmission DTC’s. Record all DTC’s and 1 Trip Failures.

NOTE: Diagnose 1 Trip Failures as a fully matured DTC.
Using the wiring diagram/schematic as a guide, inspect the wiring and connectors.
Repair as necessary.
Perform the Shift Lever Position Test. If the test does not pass, refer to Symptom test
for P0706 Check Shifter Signal.
For Gear Ratio DTC’s, check and record all CVI’s.
Most DTC’s set on start up but some must be set by driving the vehicle such that all
diagnostic monitors have run.
NOTE: Verify flash level of Transmission Control Module. Some problems
are corrected by software upgrades to the Transmission Control Module.
NOTE: Check for applicable TSB’s related to the symptom.
Perform this procedure prior to Symptom diagnosis.

All

Continue

Go To

2

2

With the DRBIII

t, Check the STARTS SINCE SET counter for P0890.

Note: This counter only applies to the last DTC set.
Is the STARTS SINCE SET counter for P0890 set at 0?

All

Yes

Go To 3

No

Go To 7

112

TRANSMISSION - EATX

TEST

ACTION

APPLICABILITY

3

Turn the ignition off to the lock position.
Disconnect the TCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and the Transmission Control
Relay Output circuit in the Transmission Control Relay connector.
Ignition on, engine not running.
Measure the voltage of the 2/4 Pressure Switch Sense circuit.
Is the voltage above 0.5 volt?

All

Yes

→ Repair the 2/4 Pressure Switch Sense circuit for a short to voltage.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

Go To 4

4

Turn the ignition off to the lock position.
Disconnect the TCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and the Transmission Control
Relay Output circuit in the Transmission Control Relay connector.
Ignition on, engine not running.
Measure the voltage of the L/R Pressure Switch Sense circuit.
Is the voltage above 0.5 volt?

All

Yes

→ Repair the L/R Pressure Switch Sense circuit for a short to

voltage.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

Go To 5

5

Turn the ignition off to the lock position.
Disconnect the TCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and the Transmission Control
Relay Output circuit in the Transmission Control Relay connector.
Ignition on, engine not running.
Measure the voltage of the OD Pressure Switch Sense circuit.
Is the voltage above 0.5 volt?

All

Yes

→ Repair the OD Pressure Switch Sense circuit for a short to

voltage.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

Go To 6

6

Using the schematics as a guide, inspect the wiring and connectors. Repair as
necessary. Pay particular attention to all power and ground circuits.
If there are no possible causes remaining, view repair.

All

Repair

Replace the Transmission Control Module per the Service Infor-
mation. WITH THE DRBIII

t PERFORM QUICK LEARN AND

REPROGRAM PINION FACTOR.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

113

TRANSMISSION - EATX

P0890-SWITCHED BATTERY —

Continued

TEST

ACTION

APPLICABILITY

7

The conditions necessary to set this DTC are not present at this time.
Using the schematics as a guide, inspect the wiring and connectors specific to this
circuit.
Wiggle the wiring while checking for shorted and open circuits.
With the DRBIII

t, check the EATX EVENT DATA to help identify the conditions in

which the DTC was set.
Were there any problems found?

All

Yes

→ Repair as necessary.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Test Complete.

114

TRANSMISSION - EATX

P0890-SWITCHED BATTERY —

Continued

Была ли эта страница вам полезна?
Да!Нет
1 посетитель считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности