Toyota FJ Cruiser (GSJ 10, 15 series). Manual — part 156
1GR-FE ENGINE MECHANICAL – CAMSHAFT
EM–57
EM
7.
INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
(a) While turning the stopper plate of the No. 1 chain
tensioner clockwise, push in the plunger of the No. 1
chain tensioner as shown in the illustration.
(b) While turning the stopper plate of the tensioner
counterclockwise, insert a bar of
φ 3.5 mm (0.138
in.) into the holes in the stopper plate and No. 1
chain tensioner to fix the stopper plate.
(c) Install the No. 1 chain tensioner with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7.4 ft.*lbf)
(d) Remove the bar from the No. 1 chain tensioner.
(e) Install a new gasket and the timing chain cover plate
with the 4 bolts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
(f)
Turn the crankshaft pulley 2 complete revolutions
slowly until its groove and the "0" timing mark of the
timing chain cover are aligned.
(g) Check that the timing marks of the camshaft timing
gears are aligned with the timing marks of the
bearing cap as shown in the illustration.
8.
SET CYLINDER TO TDC/COMPRESSION (See page
9.
INSPECT VALVE CLEARANCE (See page
)
10. ADJUST VALVE CLEARANCE (See page
11. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
LH
(a) Remove any old packing (FIPG) material.
HINT:
Do not drop any oil on the contact surfaces of the
cylinder head, timing chain cover and cylinder head
cover.
Stopper Plate
Stopper Plate
Push
A076294E02
A076530E01
Bank 1:
Timing Marks
Timing Marks
Timing Marks
Bank 2:
G036290E06
EM–58
1GR-FE ENGINE MECHANICAL – CAMSHAFT
EM
(b) Apply a continuous bead of seal packing (diameter
2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and
timing chain cover as shown in the illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three
Bond 1207B or the equivalent
NOTICE:
Install the cylinder head cover within 3 minutes
of applying the seal packing. Tighten the
cylinder head cover bolts and nuts within 15
minutes of installing the cylinder head cover.
Otherwise, the seal packing must be removed
and reapplied.
(c) Install the seal washers onto the bolts.
(d) Install the cylinder head cover with the 10 bolts and
2 nuts. Tighten the bolts and nuts uniformly in
several steps.
Torque: Bolt A
10 N*m (102 kgf*cm, 7.4 ft.*lbf)
Bolt B
9.0 N*m (92 kgf*cm, 80 in.*lbf)
Nut
9.0 N*m (92 kgf*cm, 80 in.*lbf)
HINT:
Each bolt length is as follows.
12. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
(a) Remove any old packing (FIPG) material.
HINT:
Do not drop any oil on the contact surfaces of the
cylinder head, timing chain cover and cylinder head
cover.
(b) Apply a continuous bead of seal packing (diameter
2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and
timing chain cover as shown in the illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three
Bond 1207B or the equivalent
NOTICE:
Install the cylinder head cover within 3 minutes
of applying the seal packing. Tighten the
cylinder head cover bolts and nuts within 15
minutes of installing the cylinder head cover.
Otherwise, the seal packing must be removed
and reapplied.
(c) Install the seal washers onto the bolts.
Seal Packing
Seal Width: 2 to 3 mm
A076311E02
A
A
A
A
A
A
A
B
B
B
Nut
Nut
A076503E03
Bolt
Length
A
25 mm (0.98 in.)
B
60 mm (2.36 in.)
Seal Width: 2 to 3 mm
Seal Packing
A076310E02
1GR-FE ENGINE MECHANICAL – CAMSHAFT
EM–59
EM
(d) Install the cylinder head cover with the 10 bolts and
2 nuts. Tighten the bolts and nuts uniformly in
several steps.
Torque: Bolt A
10 N*m (102 kgf*cm, 7.4 ft.*lbf)
Bolt B
9.0 N*m (92 kgf*cm, 80 in.*lbf)
Nut
9.0 N*m (92 kgf*cm, 80 in.*lbf)
HINT:
Each bolt length is as follows.
13. INSTALL IGNITION COIL ASSEMBLY (See page
14. INSTALL INTAKE AIR SURGE TANK (See page
15. INSTALL NO. 2 SURGE TANK STAY (See page
16. INSTALL NO. 1 SURGE TANK STAY (See page
17. INSTALL OIL BAFFLE PLATE (See page
)
18. INSTALL THROTTLE BODY BRACKET (See page
19. INSTALL AIR CLEANER ASSEMBLY (See page
)
20. CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
21. ADD ENGINE COOLANT (See page
22. CHECK FOR ENGINE COOLANT LEAKAGE (See
page
)
23. CHECK FOR ENGINE OIL LEAKAGE
24. INSPECT IGNITION TIMING (See page
25. INSTALL V-BANK COVER (See page
)
A
A
A
A
A
A
A
B
B
B
Nut
Nut
A072943E03
Bolt
Length
A
25 mm (0.98 in.)
B
60 mm (2.36 in.)
EM–60
1GR-FE ENGINE MECHANICAL – CYLINDER HEAD
EM
ENGINE
1GR-FE ENGINE MECHANICAL
CYLINDER HEAD
COMPONENTS
12 (122, 9.0)
NO. 2 FUEL PIPE CLAMP
N*m (kgf*cm, ft*lbf) : Specified torque
NO. 1 COOL AIR
INLET
NO. 1 FUEL PIPE SUB-ASSEMBLY
NO. 2 FUEL PIPE SUB-ASSEMBLY
NO. 2 FUEL PIPE CLAMP
A126431E01
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст