Toyota FJ Cruiser (GSJ 10, 15 series). Manual — part 120

1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY

ES–429

ES

REMOVAL

1.

DISCONNECT CABLE FROM NEGATIVE BATTERY
TERMINAL

2.

DRAIN ENGINE COOLANT (See page

CO-3

)

3.

REMOVE V-BANK COVER
(a) Remove the 2 nuts, then remove the V-bank cover.

4.

REMOVE AIR CLEANER ASSEMBLY
(a) Disconnect the No. 2 ventilation hose.

(b) Disconnect the vacuum hose.
(c) Disconnect the mass air flow meter connector.
(d) Disengage the 2 wire harness clamps.

(e) Loosen the 2 hose clamps.
(f)

Remove the 2 bolts.

(g) Disconnect the air cleaner hose and remove the air

cleaner.

A126474

A075594E01

A075595E01

A075596E01

ES–430

1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY

ES

5.

REMOVE THROTTLE WITH MOTOR BODY
ASSEMBLY
(a) Disconnect the No. 5 water by-pass hose.
(b) Disconnect the No. 4 water by-pass hose.

(c) Disconnect the throttle motor connector.
(d) Remove the 4 bolts, then remove the throttle w/

motor body and gasket.

(e) Remove the No. 5 water by-pass hose.
(f)

Remove the No. 4 water by-passe hose.

INSPECTION

1.

INSPECT THROTTLE WITH MOTOR BODY
ASSEMBLY
(a) Check the resistance.

(1) Using an ohmmeter, measure the resistance

between the terminals.
Standard resistance

If the result is not as specified, replace the
throttle with motor body assembly.

A126395

A075599E01

A126394

M+

M-

A059778E15

Tester Connection

Specified Condition

1 (M-) - 2 (M+)

0.3 to 100

at 20°C (68°F)

1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY

ES–431

ES

INSTALLATION

1.

INSTALL THROTTLE WITH MOTOR BODY
ASSEMBLY
(a) Connect the No. 4 water by-pass hose to the throttle

body.

(b) Connect the No. 5 water by-passe hose to the

throttle body.

(c) Install a new gasket and the throttle with motor body

with the 4 bolts.
Torque: 11 N*m (112 kgf*cm, 9 ft.*lbf)

(d) Connect the throttle motor connector.

(e) Connect the No. 4 water by-pass hose.
(f)

Connect the No. 5 water by-pass hose.

2.

INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner onto the throttle body.
(b) Connect the air cleaner hose to the air cleaner.
(c) Install the air cleaner with the 2 bolts.

Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)

(d) Connect the mass air flow meter connector.
(e) Engage the 2 wire harness clamps.
(f)

Connect the vacuum hose.

A126394

A075599E01

A126395

A075596E01

A075595E01

ES–432

1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY

ES

(g) Connect the No. 2 ventilation hose.

3.

CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)

4.

ADD ENGINE COOLANT (See page

CO-3

)

5.

CHECK FOR ENGINE COOLANT LEAKAGE (See
page

CO-4

)

6.

INSTALL V-BANK COVER
(a) Install the V-bank cover with the 2 nuts.

Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)

A075594E01

A126475

Была ли эта страница вам полезна?
Да!Нет
8 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности