Dacia SuperNova (engine E7J). Service manual — part 6
VALUES AND SETTINGS
07
CHECKING VALUES OF THE REAR AXLE ANGLES
07 - 10
ADJUSTMENTS
Not adjustable
Not adjustable
REAR AXLE
POSITION
Release
Release
H4 - H5 = 20
VALUES
0
0
... 0
0
30’
1 +/- 0,5 mm
ANGLES
CAMBER ( nega
tive)
PARALLELISM
( toe in )
TIGHTENING POSITION
OF THE ELASTIC
BUSHINGS
For the values checking of the front axle angles, consequently the rear axle angles, the vehicle
must:
- to be placed with the wheels on the rotating plates ( of the bench ) being in horizontal plane;
- to ensure its braking;
- to check its suspension for vehicle setting at its free height;
- to compress its front axle at half loading ( by means of the compressing device DIR 500);
- to check its suspension for vehicle setting at its free position;
- steering brought at middle point and the steering box blocked in this position;
These operations are followed by the optical device attachment on the vehicle, observing the
instructions of the steering angles checking bench manufacturer.
ENGINE E7J-A-2/60
10
10 - 1
ENGINE AND LOWER ENGINE UNITS
INGREDIENTS
TYPE
RHODORSEAL 5661
Loctite FRENETANCH
Exhaust Pipe Paste
ORGANS
Lower casing, crankshaft bearing cap
Crankshaft pulley screws, flywheel
screws
Exhaust pipe sealing
IDENTIFICATION
Type /
Mark
Engine
Gearbox Cylinder
capacity
(cm
3
)
Cylinder
Bore
(mm)
Stroke
(mm)
Volumetric
Ratio
SupeRNova E7J -A-2/60 JH3 - 050
1390
75,8
77
9,5/1
Identification is done by means of a plate located on the cylinder casing.
It includes:
A: type of engine
B: engine approval letter
D: identity RENAULT
E: index of engine
G: engine mounting plant
F: engine manufacturing serial number
Loctite 518
Water-pump, thermostat stand, crank-
shaft closing end casing
Loctite AUTOFORM
Flywheel face for mounting on crank-
shaft
INGREDIENTS
000 0 0 / 00
0 000000
A B D E
G F
E7J-260-MB
EURO 2
EURO 3
Engine oil DACIA OIL EXTRA
10 W40; APISJ/CF
Engine oiled
Decapjoint
Cylinder head gasket surface cleaning
Depollution
Norm
ENGINE E7J-A-2/60
10
10 - 2
ENGINE AND LOWER ENGINE UNITS
MOTOR-PROPELLING GROUP
Dismounting and re-mounting the motor-propelling group is done at the upper part of the
engine compartment by means of a moving lifting device.
C
O UPLES
FO R
SCREW
-
FIXING
(daNm)
Screws for fixing right-side stand on engine
6,2
Hydro-elastic buffer attachment nut
3,7
Screw-nut for left-side elastic buffer
6,2
Wheel screws
7,5
Screws for fixing motor-propelling group-battery stand
2,1
Screw-nut for fixing small connecting rod on steering traverse 6,2
Screw for fixing anti-swing connecting rod on gearbox case
10,5
Control bars attachment screw on gearbox connecting rods
2,7
Car is placed on a lift-stand with two columns;
The following are taken down: battery, air-
filter case, engine bonnet, front wheels;
Oxygen probe connector is taken off;
Dismantle: thermic protection screen, cata-
lytic converter on the exhaust collector;
D
ISMO UNTING
The following are evacuated:
-the cooling
circuit at the
bottom part
of
the
radiator;
-the oil in the gearbox;
-the oil in the engine, if necessary.
The following are taken down:
-engine shield;
-the screws that fasten the catalytic
converter on the stand;
-the pipe-collar between the catalytic
converter and the trigger;
-the catalytic
converter;
-the anti-swing auxiliary connecting
rod.
ENGINE E7J-A-2/60
10
10 - 3
ENGINE AND LOWER ENGINE UNITS
MOTOR-PROPELLING GROUP
Disconnect the wiring connector from the
reverse driving contact.
The right-side planetary transmission is un-
coupled as follows:
-the brake-stirrup set is dismantled;
-disconnect the wire for the brake pads
wear indicator;
-the two screws for fixing the shock-
absorber of the steering-swivel stand are taken
off;
The steering-swivel stand is tipped up and
the planetary transmission is taken out from
the planetary pinion of the gearbox;
The left-side planetary transmission is un-
coupled as follows:
-the steering-swivel screw-nut is dis-
mantled;
-the screws for fixing the planetary
transmission on the gearbox are taken off;
-the brake-stirrup set is dismantled;
-the electric wire of the wear-and-abra-
sion light-indicator is taken off;
-the two screws for fixing the shock-
absorber of the steering-swivel stand are taken
off;
-the steering-swivel stand is tipped up
and the planetary transmission is taken out;
The fuse-box in the engine compartment
is dismantled.
The following are disconnected:
-connector 1 from the UCE injection
(pull flap 2, then disconnect);
-the front cabling of the engine;
-the connector of the shock-sensor;
-the ventilator connector;
-the mass wire on the gearbox.
The battery protection screen is dis-
mantled.
The following are taken off:
-the linking pipes coming from the ra-
diator, by using the pincers for elastic pipe-
collars MOT.1202-01B;
-the linking pipes coming from the de-
gassing vessel, by using the pincers for elas-
tic pipe-collars MOT.1202-01B;
-the pipes for air-conditioning coming
from the thermostat stand and the water-pipe;
1
2
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст