SsangYong Korando III (2010 year). Service manual — part 173

05-27

8010-01

Operations for power supply in STD

The operation input before the LCD backlight is illuminated, right after the ignition is turned OFF or ON,

is ignored.
The LCD backlight and other lamps are illuminated 0.4 ±0.1 second after the ignition ON is

detected.

The LCD display, LCD backlight, dial lamp and indicator lamp are turned on or off by the ignition

switch ON/OFF operation.

-

-

-

05-28

Brightness in SVC

(2) Illumination Level

Brightness in STD

Operating power

Illumination level

Main LCD

Dial pointer

Day

Night

Day

Night

B+

(B-CAN Wake UP)

-

OFF

OFF

OFF

OFF

IGN1

Level 1

100%

20%

100%

20%

Level 2

100%

30%

100%

30%

Level 3

100%

40%

100%

40%

Level 4

100%

50%

100%

50%

Level 5

100%

60%

100%

60%

Level 6

100%

70%

100%

70%

Operating power

Illumination

previous

DOT LCD

ODO, GAGE LCD

Dial

pointer

Day

Night

Day

Night

Day

Night

B+

(B-CAN

Wake

UP)

After

-

Level 6

Level 6

OFF (however, level 6 for initial
operation with B+ & IGN1 ON)

After

1st time

Maintains

previous

level

Maintains

previous

level

OFF (however, maintains previous level
for initial operation with B+ & IGN1 ON)

IGN1

Level 1

25%

5%

25%

5%

25%

5%

Level 2

40%

12%

40%

12%

40%

12%

Level 3

55%

19%

55%

19%

55%

19%

Level 4

70%

26%

70%

26%

70%

26%

Level 5

85%

33%

85%

33%

85%

33%

Level 6

100%

40%

100%

40%

100%

40%

05-29

8010-01

(1) SVC

Symbols in SVC

6) System Analysis

05-30

Symbols in SVC (via CAN)

Была ли эта страница вам полезна?
Да!Нет
4 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности