Jaguar XJ (X350). Service manual — part 472
Tighten to 20 Nm + 90 deg.
30
.
CAUTION: While applying the opposing force to sprocket and chain, tighten the
sprocket bolt.
CAUTION: Make sure that a new bolt is installed.
Using the special tool apply force to the tool in an anti-clockwise direction.
Tighten to 20 Nm + 90 deg.
31 . Remove the special tool from the right-hand cylinder head.
32 . Remove the special tool from the left-hand cylinder head.
33 . Install the left-hand variable camshaft timing oil control unit housing.
Install new O-ring seals.
Tighten to 22 Nm.
34 . Install the right-hand variable camshaft timing oil control unit housing.
Install new O-ring seals.
Tighten to 22 Nm.
www.
35 . Raise the vehicle.
36 . Remove the special tool.
37 . Install the CKP sensor.
Tighten to 10 Nm.
38 . Connect the CKP sensor electrical connector.
39 . Lower the vehicle.
40 . Install the spark plugs.
41
.
Install the engine front cover.
For additional information, refer to Engine Front Cover - VIN Range: G45704->G99999
(12.65.01)
www.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст