Daewoo Musso. Manual — part 272
5A-120 AUTOMATIC TRANSMISSION
9. Install the 3-4 shift valve and retaining pin. Refer to figure
8.51.
Figure 8.51 - 3-4 Shift Valve
10. Install the 2-3 shift valve and retaining pin. Refer to figure
8.52.
Figure 8.52 - Solenoid 2 and 2-3 Shift Valve
11. Install the 4-3 sequence valve, spring, plug and retaining
plate. Refer to figure 8.53.
Figure 8.53 - 4-3 Sequence Valve
AUTOMATIC TRANSMISSION 5A-121
12. Install the band apply regulator (BAR) valve (refer to figure
8.54), springs, plunger and retainer pin.
Figure 8.54 - Band Apply Regulator Valve and Solenoid 4
13. Install the clutch apply regulator (CAR) valve (refer to figure
8.55), springs, plunger and retainer pin.
Figure 8.55 - Clutch Apply Regulator Valve and solenoid 3
14. Install the solenoid supply valve, spring and retainer plate.
Refer to figure 8.56.
Notice
This aluminum valve is easily damaged.
Figure 8.56 - Solenoid Supply Valve and Solenoid 6
5A-122 AUTOMATIC TRANSMISSION
15. Install solenoid 6 plunger, spring and retaining pin.
16. Position the third feed ball (large nylon) in the valve body
and install the solenoid 5 filter and the solenoid 6 filter.
Refer to figures 8.5 and 8.56.
17. Check the separator plate for burrs and damage. Repair
or replace the separator plate as necessary.
18. Check the upper and lower valve body gaskets for
damage. Replace the gaskets as necessary.
19. Install the lower valve body gasket on the lower valve body.
20. Install the reverse lockout valve, spring, plug and retainer
plate. Ensure that the valve is correctly oriented. Refer to
figure 8.57.
Figure 8.57 - Reverse Lockout Valve
21. Position the five nylon ball checks in the upper valve body.
Refer to figure 8.48.
22. Fit the upper valve body gasket. Install the separator plate
over the upper valve body.
AUTOMATIC TRANSMISSION 5A-123
23. Holding the separator plate to the upper valve body to
prevent the check balls from falling out, install the upper
valve body on the lower valve body. Install all screws finger
tight then tighten the screws to specification in the
prescribed sequence. Refer to figure 8.58.
24. Install solenoids 1,2,3,4 and 6. Ensure the solenoid is firmly
secured by the retainer and that the screw is tightened to
specification.
25. Install solenoid 5. Ensure that the solenoid is pushed firmly
into the valve body by the retainer.
Notice
The wiring loom ground wire eyelet terminal is secured
beneath the solenoid retainer.
26. Install the line pressure relief valve, tapered end first, (refer
to figure 8.59), and the spring and disc. Secure with the
retaining pin.
Figure 8.58 - Tightening Sequence Upper to Lower Valve Body
Figure 8.59 - Line Pressure Relief Valve
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст