Chrysler PT Cruiser. Manual — part 721
(4) Remove screw retaining balance shaft drive
sprocket (Fig. 181).
(5) Move balance shaft inboard through drive
chain sprocket. Sprocket will hang in lower chain
loop.
(6) Remove carrier to crankcase attaching bolts to
remove carrier.
Fig. 180 Chain Cover, Guide and Tensioner
1 - STUD
2 - TENSIONER (ADJUSTER)
3 - GEAR COVER
4 - ADJUSTER SCREW
5 - SHOULDERED PIVOT SCREW
6 - CHAIN COVER (CUTAWAY)
7 - GUIDE
Fig. 181 Drive Chain and Sprockets
1 - NICKEL PLATED LINK AND MARK
2 - GEAR/SPROCKET SCREWS
3 - NICKEL PLATED LINK AND DOT
Fig. 182 Gear Cover and Gears
1 - STUD (DOUBLE ENDED)
2 - DRIVE GEAR
3 - DRIVEN GEAR
4 - CARRIER DOWEL
5 - GEAR(S)
6 - GEAR COVER
Fig. 183 Balance Shaft - Removal/Installation
1 - REAR COVER
2 - CARRIER
3 - BALANCE SHAFT
9 - 164
ENGINE 2.4L DOHC
PT
BALANCE SHAFTS AND CARRIER ASSEMBLY (Continued)
INSTALLATION
BALANCE SHAFT INSTALLATION/TIMING
Balance shaft and carrier assembly installation is
the reverse of the removal procedure. During instal-
lation crankshaft-to-balance shaft timing must
be established. Refer to Timing procedure in
this section.
(1) With balance shafts installed in carrier (Fig.
179) position carrier on crankcase and install four
attaching bolts and tighten to 54 N·m (40 ft. lbs.).
(2) Turn balance shafts until both shaft key ways
are up, parallel to vertical centerline of engine.
Install short hub drive gear on sprocket driven shaft
and long hub gear on gear driven shaft. After instal-
lation gear and balance shaft keyways must be up
with gear timing marks meshed as shown in (Fig.
184).
(3) Install gear cover and tighten double ended
stud/washer fastener to 12 N·m (105 in. lbs.).
(4) Align flat on balance shaft drive sprocket to the
flat on crankshaft (Fig. 185).
(5) Install balance shaft drive sprocket on crank-
shaft using Special Tool 6052 (Fig. 186).
(6) Turn crankshaft until number 1 cylinder is at
top dead center (TDC). The timing marks on the
chain sprocket should line up with the parting line
on the left side of number one main bearing cap.
(Fig. 187).
(7) Place chain over crankshaft sprocket so that
the plated link of the chain is over the number 1 cyl-
inder timing mark on the balance shaft crankshaft
sprocket (Fig. 187).
Fig. 184 Gear Timing
1 - KEY WAYS UP
2 - GEAR ALIGNMENT DOTS
Fig. 185 Balance Shaft Sprocket Alignment to
Crankshaft
1 - ALIGN FLATS
Fig. 186 Balance Shaft Drive
1 - SPROCKET
2 - SPECIAL TOOL 6052
PT
ENGINE 2.4L DOHC
9 - 165
BALANCE SHAFTS AND CARRIER ASSEMBLY (Continued)
(8) Place balance shaft sprocket into the timing
chain (Fig. 187) and align the timing mark on the
sprocket (dot) with the (lower) plated link on the
chain.
NOTE: The lower plated link is 8 links from the
upper link.
(9) With balance shaft keyways pointing up (12
o’clock) slide the balance shaft sprocket onto the nose
of the balance shaft. The balance shaft may have to
be pushed in slightly to allow for clearance.
NOTE: THE TIMING MARK ON THE SPROCKET, THE
(LOWER) NICKEL PLATED LINK, AND THE ARROW
ON THE SIDE OF THE GEAR COVER SHOULD LINE
UP WHEN THE BALANCE SHAFTS ARE TIMED
CORRECTLY.
(10) If the sprockets are timed correctly, install the
balance shaft bolts and tighten to 28 N·m (250 in.
lbs.). A wood block placed between crankcase and
crankshaft counterbalance will prevent crankshaft
and gear rotation.
(11) CHAIN TENSIONING:
(a) Install chain tensioner loosely assembled
with new adjuster screw and shouldered pivot
screw.
(b) Position guide on double ended stud making
sure tab on the guide fits into slot on the gear
cover. Install and tighten nut/washer assembly to
12 N·m (105 in. lbs.).
(c) Place a shim 1 mm (0.039 in.) thick x 70 mm
(2.75 in.) long between tensioner and chain. Push
tensioner and shim up against the chain. Apply
firm pressure 2.5–3 Kg (5.5–6.6 lbs.) directly
behind the adjustment slot to take up all
slack. Chain must have shoe radius contact as
shown in (Fig. 188).
(d) With the load applied, tighten top tensioner
adjuster bolt first, then bottom shouldered pivot
bolt. Tighten bolts to 12 N·m (105 in. lbs.). Remove
shim.
(e) Install carrier covers and tighten screws to
12 N·m (105 in. lbs.).
(12) If removed, install oil pump (Refer to 9 -
ENGINE/LUBRICATION/OIL PUMP - INSTALLA-
TION).
(13) Install pick-up tube and oil pan (Refer to 9 -
ENGINE/LUBRICATION/OIL
PAN
-
INSTALLA-
TION).
(14) Fill engine crankcase with proper oil to cor-
rect level.
Fig. 187 Balance Shaft Timing
1 - MARK ON SPROCKET
2 - KEYWAYS UP
3 - ALIGN MARKS
4 - PLATED LINK
5 - PARTING LINE (BEDPLATE TO BLOCK)
6 - PLATED LINK
Fig. 188 Chain Tension Adjustment
1 - 1MM (0.039 IN.) SHIM
2 - TENSIONER (ADJUSTER) BOLT
3 - SHOULDERED PIVOT BOLT
9 - 166
ENGINE 2.4L DOHC
PT
BALANCE SHAFTS AND CARRIER ASSEMBLY (Continued)
EXHAUST SYSTEM AND TURBOCHARGER
TABLE OF CONTENTS
page
page
EXHAUST SYSTEM AND TURBOCHARGER
DIAGNOSIS AND TESTING - EXHAUST
SYSTEM RESTRICTION CHECK . . . . . . . . . . . 3
. . . . . . . . . . . . . . . . . . . . . . . . . . . 3
COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . 5
COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . 5
. . . . . . . . . . . . . . . . . . . . . 5
MUFFLER
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
. . . . . . . . . . . . . . . . . . . . . . . . . . 6
INTERMEDIATE PIPE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
. . . . . . . . . . . . . . . . . . . . . . . . . . 7
CATALYTIC CONVERTER
. . . . . . . . . . . . . . . . . . . . . . . . . . 8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
. . . . . . . . . . . . . . . . . . . . . . . . . . 11
. . . . . . . . . . . . . . . . . . . . . . . . . 11
SUPPORT BRACKETS AND ISOLATORS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
. . . . . . . . . . . . . . . . . . . . . . . . . 12
HEAT SHIELDS
. . . . . . . . . . . . . . . . . . . . . . . . . 12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
. . . . . . . . . . . . . . . . . . . . . . . . . 13
TURBOCHARGER SYSTEM
TURBOCHARGER . . . . . . . . . . . . . . . . . . . . . 13
TURBOCHARGER
. . . . . . . . . . . . . . . . . . . . . . . . . 15
. . . . . . . . . . . . . . . . . . . . . . . . . . . 15
INSPECTION - TYPICAL TURBOCHARGER
CHARGE AIR COOLER AND HOSES
REMOVAL - CHARGE AIR COOLER HOSES
INSTALLATION - CHARGE AIR COOLER
HOSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
INSTALLATION - CHARGE AIR COOLER
LINES AND HOSES
INSTALLATION - LINES AND HOSES
SOLENOIDS AND VACUUM HARNESS
. . . . . . . . . . . . . . . . . . . . . . . . . 27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
. . . . . . . . . . . . . . . . . . . . . . . . . 28
EXHAUST SYSTEM AND
TURBOCHARGER
DESCRIPTION - EXHAUST SYSTEM
The exhaust system components consist of a cata-
lytic converter, intermediate pipe, muffler, clamps
and support isolators (Fig. 1).
PT
EXHAUST SYSTEM AND TURBOCHARGER
11 - 1
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст