Chrysler 300/300 Touring/300C, Dodge Magnum. Manual — part 1847
NOTE: Always use a NEW O-ring on the ends of
the steering hoses.
4. Lubricate NEW O-ring on end of pressure hose
with clean power steering fluid.
5. Install pressure hose (3) to steering gear (2).
Tighten tube nut to 47 N·m (35 ft. lbs.) torque.
6. Lubricate NEW O-ring on end of return hose with
clean power steering fluid.
7. Install return hose (1) to steering gear (2). Tighten
tube nut to 47 N·m (35 ft. lbs.) torque.
8. Align splines and install steering coupling to steering gear shaft. Install NEW pinch bolt. Tighten bolt to 54 N·m
(40 ft. lbs.) torque.
9. Install each outer tie rod (2) end to its knuckle (3).
Install nut (1) and tighten to 85 N·m (63 ft. lbs.)
torque.
19 - 206
GEAR
LX
10. Install tire and wheel assemblies (1). Tighten
wheel mounting nuts (3) to 150 N·m (110 ft. lbs.)
torque. (Refer to 22 - TIRES/WHEELS - INSTAL-
LATION)
11. Lower vehicle.
12. Connect battery negative cable (2) to battery post.
It is important that this is performed properly.
(Refer to 8 - ELECTRICAL/BATTERY SYSTEM -
STANDARD PROCEDURE)
13. Fill pump reservoir with fluid and perform pump
initial operation procedure. (Refer to 19 - STEER-
ING/PUMP - STANDARD PROCEDURE)
14. Perform wheel alignment setting toe to specifica-
tions. (Refer to 2 - SUSPENSION/WHEEL ALIGN-
MENT - STANDARD PROCEDURE)
15. Tighten tie rod jam nuts (1) to 75 N·m (55 ft. lbs.)
torque.
LX
GEAR
19 - 207
RWD
1. If necessary, install outer tie rods from original gear
to replacement inner tie rods. Install each outer tie
rod same amount of threads as it was installed on
original gear. This will get toe setting close, saving
some time when toe is set later in this procedure.
2. Lift steering gear (2) into mounted position and
install steering gear mounting bolts (1). Tighten
bolts to 95 N·m (70 ft. lbs.) torque.
NOTE: Always use a NEW O-ring on the ends of
the steering hoses.
3. Lubricate NEW O-ring on end of return hose with
clean power steering fluid.
4. Install return hose (3) to steering gear (1). Tighten
tube nut to 47 N·m (35 ft. lbs.) torque.
5. Lubricate NEW O-ring on end of pressure hose
with clean power steering fluid.
6. Install pressure hose (2) to steering gear (1).
Tighten tube nut to 47 N·m (35 ft. lbs.) torque.
19 - 208
GEAR
LX
CAUTION: Prior to coupling installation, make sure
gear is centered in its travel to match clockspring
centering in steering column.
7. Align coupling (2) with input shaft (3) and install
steering coupling. Install NEW pinch bolt. Tighten
bolt to 54 N·m (40 ft. lbs.) torque.
8. Install each outer tie rod end (5) to its knuckle (2).
Install nuts (1) and tighten to 85 N·m (63 ft. lbs.)
torque.
9. Install tire and wheel assemblies (1). Tighten wheel
mounting nuts (3) to 150 N·m (110 ft. lbs.) torque.
(Refer to 22 - TIRES/WHEELS - INSTALLATION)
10. Lower vehicle.
LX
GEAR
19 - 209
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст