Chrysler New Yorker. Manual — part 680
TEST CH-1A
CONTINUED - CHARGING SYSTEM NO CODE TEST
2.7L
FIG. 1
3.5L
FIG. 2
C
H
A
R
G
I
N
G
T
E
S
T
S
556
TEST CH-1A
CONTINUED - CHARGING SYSTEM NO CODE TEST
*Perform Verification TEST VER-3A.
**Check connectors - Clean / repair as necessary.
TEST CH-1A
CONNECT THE METER
CONTINUED FROM USE A VOLTMETER IN
BETWEEN THE GEN
THE PREVIOUS THE FOLLOWING
(12V) B(+) TERMINAL
PAGE.
STEP.
AND THE BATT (+)
SIDE. FIG. 1 OR 2
CAUTION: ENSURE
REPAIR THE B(+)
ALL WIRES ARE
IS THE VOLTAGE
YES
CIRCUIT FOR HIGH
CLEAR OF THE
START THE ENGINE.
ABOVE 0.4 VOLT?
RESISTANCE BETWEEN
ENGINE’S MOVING
THE GENERATOR AND
PARTS.
THE BATTERY.*
NO
IGNITION KEY OFF.
MEASURE BETWEEN THE
USE A VOLTMETER IN GENERATOR CASE
AND
THE FOLLOWING
BATTERY (-) SIDE.
STEP.
FIG. 1 OR 2
CAUTION: ENSURE
REPAIR THE GENERATOR
ALL WIRES ARE
IS THE VOLTAGE
YES
GROUND FOR HIGH
CLEAR OF THE
START THE ENGINE.
ABOVE 0.1 VOLT?
RESISTANCE,
ENGINE’S MOVING
GENERATOR CASE TO
PARTS.
BATTERY (-) SIDE.*
NO
IGNITION ON,ENGINE
OFF. WITH THE DRB,
USING A VOLTMETER,
READ THE BATTERY
MEASURE THE
VOLTAGE AND
BATTERY VOLTAGE.
RECORD.
RECORD SECOND
VOLTAGE READING. IS
VOLTAGE
YES
COMPARE THE TWO
DIFFERENCE LESS
TEST COMPLETE.*
VOLTAGE READINGS.
THAN ONE VOLT?
NO
CONTINUE TEST
CH-1A ON THE
NEXT PAGE.
C
H
A
R
G
I
N
G
T
E
S
T
S
557
TEST CH-1A
CONTINUED - CHARGING SYSTEM NO CODE TEST
FIG. 1
C
H
A
R
G
I
N
G
T
E
S
T
S
558
TEST CH-1A
CONTINUED - CHARGING SYSTEM NO CODE TEST
*Perform Verification TEST VER-3A.
**Check connectors - Clean / repair as necessary.
TEST CH-1A
KEY OFF, DISCONNECT
CONTINUED FROM THE POWERTRAIN
THE PREVIOUS CONTROL MODULE
PAGE.
HARNESS CONNECTOR.**
SEE GENERAL INFO 4.1
USING A VOLTMETER, IS
THE VOLTAGE
MEASURE THE FUSED
WITHIN ONE VOLT OF
YES
REPLACE THE
B(+) AT THE PCM.
THE DRB RECORDED
POWERTRAIN CONTROL
READING? MODULE.*
FIG. 1
NO
REPAIR THE B(+)
CIRCUIT FOR HIGH
RESISTANCE BETWEEN
THE PCM CAVITY 46
AND THE BATTERY.*
C
H
A
R
G
I
N
G
T
E
S
T
S
559
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст