SsangYong Musso. Manual — part 496
MANUAL TRANSMISSION 5B-31
6. Using a hydraulic press and installer, install the 3-4
synchronizer hub onto the main shaft.
Notice
Align the blocking ring with the synchronizer keys while
installing the hub.
5B-32 MANUAL TRANSMISSION
INPUT SHAFT
Disassembly Procedure
1. Remove the following parts from the input shaft :
!
Main shaft thrust race and bearing.
!
Main shaft pilot bearing rollers (15 rollers).
2. Using a hydraulic press and puller plate, remove the input
shaft bearing assembly from the shaft.
3. Remove the input bearing.
4. Remove the input shaft seal.
5. Check and clean all removed parts and replace if necessary.
MANUAL TRANSMISSION 5B-33
Assembly Procedure
1. Using a hydraulic press and installer, press the input shaft
bearing onto the input shaft.
2. Apply grease to the thrust bearing inner roller (15 rollers)
and install the main shaft thrust bearing and its race in the
rear of the input shaft.
3. Using a rubber hammer and installer, install the input bearing
retainer and input shaft seal after applying grease.
4. Install the bearing outer race to the retainer without end
play adjusting shim.
5B-34 MANUAL TRANSMISSION
COUNTER SHAFT
Disassembly Procedure
1. Using a hydraulic press and special tool, remove the front
bearing assembly from the counter shaft.
2. Check and clean all removed parts and replace if necessary.
Assembly Procedure
1. Using a hydraulic press and installer, press the front bearing
assembly onto the counter shaft.
2. Install is as follows :
!
Install a new O-ring on the counter shaft outer race and
lubricate it.
!
Using a installer, lightly tap the race into its bore until the
O-ring is compressed.
!
Install the race to be fully seated on the inside of the
case.