SsangYong Korando III (2010 year). Manual — part 473
05-24
When the ignition is switched off, the message "GOOD-BYE" is displayed for 2 seconds and disappears.
The other LCDs go off as soon as the ignition is switched off.
The dial and pointer dim down for 2 seconds and go off at the same time when the DOT LCD goes off.
7.
05-25
8010-01
Operations for power supply in STD
▶
The operation input before the LCD backlight is illuminated, right after the ignition is turned OFF or ON,
is ignored.
The LCD backlight and other lamps are illuminated 0.4 ±0.1 second after the ignition ON is
detected.
The LCD display, LCD backlight, dial lamp and indicator lamp are turned on or off by the ignition
switch ON/OFF operation.
-
-
-
05-26
Brightness in SVC
▶
(2) Illumination Level
Brightness in STD
▶
Operating power
Illumination level
Main LCD, dial point
Day
Night
B+
(B-CAN Wake UP)
- OFF
OFF
IGN 1
Level 1
100%
20%
Level 2
100%
30%
Level 3
100%
40%
Level 4
100%
50%
Level 5
100%
60%
Level 6
100%
70%
작동전원
Illumination
level
DOT LCD
ODO, gauge LCD, dial pointer
Day
Night
Day
Night
B+(B-CAN
Wake UP)
Initial
time
-
Level 6
Level 6
OFF (however, level 6 for initial
operation with B+ & IGN1 ON)
After
initial
time
Maintain
previous
level
Maintain
previous
level
OFF (however, maintains
previous level for initial operation
with B+ & IGN1 ON)
IGN 1
Level 1
25%
5%
25%
5%
Level 2
40%
12%
40%
12%
Level 3
55%
19%
55%
19%
Level 4
70%
26%
70%
26%
Level 5
85%
33%
85%
33%
Level 6
100%
40%
100%
40%
Operating power
IGN 1
05-27
8010-01
(1) SVC
Symbols in SVC
▶
5) System Analysis
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст