Isuzu engine 4j series. Manual — part 68
6C - 16 ENGINE FUEL
First nozzle opening pressure adjustment
1. Claim the nozzle holder in a vise.
2. Install the shim, first spring and spring seat in the
nozzle holder.
3. Install the collar, second spring, shim, spring seat and
pushrod in the nozzle holder.
4. Install the pins, lift piece and spacer in the nozzle
holder.
5. Install the pins in the spacer.
6. Install the nozzle on the spacer.
040MV015.tif
040MV016.tif
040MV017.tif
040MV018.tif
040MV019.tif
ENGINE FUEL 6C - 17
7. Hand-tighten the adjustment retaining nut together
with the gasket to the nozzle holder.
Retaining nut:
5-8677-7140-0
Gasket:
5-8677-7139-0
8. Tighten the adjustment retaining nut to the specified
torque.
Torque: 29 - 39 N∙m (3.0 - 4.0 kg∙m)
9. Set the nozzle holder to the nozzle tester.
10. Operate the nozzle tester and measure the first nozzle
opening pressure.
11. If the first nozzle opening pressure is not as specified,
disassemble the nozzle holder and replace the shim
until the pressure is as specified.
CAUTION:
Use a micrometer to measure shim thickness.
•
First nozzle opening pressure adjusting shims
Parts No.
Thickness (mm)
1-1534-9042-0
0.40
1-1534-9043-0
0.50
1-1534-9044-0
0.52
1-1534-9045-0
0.54
1-1534-9046-0
0.56
1-1534-9047-0
0.58
1-1534-9048-0
0.60
1-1534-9049-0
0.70
040MV010.tif
040MV014-1.tif
040MV030.tif
040LX010.tif
6C - 18 ENGINE FUEL
Full needle valve lift confirmation
1. Install the gasket and plug on the adjustment retaining
nut.
Gasket:
8-9722-7602-0
Plug:
5-8677-7141-0
2. Position the nozzle holder with the nozzle facing down
and install the dial gauge holder on the nozzle holder.
Dial gauge holder: 5-8677-7142-0
3. Install the nut on the dial gauge holder.
Nut: 5-8677-7143-0
4. Install the pin to the dial gauge.
Note:
The lengths of the pins do not include the
threaded portions.
Pin (liter=100 mm):
5-8677-7144-0
Dial gauge:
1-8531-7015-0
040MV013.tif
040MV012.tif
040MV011.tif
040MV029.tif
ENGINE FUEL 6C - 19
5. Secure the dial gauge to the nozzle holder using the
nut so that the pin contacts the tip of the first spring
seat.
CAUTION:
•
Secure the dial gauge so that a stroke of 2 mm can
be measured.
•
Do not over-tighten the nut as the dial gauge shaft
may jam. (Confirm from the dial gauge that the
shaft moves smoothly.)
6. Set the nozzle holder to the nozzle tester and put
needle to zero on the dial gauge.
7. Operate the nozzle tester to bleed any air from inside
the retaining nut and to confirm that no fuel leaks.
8. Operate the nozzle tester and increase the in-line
pressure to 34.3 - 44.1 MPa (350 - 450 kg/cm
2
) so that
the nozzle’s needle valve moves through its full lift.
Record full lift ‘L’. (Read dial gauge)
Note:
The above operation is used to determine whether
the nozzle seat is worn and whether the nozzle
assembly is in good condition.
040MV009.tif
040MV030.tif
040MV008.tif
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст