Isuzu N-Series. Manual — part 63
1B-22 AIR CONDITIONING
Condenser Assembly (Except 4HK1-TC Engine Model For Australia)
Removal
Preparation:
Disconnect the battery ground cable.
Discharge and recover refrigerant.
1. Pressure switch connector
2. Refrigerant line fixing clamp
3. Refrigerant Line
• Use a back up wrench when disconnecting and re-
connecting the refrigerant lines.
• When removing the line, the connecting part
should immediately be plugged or capped to pre-
vent foreign matter from being mixed into the line.
4. Condenser assembly
• Remove the radiator stay before condenser
(GCC).
Installation
1. Condenser Assembly
• If installing a new condenser, be sure to add 30cc
(0.8 Imp fl oz) of new specified compressor oil to a
new one.
• Tighten the condenser bolt to the specified torque.
2. Refrigerant Line
• Tighten the inlet line to the specified torque.
Legend
1. Refrigerant line
4. Condenser assembly
2. Pressure switch
5. Refrigerant line fixing clamp
3. Receiver / drier
"
!
#
N1A0199E
AIR CONDITIONING 1B-23
Tighten:
Inlet line to 15 N
⋅m (1.5 kg⋅m/11 lb⋅ft)
• Tighten the outlet line to the specified torque.
Tighten:
Outlet line to 6 N
⋅m (0.6 kg⋅m/4 lb⋅ft)
• O-rings cannot be reused. Always replace with
new ones.
• Be sure to apply new specified compressor oil to
the O-rings when connecting refrigerant line.
3. Refrigerant Line Fixing Clamp
4. Pressure Switch Connector
Condenser Assembly (4HK1-TC Engine Model For Australia)
Removal
Preparation:
Disconnect the battery ground cable.
Discharge and recover refrigerant.
1. Refrigerant Line
• Use a back up wrench when disconnecting and re-
connecting the refrigerant lines.
• When removing the line, the connecting part
should immediately be plugged or capped to pre-
vent foreign matter from being mixed into the line.
2. Condenser assembly
Legend
1. Refrigerant line
3. Receiver / drier
2. Pressure switch
4. Condenser assembly
2
3
4
1
N1A0198E
1B-24 AIR CONDITIONING
Installation
1. Condenser Assembly
• If installing a new condenser, be sure to add 30cc
(0.8 Imp fl oz) of new specified compressor oil to a
new one.
• Tighten the condenser bolt to the specified torque.
2. Refrigerant Line
• Tighten the inlet line to the specified torque.
Tighten:
Inlet line to 15 N
⋅m (1.5 kg⋅m/11 lb⋅ft)
• Tighten the outlet line to the specified torque.
Tighten:
Outlet line to 6 N
⋅m (0.6 kg⋅m/4 lb⋅ft)
• O-rings cannot be reused. Always replace with
new ones.
• Be sure to apply new specified compressor oil to
the O-rings when connecting refrigerant line.
Receiver / Drier (Except 4HK1-TC Engine Model For Australia)
Legend
1. Refrigerant line
3. Receiver / drier
2. Pressure switch
4. Condenser assembly
N1A0080E
4
3
1
2
AIR CONDITIONING 1B-25
Receiver / Drier (4HK1-TC Engine Model For Australia)
Removal
Preparation:
Disconnect the battery ground cable.
Discharge and recover refrigerant.
1. Pressure Switch Connector
2. Refrigerant line
• Use a back up wrench when disconnecting and re-
connecting the refrigerant line.
• When removing the line connected part, the con-
necting part should immediately be plugged or
capped to prevent foreign matter from being mixed
into the line.
3. Receiver / Drier
• Loosen the fixing bolt and carefully pull out the re-
ceiver/drier.
Installation
To install, follow the removal steps in the reverse order,
noting the following points:
1. If installing a new receiver/drier, be sure to add 30
cc (0.8 Imp fl oz) of new specified compressor oil to
a new one.
2. Put the receiver/drier in the bracket, and connect
with the refrigerant line. Check that no excessive
force is imposed on the line. Fasten the fixing bolt
to the receiver/drier.
Legend
1. Refrigerant line
3. Receiver / drier
2. Pressure switch
4. Condenser assembly
2
3
4
1
N1A0198E