Isuzu N-Series. Manual — part 629
ENGINE ELECTRICAL 6D-9
On-Vehicle Service
Component
Legend
1. 50 terminal
4. Starter assembly
2. 30 terminal
5. Spacer (4JB1, except cold area)
3. Earth cable terminal
N6A3491E
6D-10 ENGINE ELECTRICAL
Removal
Preparation
• Disconnect Battery Ground Cable.
1. “50” Terminal
2. “30” Terminal
3. Earth Cable Terminal
4. Starter Assembly
5. Spacer (4JB1, Except cold area)
Installation
1. Spacer (4JB1, Except cold area)
2. Starter Assembly
• Tighten the fixing bolt and nut to the specified
torque
Tighten:
Starter Bolts and Nuts to 81 N
⋅m (8.3 Kg⋅m/60 lb⋅ft)
3. Earth Cable Terminal
• Connect the earth cable terminal.
4. “30” Terminal
• Connect the harness connector.
5. “50” Terminal
• Connect the battery cable terminal with starter
switch harness terminal, then tighten nut to the
specified torque.
Tighten:
Fixing Nut to 9 N
⋅m (0.9 Kg⋅m/78 lb⋅in)
• Connect the battery cable.
N6A3492E
ENGINE ELECTRICAL 6D-11
Unit Repair
Component
Legend
1. Lead wire
8. Overrunning clutch
2. Through bolt
9. Return spring
3. Yoke assembly
10. Steel ball
4. Cover yoke
11. Idle pinion
5. Brush and brush holder
12. Retainer
6. Armature
13. Roller
7. Drive side housing
14. Magnetic switch
N6A3493E
6D-12 ENGINE ELECTRICAL
Disassembly
1. Lead Wire
Disconnect the lead wire from the magnetic switch.
2. Through Bolt
Remove the through bolts from the yoke.
3. Yoke Assembly
Separate the yoke from the solenoid switch.
4. Yoke Cover
5. Brush and Brush Holder
Remove (pull out) the brushes and the brush hold-
er from the armature with a pair of long-nose pliers.
6. Armature
7. Drive Side Housing
8. Overrunning Clutch
Remove the overrunning clutch from the housing.
N6A3494E
N6A3495E
Legend
1. Bush
2. Spring
N6A3496E
N6A3497E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст