Isuzu N-Series. Manual — part 541
Engine Electrical 6D-31
2) File away any foreign material clinging to the
edge of the lead wire.
3) Remove the brushes from the brush holder.
4) Install the new brushes.
5) Straighten the bent portion of the clip.
6) File away any foreign material clinging to the
clip surface.
7) Place the lead wire in the clip.
8) Bend the clip shut.
9) Solder the brush lead.
10) Repeat the procedure for each of the brushes.
Overrunning Clutch
1. Inspect the overrunning clutch gear teeth for
excessive wear and damage.
Replace the overrunning clutch if necessary.
2. Rotate the pinion clockwise.
It should turn smoothly.
3. Try to rotate the pinion in the opposite direction.
The pinion should lock.
Ball Bearing
Inspect the bearings for excessive wear and damage.
Replace the bearings if necessary.
Magnetic Switch
The following tests must be performed with the starter
motor fully assembled.
The yoke lead wire must be disconnected from the “C”
terminal.
To prevent coil burning, complete each test as quickly
as possible (within three to five seconds).
Temporarily connect the magnetic switch between the
clutch and the housing and run the following test.
Complete each test within three to five seconds.
1. Pull-Out Test
Connect the battery negative terminal with the
magnetic switch body and the C terminal. When
N6A1015E
N6A1016E
N6A1017E
N6A1017E
6D-32 Engine Electrical
current is applied to the 50 terminal from the
battery positive terminal, the pinion should flutter.
2. Hold-in Maintenance Test
Disconnect the lead at the C terminal. The pinion
should continue to flutter.
3. Return Test
Connect the battery negative leads to the starter
body and the 50 terminal.
Connect the battery positive lead at the C terminal.
The pinion should return to its home position.
Reassembly
1. Gear Case
2. Magnetic Switch Assembly
3. Torsion Spring
4. Shift Lever
1) Attach the torsion spring to the hole in the
magnetic switch as illustrated.
2) Insert the shift lever into the plunger hole of the
magnetic switch.
5. Dust Cover
Install the dust cover.
6. Bolt
Install the magnetic switch assembly in the gear
case and tighten the bolt to the specified torque.
N6A6509E
N6A6510E
N6A6511E
N6A1023E
Engine Electrical 6D-33
Tighten:
Gear case bolt to 8 N
⋅m (0.8 kg⋅m / 69 lb⋅in)
7. Pinion Clutch
8. Pinion Shaft
Apply a coat of grease to the pinion clutch gear and
install the pinion assembly to the armature shaft.
9. Return Spring
10. Pinion Stopper
11. Pinion Stopper Clip
12. Ball Bearing
13. Bearing Holder
14. Clutch Assembly
15. Bearing Retainer
16. Armature
17. Yoke
18. Brush Holder
1) Twist the holder spring and hold it.
2) Install the brush to the brush holder.
3) Repeat step 1 and 2 for the reaming holders.
4) Install the brush holder assembly to the yoke.
Take care not to damage the commutator face
and the brushes.
19. Rear Cover
20. Through Bolt
Install the through bolts in the rear cover and
tighten them to the specified torque.
N6A6508E
N6A1025E
N6A1026E
N6A1027E
6D-34 Engine Electrical
Tighten:
Through bolt to 6 N
⋅m (0.6 kg⋅m / 52 lb⋅in)
21. Lead Wire Nut
Connect the lead wire in the magnetic switch and
tighten the terminal nut to the specified torque.
Tighten:
Lead wire terminal nut to 10 N
⋅m (1.0 kg⋅m / 87 lb⋅in)
Pinion Jump-out dimension
• Connect the (+) cable of battery to terminal S and
the (
−) cable to terminal M. Turn the switch on, and
measure pinion travel dimension “L” in thrust
direction from the jump-out position.
In measuring the dimension, pull the pinion out a little in
the arrow direction.
If the measured value is out of standard, adjust the of
shims.
N6A1028E
N6A1029E
Legend
1. Spacer
mm (in)
Dimension
Standard
L
0.3 — 0.1 (0.01 — 0.004)
N6A1030E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст