Isuzu Trooper (1998-2002 year). Manual — part 12
HEATING AND VENTILATION 1A – 21
INSTALLATION
To install, follow the removal steps in the reverse order,
noting the following point:
1. Connect each duct and nozzle securely leaving no
clearance between them and making no improper
matching.
REMOVAL
Preparation:
Disconnect the battery ground cable
1. Instrument panel assembly
•
Refer to Section 10 “BODY” for INSTRUMENT
PANEL ASSEMBLY removal procedure.
2. Center ventilation upper duct
3. Side ventilation duct
4. Center ventilation lower duct
5. Driver lap duct
6. Center console
7. Rear heater duct
•
Refer to Section 10 “BODY” for CONSOLES
removal procedure.
8. Cross beam assembly
•
Refer to Section 10 “BODY” for CROSS BEAM
ASSEMBLY removal procedure.
9. Side defroster nozzle
10. Center defroster nozzle
1A – 22 HEATING AND VENTILATION
Removal Steps
1. Front console assembly
2. Lower cluster assembly
3. Instrument panel driver lower
cover assembly
4. Meter cluster assembly
5. Center vent
6. Side vent
Installation Steps
To install, follow the removal steps in the
reverse order.
CENTER AND/OR SIDE VENT
6
5
3
1
2
4
This illustration is based on LHD
740RW168
HEATING AND VENTILATION 1A – 23
INSTALLATION
To install, follow the removal steps in the reverse order.
REMOVAL
1. Front console assembly
2. Lower cluster assembly
3. Instrument panel driver lower cover assembly
4. Meter cluster assembly
•
Refer to Section 10 “BODY” for INSTRUMENT
PANEL ASSEMBLY removal procedure.
5. Center vent
•
Remove screws and the center vent from center
cluster while prying up the center vent catch
portions.
6. Side vent
•
Remove screws and the side vent from center
cluster while prying up the side vent catch
portions.
1A – 24 HEATING AND VENTILATION
Removal Steps
1. Center console assembly
2. Lower cluster assembly
3. Glove box
4. Instrument panel passenger lower
cover assembly
5. Instrument panel driver lower cover
assembly
6. Meter cluster assembly
7. Attaching screws
8. Fan switch and air conditioning switch
connector
9. Control lever assembly
10. Control cable
CONTROL LEVER ASSEMBLY AND/OR CONTROL CABLES
6
1
5
2
10
7
7
8
8
9
10
To Mode control link
To Temp control link
To Blower assembly
4
3
Installation Steps
To install, follow the removal steps in
the reverse order.
This illustration is based on LHD
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.