Nissan Almera Tino V10. Manual — part 21

YFE038

GI

MA

EM

LC

EC

CL

MT

AT

AX

SU

BR

ST

RS

BT

HA

SC

EL

IDX

EXHAUST SYSTEM

QG

Removal and Installation (Cont’d)

FE-13

YFE039

EXHAUST SYSTEM

QG

Removal and Installation (Cont’d)

FE-14

Special Service Tool

NLFE0031

Tool number
Tool name

Description

KV999G0010
Fuel tank lock ring
socket

NT057

Removing and installing fuel tank lock
ring

Commercial Service Tool

NLFE0027

Tool name

Description

Fuel filter wrench

NT553

Removing fuel filter
a: Max. 100 mm (3.94 in) dia.

GI

MA

EM

LC

EC

CL

MT

AT

AX

SU

BR

ST

RS

BT

HA

SC

EL

IDX

PREPARATION

YD

Special Service Tool

FE-15

Removal and Installation

NLFE0013

CAUTION:

Do not disassemble the accelerator pedal assembly. Do not remove the sensors and the switches
from the assembly.

Avoid impact from dropping etc. during handling.

Be careful to keep the assembly away from water.

YFE040

Inspection

NLFE0020

Check that the accelerator pedal moves smoothly within the
whole operation range.

Check that the accelerator pedal securely returns to the origi-
nal position.

Check that the drum of the accelerator work unit can be fully
opened.

Refer to EC-971 or EC-1280, “Basic Inspection” for the inspec-
tion of the accelerator work unit and the accelerator pedal
switch.

ACCELERATOR CONTROL SYSTEM

YD

Removal and Installation

FE-16

Была ли эта страница вам полезна?
Да!Нет
7 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности