Nissan Murano Z51. Manual — part 1061
MWI-102
< PREPARATION >
PREPARATION
PREPARATION
PREPARATION
Commercial Service Tools
INFOID:0000000005536288
Tool name
Description
Power tool
Loosening screws
PBIC0191E
MWI
COMBINATION METER
MWI-103
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
B
A
O
P
REMOVAL AND INSTALLATION
COMBINATION METER
Exploded View
INFOID:0000000005524927
.
DISASSEMBLY
Removal and Installation
INFOID:0000000005524928
REMOVAL
Removal
1.
Remove the cluster lid A. Refer to
IP-13, "Removal and Installation"
.
2.
Remove screws (A) and connector, and remove combination
meter (1).
INSTALLATION
Install in the reverse order of removal.
Disassembly and Assembly
INFOID:0000000005524929
DISASSEMBLY
1.
Disengage the tabs to separate upper housing.
2.
Disengage the tabs to separate front cover.
ASSEMBLY
Assemble in the reverse order of disassembly.
JPNIA0811ZZ
1.
Front cover
2.
Upper housing
3.
Unified meter control unit
JPNIA0810ZZ
MWI-104
< REMOVAL AND INSTALLATION >
METER CONTROL SWITCH
METER CONTROL SWITCH
Exploded View
INFOID:0000000005524930
REMOVAL
.
DISASSEMBLY
Removal and Installation
INFOID:0000000005524931
REMOVAL
1.
Remove cluster lid A. Refer to
2.
Remove meter control switch connectors and remove meter control switches.
INSTALLATION
Install in the reverse order of removal.
JPNIA0812ZZ
1.
Meter control switch (LH)
2.
Meter control switch (RH)
3.
Cluster lid A
MWI
COMPASS
MWI-105
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
B
A
O
P
COMPASS
Exploded View
INFOID:0000000005524932
(with ADP) or
(without ADP).
Removal and Installation
INFOID:0000000005524933
MIR-70, "Removal and Installation"
(with ADP) or
MIR-93, "Removal and Installation"
(without ADP).
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст