Nissan Rogue. Manual — part 573
TIMING CHAIN
EM-57
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
b. Apply a continuous bead of liquid gasket to front cover as
shown.
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-22, "Recommended Chemical Products and Sealants"
.
CAUTION:
• Be sure sealant surfaces are free from grease, dirt, water,
and engine oil.
• Be sure to apply sealant without breaks or overlap.
• Installation should be done within 5 minutes after applica-
tion of liquid gasket.
• Do not fill the engine with engine oil for at least 30 min-
utes after the components are installed to allow the liquid
gasket to cure.
c. Make sure the mating marks on the timing chain and each sprocket are still aligned. Then install the front
cover.
CAUTION:
Do not damage the front oil seal during installation.
d. Tighten front cover bolts in the numerical order shown.
e. After all bolts are tightened, retighten them to the specified
torque.
CAUTION:
Wipe off excess sealant leaking at the surface for installing
the oil pan.
10. Install the chain guide between the camshaft sprockets.
11. Install valve timing control cover. Refer to
EM-80, "Valve Timing Control Cover"
12. Insert crankshaft pulley by aligning with crankshaft key.
• Tap its center with a plastic hammer to insert.
CAUTION:
• Do not hit belt mounting section with hammer to avoid breaking belt guide.
• Be sure not to damage front oil seal while installing crankshaft pulley.
(a)
: 35.7 mm (1.406 in)
(b)
: 6.0 – 7.0 mm (0.236 – 0.276 in)
(c)
: 3.4 – 4.4 mm (0.134 – 0.173 in)
(d)
: 179.6 mm (7.07 in)
(e)
: 35.5 mm (1.398 in)
(f)
: 31.3 mm (1.232 in)
(G) : Dowel pin hole
ALBIA0943ZZ
Front cover bolts
Bolts 6, 10, 12
: 49 N·m (5.0 kg-m, 36 ft-lb)
Bolts (all remaining) : 12.8 N·m (1.3 kg-m, 9 ft-lb)
(A)
: Dowel pin
ALBIA0944ZZ
EM-58
< REMOVAL AND INSTALLATION >
TIMING CHAIN
13. Install crankshaft pulley bolt (1) and tighten to specification.
CAUTION:
• Apply anti-corrosive engine oil to threads of crankshaft
pulley bolt (1) and bolt bearing surface prior to installa-
tion.
• Secure crankshaft pulley (2) with suitable tool to tighten
the bolt.
14. Apply a paint mark (A) on the front cover, mating with any one of six easy to recognize stamp marks on
bolt flange (B).
15. Installation of the remaining components is in the reverse order of removal.
Step 1
: Crankshaft bolt (1) : 42.1 N·m (4.3 kg-m,
31 ft-lb)
Step 2
: Crankshaft bolt (1) : 60
° + 6°
ALBIA0862GB
CYLINDER HEAD
EM-59
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
CYLINDER HEAD
Exploded View
INFOID:0000000011279962
Removal and Installation
INFOID:0000000011279963
REMOVAL
1. Remove the timing chain. Refer to
EM-50, "Removal and Installation"
2. Remove the camshafts. Refer to
EM-69, "Removal and Installation"
3. Remove spark plugs. Refer to
EM-19, "Removal and Installation"
4. Remove the intake manifold. Refer to
EM-29, "Removal and Installation"
.
5. Remove the exhaust manifold and three way catalyst. Refer to
EM-32, "Removal and Installation"
6. Loosen the cylinder head bolts in the reverse order shown,
using power tool.
7. Remove cylinder head.
8. Remove cylinder head gasket.
INSPECTION AFTER REMOVAL
Outer Diameter of Cylinder Head Bolts
1. Cylinder head
2. Cylinder head gasket
A. Refer to INSTALLATION
AWBIA1921ZZ
: Engine front
AWBIA1922ZZ
EM-60
< REMOVAL AND INSTALLATION >
CYLINDER HEAD
• Replace the cylinder head bolts with new ones if the size differ-
ence between d1 and d2 exceeds the limit.
• If reduction of outer diameter appears in a position other than d2,
use it as d2 point.
INSTALLATION
1. Clean surfaces of cylinder head and cylinder block.
2. Install a new cylinder head gasket.
CAUTION:
Do not reuse cylinder head gasket.
3. Install the cylinder head.
4. Follow the steps below to tighten the cylinder head bolts in the numerical order as shown.
• Clean threads and seating surfaces of bolts.
• Apply new engine oil to the threads and the seating surfaces of bolts.
CAUTION:
• If cylinder head bolts are re-used, check their outer diameters before installation. Follow the
Outer Diameter of Cylinder Head Bolts measurement procedure.
• Check and confirm the tightening angle by using angle
wrench or protractor. Do not judge angle by visual inspec-
tion.
5. Installation of the remaining components is in the reverse order of removal.
Limit (d1 - d2)
: 0.23 mm (0.0091 in) or more
AWBIA1923ZZ
Tool number (A)
: KV10112100 (BT-8653-A)
PBIC3208J
Step a
: 50 N·m (5.1 kg-m, 37 ft-lb) in order
Step b
: 60
° clockwise in order
Step c
: Loosen to 0 N·m in order
Step d
: 39.2 N·m (4.0 kg-m, 29 ft-lb) in order
Step e
: 75
° clockwise in order
Step f
: 75
° clockwise in order
: Engine front
AWBIA1922ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст