Nissan Qashqai J11. Manual — part 1974
CHG
CHARGING SYSTEM
CHG-43
< WIRING DIAGRAM >
[TYPE 2]
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
JRMWE9588GB
CHG-44
< WIRING DIAGRAM >
[TYPE 2]
CHARGING SYSTEM
JRMWE9589GB
CHG
CHARGING SYSTEM
CHG-45
< WIRING DIAGRAM >
[TYPE 2]
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
JRMWE9590GB
CHG-46
< BASIC INSPECTION >
[TYPE 2]
DIAGNOSIS AND REPAIR WORK FLOW
BASIC INSPECTION
DIAGNOSIS AND REPAIR WORK FLOW
Work Flow
INFOID:0000000010671007
DETAILED FLOW
1.
CHECK FOR DTC
Perform self diagnosis with CONSULT.
Is any DTC detected?
YES
>> Repair as needed.
NO
>> GO TO 2.
2.
PRELIMINARY INSPECTION
Perform the preliminary inspection. Refer to
CHG-47, "Inspection Procedure"
.
>> GO TO 3.
3.
INSPECTION WITH CHARGE WARNING LAMP (IDLING)
Start the engine and run it at idle.
Does the charge warning lamp turn OFF?
YES
>> GO TO 4.
NO
>> GO TO 5.
4.
INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 2,500 RPM)
Increase and maintain the engine speed at 2,500 rpm.
Does the charge warning lamp illuminate?
YES
>> GO TO 5.
NO
>> INSPECTION END
5.
MEASURE “B” TERMINAL VOLTAGE
Start engine. With engine running at 2,500 rpm, measure “B” terminal voltage.
What voltage does the measurement result show?
Less than 13.0 V>>GO TO 6.
More than 16.0 V>>Replace alternator. Refer to
CHG-51, "HRA2DDT : Removal and Installation"
engine),
CHG-52, "MR20DD : Removal and Installation"
6.
“B” TERMINAL CIRCUIT INSPECTION
Check “B” terminal circuit. Refer to
Is the inspection result normal?
YES
>> Replace alternator. Refer to
CHG-51, "HRA2DDT : Removal and Installation"
(HR engine),
52, "MR20DD : Removal and Installation"
CHG-53, "R9M : Removal and Installa-
(R9M engine).
NO
>> Repair as needed.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст