Nissan Qashqai J11. Manual — part 841
FRONT WHEEL HUB AND KNUCKLE
FAX-51
< REMOVAL AND INSTALLATION >
[4WD]
C
E
F
G
H
I
J
K
L
M
A
B
FAX
N
O
P
• Clean the mating surfaces of the joint sub-assembly and the wheel
hub and bearing. Apply Molykote M77 lubricant to the surface (A)
of the joint sub-assembly.
CAUTION:
Apply lubricant to cover the entire flat mating surface of the
joint sub-assembly.
NOTE:
Always check with the Parts Department for the latest parts informa-
tion.
• Hold the wheel hub and bearing using a suitable tool. Tighten the wheel hub lock nut.
CAUTION:
• Since the drive shaft is assembled by press-fitting, use a torque wrench to tighten the wheel hub
lock nut. Do not use a power tool.
• Too much torque causes axle noise. Too little torque causes wheel bearing looseness. Tighten the
wheel hub lock nut to the specification.
• When installing a the cotter pin (1) and the nut retainer (2),
securely bend the cotter pin to prevent rattles.
• Align the matching marks (A) on the disc brake rotor and on the
wheel hub and bearing.
• Complete the inspection. Refer to
.
Inspection
INFOID:0000000010297866
INSPECTION AFTER REMOVAL
Check components for deformation, cracks, and other damage. Replace if there are.
Ball Joint Inspection
Check boots of transverse link and steering outer socket ball joint for breakage, axial play, and torque. Refer to
.
INSPECTION AFTER INSTALLATION
• Check the wheel alignment. Refer to
FSU-7, "Wheel Alignment Inspection"
.
• Adjust neutral position of steering angle sensor after checking the wheel alignment. Refer to
Amount of lubricant
JPDIG0122ZZ
JPDIF0295ZZ
JPDIG0066ZZ
FAX-52
< REMOVAL AND INSTALLATION >
[4WD]
FRONT DRIVE SHAFT BOOT
FRONT DRIVE SHAFT BOOT
Exploded View
INFOID:0000000010435905
REMOVAL
LEFT SIDE
RIGHT SIDE (MR20DD)
RIGHT SIDE (R9M)
E1DIA0230GB
1.
Drive shaft
2.
Cotter pin
Refer to
for symbols in the figure.
E1DIA0232GB
1.
Cotter pin
2.
Drive shaft
3.
Plate
4.
Support bearing bracket
Refer to
for symbols in the figure.
AWDIA1158ZZ
FRONT DRIVE SHAFT BOOT
FAX-53
< REMOVAL AND INSTALLATION >
[4WD]
C
E
F
G
H
I
J
K
L
M
A
B
FAX
N
O
P
DISASSEMBLY
LEFT SIDE
RIGHT SIDE (MR20DD)
1.
Cotter pin
2.
Nut retainer
3.
Drive shaft
Refer to
JPDIF0047ZZ
1.
Circular clip
2.
Dust shield
3.
Housing
4.
Snap ring
5.
Spider assembly
6.
stopper ring
7.
Boot band
8.
Boot
9.
Shaft
10. Damper band
11.
Dynamic damper
12. Circular clip
13. Joint sub-assembly
: Wheel side
: Fill NISSAN Genuine grease or equivalent.
Refer to
for symbols not described on the above.
JPDIF0045ZZ
1.
Joint sub-assembly
2.
Circular clip
3.
Boot band
4.
Boot
5.
Shaft
6.
Damper band
7.
Dynamic damper
8.
Stopper ring
9.
Spider assembly
10. Snap ring
11.
Housing assembly
12. Dust shield
FAX-54
< REMOVAL AND INSTALLATION >
[4WD]
FRONT DRIVE SHAFT BOOT
RIGHT SIDE (R9M)
WHEEL SIDE
WHEEL SIDE : Removal and Installation
INFOID:0000000010435907
REMOVAL
1.
Remove tires from vehicle.
13. Support bearing
14. Snap ring
15. Dust shield
: Wheel side
: Fill NISSAN Genuine grease or equivalent.
Refer to
for symbols not described on the above.
AWDIA1159ZZ
1.
Joint sub-assembly
2.
Circular clip
3.
Boot band
4.
Boot
5.
Shaft
6.
Stopper ring
7.
Spider assembly
8.
Snap ring
9.
Housing assembly
10. Dust shield
11.
Support bearing
12. Plate
13. Support bearing bracket
: Wheel side
: Fill NISSAN Genuine grease or equivalent.
Refer to
for symbols not described on the above.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст