Nissan Qashqai J11. Manual — part 1970
CHG
CHARGING SYSTEM
CHG-27
< SYMPTOM DIAGNOSIS >
[TYPE 1]
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
SYMPTOM DIAGNOSIS
CHARGING SYSTEM
Symptom Table
INFOID:0000000010431026
Symptom
Reference
Discharged battery
The charge warning lamp does not turn OFF after the engine
starts.
CHG-28
< REMOVAL AND INSTALLATION >
[TYPE 1]
ALTERNATOR
REMOVAL AND INSTALLATION
ALTERNATOR
HRA2DDT
HRA2DDT : Exploded View
INFOID:0000000010323934
HRA2DDT : Removal and Installation
INFOID:0000000010323935
REMOVAL
1.
Disconnect the battery cable from the negative terminal. Refer to
PG-155, "Removal and Installation"
2.
Remove drive belt. Refer to
EM-16, "Removal and Installation"
.
3.
Remove intake manifold. Refer to
EM-25, "Removal and Installation"
4.
Disconnect alternator connector.
5.
Remove “B” terminal nut and disconnect “B” terminal harness.
6.
Remove upper alternator mounting bolt and alternator lower mounting bolt.
7.
Remove alternator upward from the vehicle.
INSTALLATION
Note the following items, and then install in the reverse order of removal.
CAUTION:
• Temporarily tighten the alternator bolts in order from the upper to the lower, and then tighten them in
order from the upper to the lower.
For the alternator, the front side (pulley side) surface is the reference surface. Fit the reference sur-
face to the alternator mounting part, and then tighten the bolts.
• Be careful to tighten “B” terminal nut to the specified torque.
• Install alternator, and check tension of belt. Refer to
1.
Alternator bracket mounting bolt
2.
Alternator bracket
3.
Stud bolt
4.
Alternator mounting bolt
5.
“B” terminal harness
6.
“B” terminal nut
7.
Alternator connector
8.
Alternator
: Vehicle front
: N·m (kg-m, ft-lb)
: N·m (kg-m, in-lb)
,
,
,
: Indicates that the part is connected at points with same symbol in actual vehicle.
JMMIA1619GB
CHG
ALTERNATOR
CHG-29
< REMOVAL AND INSTALLATION >
[TYPE 1]
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
• For this model (with battery current sensor models), the energy management system that controls
the power generation voltage of the alternator has been adopted. Therefore, the power generation
voltage variable control system operation inspection should be performed after replacing the alter-
nator, and then make sure that the system operates normally. Refer to
.
The battery current sensor is installed to the battery cable at
the negative terminal.
NOTE:
Install alternator bracket according to the following procedures.
1.
Install and tighten stud bolt (1).
2.
Set alternator bracket (2) on stud bolt.
3.
Temporarily tighten mounting bolts.
4.
Tighten mounting bolts in numerical order as shown in the fig-
ure.
K9K
K9K : Exploded View
INFOID:0000000010323924
JPBIA3262ZZ
JMMIA1620ZZ
1.
Alternator mounting bolt
2.
Alternator
3.
“B” terminal harness
4.
“B” terminal nut
5.
Alternator bracket
6.
Alternator connector
: N·m (kg-m, ft-lb)
JMMIA1609GB
CHG-30
< REMOVAL AND INSTALLATION >
[TYPE 1]
ALTERNATOR
K9K : Removal and Installation
INFOID:0000000010323925
REMOVAL
1.
Disconnect the battery cable from the negative terminal. Refer to
PG-155, "Removal and Installation"
2.
Remove front fender protector RH partially. Refer to
.
3.
Remove air inlet hose. Refer to
.
4.
Remove water tube clip (1).
5.
Remove drive belt. Refer to
EM-273, "Removal and Installation"
6.
Disconnect alternator connector.
7.
Remove “B” terminal nut and disconnect “B” terminal harness.
8.
Remove upper alternator mounting bolt.
9.
Release lower alternator mounting bolt, then push it aside.
10. Remove alternator with lower mounting bolt.
NOTE:
Pull alternator to the front side from upside. Turn, then pull lower side of alternator with lower mounting
bolt.
INSTALLATION
Note the following items, and then install in the reverse order of removal.
CAUTION:
• Temporarily tighten the alternator bolts in order from the upper to the lower, and then tighten them in
order from the upper to the lower.
For the alternator, the front side (pulley side) surface is the reference surface. Fit the reference sur-
face to the alternator mounting part, and then tighten the bolts.
• Be careful to tighten “B” terminal nut to the specified torque.
• Install alternator, and check tension of belt. Refer to
• For this model (with battery current sensor models), the energy management system that controls
the power generation voltage of the alternator has been adopted. Therefore, the power generation
voltage variable control system operation inspection should be performed after replacing the alter-
nator, and then make sure that the system operates normally. Refer to
.
The battery current sensor is installed to the battery cable at
the negative terminal.
R9M
JMMIA1709ZZ
JPBIA3262ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст