Nissan Murano. Manual — part 245
REPAIRING HIGH STRENGTH STEEL
BRM-5
< PRECAUTION >
[FOR USA AND CANADA]
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
• The panel surfaces must fit flush to each other, leaving no
gaps.
• Follow the specifications for the proper welding pitch.
Unit: mm (in)
Handling of Ultra High Strength Steel Plate Parts
INFOID:0000000009718034
PROHIBITION OF CUT AND CONNECTION
Never cut and Joint the stiffener front side member (front floor inside frame parts) because its material is high
strength steel plate (ultra high strength steel plate).
The front floor assembly must be replaced if this part is damaged.
PIIA0147E
Thickness (T)
Minimum pitch (L)
0.6 (0.024)
0.8 (0.031)
1.0 (0.039)
1.2 (0.047)
1.6 (0.063)
1.8 (0.071)
10 (0.39) or more
12 (0.47) or more
18 (0.71) or more
20 (0.79) or more
27 (1.06) or more
31 (1.22) or more
JSKIA0781ZZ
BRM-6
< PREPARATION >
[FOR USA AND CANADA]
REPAIRING MATERIAL
PREPARATION
REPAIRING MATERIAL
Foam Repair
INFOID:0000000009718035
During factory body assembly, foam insulators are installed in certain body panels and locations around the
vehicle. Use the following procedure(s) to replace any factory-installed foam insulators.
URETHANE FOAM APPLICATIONS
Use commercially available Urethane foam for sealant (foam material) repair of material used on vehicle.
Read instructions on product for fill procedures.
Example of foaming agent filling operation procedure
1.
Fill procedures after installation of service part.
a.
Eliminate foam material remaining on vehicle side.
b.
Clean area after eliminating form insulator and foam material.
c.
Install service part.
d.
Insert nozzle into hole near fill area and fill foam material or fill enough to close gap with the service part.
2.
Fill procedures before installation of service part.
a.
Eliminate foam material remaining on vehicle side.
b.
Clean area after eliminating foam insulator and foam material.
c.
Fill foam material on wheelhouse outer side.
<Urethane foam for foaming agent>
3M™ Automix™ Flexible Foam 08463 or equiva-
lent
1.
Urethane foam
A.
Nozzle insert hole
: Vehicle front
JSKIA0129GB
REPAIRING MATERIAL
BRM-7
< PREPARATION >
[FOR USA AND CANADA]
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
NOTE:
Fill enough to close gap with service part while avoiding flange
area.
d.
Install service part.
NOTE:
Refer to label for information on working times.
1.
Urethane foam
A.
Fill while avoiding flange area
: Vehicle front
JSKIA0130GB
BRM-8
< PREPARATION >
[FOR USA AND CANADA]
BODY COMPONENT PARTS
BODY COMPONENT PARTS
Underbody Component Parts
INFOID:0000000009718036
1.
Lower rear hoodledge (RH & LH)
2.
Upper hoodledge (RH & LH)
3.
Hoodledge reinforcement (RH & LH)
4.
Center cowl top
5.
Upper dash
6.
Lower dash
7.
Side dash (RH & LH)
8.
Front floor
9.
Inner sill (RH & LH)
JSKIA1107ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст