Nissan Pathfinder. Manual — part 550
OIL PAN AND OIL STRAINER
EM-39
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
14. Remove front cover gasket and rear oil seal retainer gasket.
15. If re-installing the original oil pan, remove the old sealant from
the mating surfaces using a scraper.
• Also remove the old sealant from mating surface of the cylin-
der block.
• Remove the old sealant from the bolt holes and threads.
CAUTION:
Do not scratch or damage the mating surfaces when clean-
ing off the old sealant.
INSPECTION AFTER REMOVAL
Clean debris from oil strainer.
INSTALLATION
1. Install oil strainer and tighten bolt to specified torque. Refer to
2. Apply Genuine Silicone RTV Sealant or equivalent to the front
cover gasket and the rear oil seal retainer gasket as shown.
Refer to
GI-22, "Recommended Chemical Products and Seal-
CAUTION:
• Installation should be done within 5 minutes after apply-
ing liquid gasket.
• Do not fill the engine with engine oil for at least 30 min-
utes after the components are installed to allow the seal-
ant to cure.
3. Install the front cover gasket and rear oil seal retainer gasket as
shown.
CAUTION:
Do not reuse front cover gasket or rear oil seal retainer gas-
ket.
WBIA0328E
MEM108A
SEM964E
WBIA0328E
EM-40
< REMOVAL AND INSTALLATION >
OIL PAN AND OIL STRAINER
4. Apply a bead of sealant to the cylinder block mating surface of
the upper oil pan as shown.
CAUTION:
• Installation should be done within 5 minutes after apply-
ing liquid gasket.
• Do not fill the engine with engine oil for at least 30 min-
utes after the components are installed to allow the seal-
ant to cure.
NOTE:
• Apply liquid gasket to the outside of bolt holes 5, 6, 10, 11 and
12.
• Apply liquid gasket to the inside of the other bolt holes.
a. Be sure the sealant is applied 4.0 - 5.0 mm (0.157 - 0.197 in) as shown. Increase the bead to 4.5 - 5.5 mm
(0.177 - 0.217 in) at the four places indicated.
b. Use Genuine Silicone RTV Sealant, or equivalent. Refer to
22, "Recommended Chemical Products and Sealants"
.
5. Install new O-rings on the cylinder block and oil pump body.
CAUTION:
Do not reuse O-rings.
6. Install the upper oil pan.
• Tighten bolts (1) and (2) to specification within five minutes of
applying the liquid gasket.
• Tighten the remaining upper oil pan bolts to specification in the
order shown.
CAUTION:
• Installation should be done within 5 minutes after apply-
ing liquid gasket.
• Do not fill the engine with engine oil for at least 30 min-
utes after the components are installed to allow the seal-
ant to cure.
7. Install the lower oil pan. Refer to
EM-36, "Removal and Installation (Lower Oil Pan)"
.
8. Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
• Before starting engine, check oil/fluid levels including engine coolant and engine oil. If there is less than
required quantity, fill to the specified level. Refer to
MA-15, "FOR USA AND CANADA : Fluids and Lubri-
(United States and Canada) or
MA-16, "FOR MEXICO : Fluids and Lubricants"
(Mexico).
• Use procedure below to check for fuel leaks.
• Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leaks
at connection points.
SEM185FA
SEM159F
WBIA0327E
AWBIA1212GB
OIL PAN AND OIL STRAINER
EM-41
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
• Start engine. With engine speed increased, check again for fuel leaks at connection points.
• Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal and installation, slack in the guide
may generate a pounding noise during and just after engine start. However, this is normal. Noise will stop
after hydraulic pressure rises.
• Warm up engine thoroughly to make sure there are no leaks of fuel, exhaust gas, or any oils/fluids including
engine oil and engine coolant.
• Bleed air from passages in lines and hoses, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to spec-
ified level, if necessary.
• Summary of the inspection items:
*Power steering fluid, brake fluid, etc.
Item
Before starting engine
Engine running
After engine stopped
Engine coolant
Level
Leaks
Level
Engine oil
Level
Leaks
Level
Transaxle Fluid
CVT Models
Leaks
Level/Leaks
Leaks
Level/Leaks
Leaks
Level/Leaks
Other oils and fluids*
Level
Leaks
Level
Fuel
Leaks
Leaks
Leaks
Exhaust gas
—
Leaks
—
EM-42
< REMOVAL AND INSTALLATION >
IGNITION COIL
IGNITION COIL
Exploded View
INFOID:0000000009177910
Removal and Installation (LH)
INFOID:0000000009177911
REMOVAL
1. Remove engine room cover. Refer to
EM-23, "Removal and Installation"
2. Disconnect ignition coil harness connector.
3. Remove the ignition coil.
CAUTION:
Do not shock ignition coil.
INSTALLATION
Installation is in the reverse order of removal.
Removal and Installation (RH)
INFOID:0000000009177912
REMOVAL
1. Remove the intake manifold collector. Refer to
EM-26, "Removal and Installation"
.
2. Disconnect ignition coil harness connector.
3. Remove the ignition coil.
CAUTION:
Do not shock ignition coil.
INSTALLATION
Installation is in the reverse order of removal.
1.
Ignition coil
2.
Spark plug
3.
Rocker cover (RH)
4.
Rocker cover (LH)
AWBIA1226GB
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст