Nissan X-Trail 32. Manual — part 238
REPLACEMENT OPERATIONS
BRM-113
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
: Vehicle front
Replacement part
z
Upper hoodledge
z
Lower hoodledge
z
Hoodledge reinforcement
z
Hoodledge connector assembly
JSKIA4600ZZ
BRM-114
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
REPLACEMENT OPERATIONS
View E: Before installing hoodledge reinforcement
Front Side Member
INFOID:0000000010843507
Work after upper radiator core support assembly and hoodledge are removed.
: Vehicle front
JSKIA4601ZZ
REPLACEMENT OPERATIONS
BRM-115
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
: Vehicle front
: Drill
φ
7 mm (0.28 in) hole for the plug welding hole (ultra high strength steel).
: Drill
φ
11 mm (0.43 in) hole for the plug welding hole (ultra high strength steel).
: Drill
φ
12 mm (0.47 in) hole for the plug welding hole (ultra high strength steel).
: Weld the parts onto the back of the component part.
Replacement part
z
Front side member closing plate
z
Front side member assembly
z
Front suspension mounting bracket
JSKIA3848ZZ
BRM-116
< REMOVAL AND INSTALLATION >
[FOR EUROPE (RHD)]
REPLACEMENT OPERATIONS
View E: Before installing front suspension mounting bracket
: Vehicle front
: Drill
φ
8 mm (0.31 in) hole for the plug welding hole (ultra high strength steel).
: Drill
φ
10 mm (0.39 in) hole for the plug welding hole (ultra high strength steel).
: Drill
φ
12 mm (0.47 in) hole for the plug welding hole (ultra high strength steel).
: Weld the parts onto the back of the component part.
: N·m (kg-m, ft-lb)
JSKIA4603GB
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст