Nissan Murano Z50 (2006 year). Manual — part 190

STARTING SYSTEM

SC-13

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

DIAGNOSTIC PROCEDURE 1
Check “B” Terminal Circuit

1.

CHECK POWER SUPPLY FOR STARTER MOTOR “B” TERMINAL

1.

Remove fuel pump fuse.

2.

Crank or start the engine (where possible) until the fuel pressure is released.

3.

Turn ignition switch OFF.

4.

Make sure the starter motor “B” terminal F38 terminal 2 connec-
tion is clean and tight.

5.

Check voltage between starter motor “B” terminal F38 terminal 2
and ground using a digital circuit tester.

OK or NG

OK

>> GO TO 2.

NG

>> Check harness between battery and starter motor for

open circuit.

2.

CHECK BATTERY CABLE CONNECTION (VOLTAGE DROP TEST)

Check voltage between starter motor “B” terminal F38 terminal 2 and
battery positive terminal.

OK or NG

OK

>> GO TO 3.

NG

>> Check harness between battery and starter motor for

poor continuity.

3.

CHECK STARTER MOTOR GROUND CIRCUIT (VOLTAGE DROP TEST)

1.

Turn ignition switch OFF.

2.

Check voltage between starter motor case and battery negative
terminal.

OK or NG

OK

>> “B” terminal circuit is OK. Further inspection necessary.

Refer to

SC-12, "WORK FLOW"

.

NG

>> Check starter motor case and ground for poor continuity.

2 – Ground

: Battery voltage

PKIA2842E

2 – Battery positive terminal

When the ignition switch is in
START position

: Less than 0.5 V

PKIA2370E

Starter motor case – Battery negative terminal

When the ignition switch is in
START position

: Less than 0.2 V

PKIB6089E

SC-14

STARTING SYSTEM

Revision: 2006 August

2006 Murano

DIAGNOSTIC PROCEDURE 2
Check “S” Connector Circuit

1.

CHECK POWER SUPPLY FOR STARTER MOTOR “S” TERMINAL

1.

Remove fuel pump fuse.

2.

Crank or start the engine (where possible) until the fuel pressure is released.

3.

Turn the ignition switch OFF.

4.

Disconnect starter motor connector.

5.

Check voltage between starter motor harness connector F5 ter-
minal 1 and ground.

OK or NG

OK

>> “S” connector circuit is OK. Further inspection neces-

sary. Refer to

SC-12, "WORK FLOW"

.

NG

>> Check the following.

40A fusible link (letter M, located in the fuse and fusible link block)

Ignition switch

Starter relay (within the IPDM)

Harness for open or short

MINIMUM SPECIFICATION OF CRANKING VOLTAGE REFERENCING COOLANT TEMPERA-
TURE

1 – Ground

When the ignition switch is
in START position

: Battery voltage

PKIB5303E

Engine coolant temperature

Voltage [V]

30

°

C to

20

°

C (

22

°

F to

4

°

F)

8.4

19

°

C to

10

°

C (

2

°

F to 14

°

F)

8.9

9

°

C to 0

°

C (16

°

F to 32

°

F)

9.3

More than 1

°

C (More than 34

°

F)

9.7

STARTING SYSTEM

SC-15

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

Removal and Installation

NKS001MI

REMOVAL

1.

Remove battery. Refer to

SC-8, "Removal and Installation"

.

2.

Remove air duct (inlet). Refer to

EM-16, "AIR CLEANER AND AIR DUCT"

.

3.

Remove battery bracket, using power tools.

4.

Remove fluid charging pipe. Refer to

CVT-229, "Removal and

Installation"

.

5.

Disconnect “S” connector.

6.

Remove “B” terminal nut.

7.

Remove starter motor mounting bolts, using power tools.

8.

Remove starter motor upward.

INSTALLATION

Installation is the reverse order of removal.

CAUTION:

Be sure to tighten “B” terminal nut carefully.

1.

Starter motor

2.

Starter motor mounting bolt

3.

B terminal harness

4.

B terminal nut

5.

S connector

: N·m (kg-m, ft-lb)

SKIB6770E

PKIA2851E

PKIA2425E

SC-16

STARTING SYSTEM

Revision: 2006 August

2006 Murano

Disassembly and Assembly

NKS001MJ

INSPECTION AFTER DISASSEMBLY
Pinion/Clutch Check

1.

Inspect pinion teeth.

Replace pinion if teeth are worn or damaged. (Also check condition of ring gear teeth.)

2.

Inspect reduction gear teeth.

Replace reduction gear if teeth are worn or damaged. (Also check condition of armature shaft gear
teeth.)

3.

Check to see if pinion locks in one direction and rotates smoothly in the opposite direction.

If it locks or rotates in both directions, or unusual resistance is evident, replace.

1.

Magnetic switch assembly

2.

Plate

3.

Packing

4.

Plate

5.

Shift lever

6.

Front bracket assembly

7.

Pinion spring

8.

Pinion assembly

9.

Pinion stopper

10. Stopper ring

11. Brush holder assembly

12. Metal

13. Rear cover

14. Through-bolt

15. Armature assembly

16. Yoke assembly

17. Packing

18. Ball

19. Gear assembly

20. Gear shaft

21. Internal gear assembly

22. Clutch gear assembly

: N·m (kg-m, in-lb)

(H): High-temperature grease point

SKIB6768E

CHARGING SYSTEM

SC-17

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

CHARGING SYSTEM

PFP:23100

System Description

NKS001MK

The alternator provides DC voltage to operate the vehicle's electrical system and to keep the battery charged.
The voltage output is controlled by the IC regulator.
Power is supplied at all times

through 10A fuse (No. 33, located in the fuse and fusible link block)

to alternator terminal 4 (“S” terminal).

“B” terminal supplies power to charge the battery and operate the vehicle's electrical system. Output voltage is
controlled by the IC regulator at terminal 4 (“S” terminal) detecting the input voltage.
The alternator is grounded to the engine block.
With the ignition switch in the ON or START position, power is supplied

through 10A fuse [No. 14, located in the fuse block (J/B)]

to combination meter terminal 20 for the charge warning lamp.

Ground is supplied

to combination meter terminal 4

through alternator terminal 3 (“L” terminal)

to alternator terminal 2 (“E” terminal)

through ground E29.

With power and ground supplied, the charge warning lamp will illuminate. When the alternator is providing suf-
ficient voltage with the engine running, the ground is opened and the charge warning lamp will go off.
If the charge warning lamp illuminates with the engine running, a malfunction is indicated.

MALFUNCTION INDICATOR

The IC regulator warning function activates to illuminate charge warning lamp, if any of the following symp-
toms occur while alternator is operating:

Excessive voltage is produced.

No voltage is produced.

SC-18

CHARGING SYSTEM

Revision: 2006 August

2006 Murano

Wiring Diagram — CHARGE —

NKS001ML

TKWA0735E

CHARGING SYSTEM

SC-19

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

Trouble Diagnosis with Battery/Starting/Charging System Tester (Charging)

NKS001MM

NOTE:
To ensure a complete and thorough diagnosis, the battery, starter and alternator test segments must be done
as a set from start to finish.
Before starting, perform the preliminary inspection. Refer to

SC-22, "PRELIMINARY INSPECTION"

.

1.

Turn off all loads on the vehicle electrical system.

2.

Perform battery and starting system test with Battery/Starting/
Charging system tester.

3.

Press “ENTER” to begin the charging system test.

4.

Start engine.

5.

Press “ENTER” until “LOADS OFF REV ENGINE 5 SEC” is dis-
played.

6.

Raise and hold the engine speed at 1,500 to 2,000 rpm for about
5 seconds, then return the engine to idle.
Once the increase in engine rpm is detected, press “ENTER” to
continue.

NOTE:

If after 30 seconds an increase in engine idle speed is not
detected, “RPM NOT DETECTED” will display.

Some engines may have a higher idle initially after starting,
particularly when the engine is cold. The tester may detect
this without any other action being taken. If this occurs, con-
tinue on with the testing process. The final results will not be affected.

7.

The tester now checks the engine at idle and performs the
DIODE/RIPPLE check.

8.

When complete, the tester will prompt you to turn on the follow-
ing electrical loads.

Heater fan set to highest speed. Do not run the A/C or wind-
shield defroster.

Headlamp high beam

Rear window defogger

NOTE:
Do not run the windshield wipers or any other cyclical loads.

9.

Press “ENTER” to continue.

SEL417X

SEL418X

SEL419X

SEL420X

SC-20

CHARGING SYSTEM

Revision: 2006 August

2006 Murano

10. Raise and hold the engine speed at 1,500 to 2,000 rpm for about

5 seconds, then return the engine to idle. Once the increase in
engine rpm is detected, press “ENTER” to continue.

NOTE:
If after 30 seconds an increase in engine idle speed is not
detected, “RPM NOT DETECTED” will be displayed. Press
“ENTER” to restart the test.

11. Diagnostic result is displayed on the tester. Refer to

SC-20,

"DIAGNOSTIC RESULT ITEM CHART"

.

12. Press “ENTER” then test output code is displayed. Record the

test output code on the repair order.

13. Toggle back to the “DIAGNOSTIC SCREEN” for test results.

DIAGNOSTIC RESULT ITEM CHART

SEL421X

SEL422X

SEL577X

Diagnostic item

Service procedure

CHARGING SYSTEM NORMAL

Charging system is normal and will also show “DIODE RIPPLE” test result.

NO CHARGING VOLTAGE

Go to

SC-21, "WORK FLOW"

.

LOW CHARGING VOLTAGE

HIGH CHARGING VOLTAGE

DIODE RIPPLE NORMAL

Diode ripple is OK and will also show “CHARGING VOLTAGE” test result.

EXCESS RIPPLE DETECTED

Replace the alternator. Perform “DIODE RIPPLE” test again using Battery/Starting/Charging sys-
tem tester to confirm repair.

DIODE RIPPLE NOT DETECTED

Go to

SC-21, "WORK FLOW"

.

SC-22

CHARGING SYSTEM

Revision: 2006 August

2006 Murano

PRELIMINARY INSPECTION

1.

CHECK BATTERY TERMINALS CONNECTION

Check if battery terminals are clean and tight.

OK or NG

OK

>> GO TO 2.

NG

>> Repair battery terminals connection.

2.

CHECK FUSE AND FUSIBLE LINK

Check for blown alternator and combination meter fuses.

OK or NG

OK

>> GO TO 3.

NG

>> Be sure eliminate cause of malfunction before installing new fuse. Refer to

PG-3, "POWER SUP-

PLY ROUTING CIRCUIT"

.

3.

CHECK “E” TERMINAL CONNECTION

Check if “E” terminal is clean and tight.

OK or NG

OK

>> GO TO 4.

NG

>> Repair “E” terminal connection.

4.

CHECK ALTERNATOR DRIVE BELT TENSION

Check alternator and A/C compressor belt tension. Refer to

EM-13, "Checking Drive Belts"

.

OK or NG

OK

>> INSPECTION END

NG

>> Repair as needed.

Unit

Power source (Power supply terminals)

Fuse No.

Alternator

Battery (“S” terminal)

33

Combination meter

Ignition switch ON (“L” terminal)

14

CHARGING SYSTEM

SC-23

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

DIAGNOSTIC PROCEDURE 1
Check “L” Terminal Circuit (Open)

1.

CHECK “L” TERMINAL CONNECTION

1.

Turn ignition switch OFF.

2.

Check if “L” terminal is clean and tight.

OK or NG

OK

>> GO TO 2.

NG

>> Repair “L” terminal connection. Confirm repair by performing complete Battery/Starting/Charging

system test.

2.

CHECK “L” TERMINAL CIRCUIT (OPEN)

1.

Disconnect alternator connector.

2.

Apply ground to alternator harness connector F27 terminal 3
with the ignition switch in the ON position.

OK or NG

OK

>> Go to

SC-21, "WORK FLOW"

.

NG

>> Check the following.

Charge warning lamp (combination meter)

Harness for open between combination meter and
fuse

Harness for open between combination meter and alternator

DIAGNOSTIC PROCEDURE 2
Check “L” Terminal Circuit (Short)

1.

CHECK “L” TERMINAL CIRCUIT (SHORT)

1.

Turn ignition switch OFF.

2.

Disconnect alternator connector.

3.

Turn ignition switch ON.

Charge warning lamp should light up?

YES

>> Check the following.

Harness for short between combination meter and alternator

Charge warning lamp (Combination meter)

NO

>> Go to

SC-21, "WORK FLOW"

.

3 – Ground

: Charge warning lamp
should light up.

PKIB5304E

SC-24

CHARGING SYSTEM

Revision: 2006 August

2006 Murano

DIAGNOSTIC PROCEDURE 3
Check “S” Terminal Circuit

1.

CHECK “S” TERMINAL CONNECTION

1.

Turn ignition switch OFF.

2.

Check if “S” terminal is clean and tight.

OK or NG

OK

>> GO TO 2.

NG

>> Repair “S” terminal connection. Confirm repair by performing complete Battery/Starting/Charging

system test.

2.

CHECK ALTERNATOR “S” TERMINAL CIRCUIT

1.

Disconnect alternator connector.

2.

Check voltage between alternator harness connector F27 termi-
nal 4 and ground.

OK or NG

OK

>> Go to

SC-21, "WORK FLOW"

.

NG

>> Check harness for open between alternator and fuse.

4 – Ground

: Battery voltage

PKIB5305E

CHARGING SYSTEM

SC-25

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

DIAGNOSTIC PROCEDURE 4
Check “B” Terminal Circuit

1.

CHECK “B” TERMINAL CONNECTION

1.

Turn ignition switch OFF.

2.

Check if “B” terminal is clean and tight.

OK or NG

OK

>> GO TO 2.

NG

>> Repair “B” terminal connection. Confirm repair by performing complete Battery/Starting/Charging

system test.

2.

CHECK ALTERNATOR “B” TERMINAL CIRCUIT

Check voltage between alternator “B” terminal F26 terminal 1 and
ground.

OK or NG

OK

>> GO TO 3.

NG

>> Check harness for open between alternator and battery.

3.

CHECK “B” TERMINAL CONNECTION (VOLTAGE DROP TEST)

1.

Start engine.

2.

When engine running at idle and warm, check voltage between
alternator “B” terminal F26 terminal 1 and battery positive termi-
nal.

OK or NG

OK

>> Go to

SC-21, "WORK FLOW"

.

NG

>> Check harness between battery and alternator for poor

continuity.

1 – Ground

: Battery voltage

PKIA2944E

1 – Battery positive terminal

: Less than 0.2 V

PKIA2366E

SC-26

CHARGING SYSTEM

Revision: 2006 August

2006 Murano

Removal and Installation

NKS001MN

REMOVAL

1.

Disconnect the battery cable from the negative terminal.

2.

Remove engine undercover, using power tools.

3.

Remove engine right side undercover.

4.

Remove radiator and cooling fan assembly. Refer to

CO-13, "RADIATOR"

.

5.

Remove exhaust manifold cover (left bank) and three way catalyst cover.

6.

Remove engine main harness (left side) clip.

7.

Remove oil pressure sensor harness clip and connector.

8.

Remove air conditioner compressor switch harness connector.

9.

Remove alternator and air conditioner compressor belt. Refer to

EM-15, "Removal and Installation"

.

10. Remove idler pulley.

11. Remove alternator mounting nut using power tools.

12. Remove through-bolt.

1.

Through-bolt

2.

Cylinder block

3.

Timing chain case

4.

Alternator mounting nut

5.

Alternator

6.

Alternator connector

7.

B terminal harness

8.

B terminal nut

9.

Alternator mounting bolt

10. Alternator bracket

11. Alternator bracket mounting bolt

PKIA2926J

PKIA2431E

CHARGING SYSTEM

SC-27

C

D

E

F

G

H

I

J

L

M

A

B

SC

Revision: 2006 August

2006 Murano

13. Disconnect alternator connector.

14. Remove “B” terminal nut.

15. Remove ground harness clip and ground harness mounting nut.

16. Remove alternator mounting bolt, using power tools.

17. Remove alternator bracket mounting bolt and alternator bracket.

18. Remove alternator upward.

NOTE:
Move alternator to battery side, then remove alternator upward.

ALTERNATOR PULLEY INSPECTION

Perform the following.

Make sure that alternator pulley does not rattle.

Make sure that alternator pulley nut is tight.

INSTALLATION

Installation is the reverse order of removal.

Install alternator, and check tension of belt. Refer to

EM-13, "Checking Drive Belts"

.

CAUTION:

Be sure to tighten “B” terminal nut carefully.

PKIA2432E

PKIA2433E

Alternator pulley nut:

: 74 N·m (7.5 kg-m, 55 ft-lb)

SC-28

CHARGING SYSTEM

Revision: 2006 August

2006 Murano

Disassembly and Assembly

NKS001MO

1.

Stator

2.

Rear bearing

3.

Rotor assembly

4.

Retainer

5.

Front bearing

6.

Front cover

7.

Pulley

8.

Pulley nut

9.

Fan guide

10. Double labyrinth seal

11. IC voltage regulator assembly

12. Diode assembly

13. Rear cover

14. Terminal set

15. Through-bolt

PKIB6947E

Была ли эта страница вам полезна?
Да!Нет
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности