Nissan Frontier. Manual — part 296

DLN-86

< PRECAUTION >

[TRANSFER: TX15B]

PRECAUTIONS

When connecting or disconnecting pin connectors into or

from transfer control unit, take care not to damage pin termi-

nals (bend or break).

When connecting pin connectors make sure that there are not

any bends or breaks on transfer control unit pin terminals.

Before replacing transfer control unit, perform transfer con-

trol unit input/output signal inspection and make sure transfer

control unit functions properly. Refer to

DLN-56, "Reference

Value"

.

Service Notice

INFOID:0000000009479707

• After overhaul refill the transfer with new transfer fluid.

• Check the fluid level or replace the fluid only with the vehicle parked on level ground.

• During removal or installation, keep inside of transfer clear of dust or dirt.

• Disassembly should be done in a clean work area.

• Before proceeding with disassembly, thoroughly clean the transfer. It is important to prevent the internal

parts from becoming contaminated by dirt or other foreign matter.

• Check for the correct installation status prior to removal or disassembly. If matchmarks are required, be cer-

tain they do not interfere with the function of the parts when applied.

• All parts should be carefully cleaned with a general purpose, non-flammable solvent before inspection or

reassembly.

• Check appearance of the disassembled parts for damage, deformation, and unusual wear. Replace them

with a new ones if necessary.

• Gaskets, seals and O-rings should replaced any time the transfer is disassembled.

• In principle, tighten bolts or nuts gradually in several steps working diagonally from inside to outside. If tight-

ening sequence is specified, use it.

• Observe the specified torque when assembling.

• Clean and flush the parts sufficiently and blow-dry them.

• Be careful not to damage sliding surfaces and mating surfaces.

• Use lint-free cloth or towels for wiping parts clean. Common shop rags can leave fibers that could interfere

with the operation of the transfer.

SEF291H

MEF040DB

PREPARATION

DLN-87

< PREPARATION >

[TRANSFER: TX15B]

C

E

F

G

H

I

J

K

L

M

A

B

DLN

N

O

P

PREPARATION

PREPARATION

Special Service Tool

INFOID:0000000009479708

The actual shape of the tools may differ from those illustrated here.

Tool number
(TechMate No.)
Tool name

Description

ST33290001
(J-34286)
Puller

• Removing front oil seal
• Removing rear oil seal
• Removing metal bushing

KV38100500
(

)

Drift

• Installing front oil seal
• Installing rear oil seal
• Installing rear bearing
• Installing front bearing
a: 80 mm (3.15 in) dia.
b: 60 mm (2.36 in) dia.

KV40105310
(

)

Drift

• Installing dust cover
a: 89 mm (3.50 in) dia.
b: 80.7 mm (3.17 in) dia.

KV38100200
(

)

Drift

• Removing sun gear assembly and planetary

carrier assembly

• Removing input bearing
• Installing sun gear assembly and planetary

carrier assembly

a: 65 mm (2.56 in) dia.
b: 49 mm (1.93 in) dia.

ST30720000
(J-25405)
Drift

• Installing input bearing
• Installing input oil seal
• Installing carrier bearing
a: 77 mm (3.03 in) dia.
b: 55 mm (2.17 in) dia.

KV32102700
(

)

Drift

• Installing mainshaft rear bearing
a: 48 mm (1.89 in) dia.
b: 41 mm (1.61 in) dia.

ZZA0601D

ZZA0811D

ZZA1003D

ZZA1143D

ZZA0811D

ZZA0534D

DLN-88

< PREPARATION >

[TRANSFER: TX15B]

PREPARATION

KV40104830
(

)

Drift

• Installing input oil seal
a: 70 mm (2.76 in) dia.
b: 63.5 mm (2.50 in) dia.

ST35300000
(

)

Drift

• Removing carrier bearing
• Installing metal bushing
• Removing front bearing
a: 59 mm (2.32 in) dia.
b: 45 mm (1.77 in) dia.

ST30021000
(J-22912-01)
Puller

• Removing carrier bearing
• Removing front bearing
• Removing rear bearing

ST33710000
(

)

Drift

• Removing needle bearing
• Removing metal bushing
• Removing rear bearing
a: 89 mm (3.5 in)
b: 30 mm (1.18 in) dia.
c: 24 mm (0.94 in) dia.

ST35325000
(

)

Drift bar

• Removing metal bushing
a: 215 mm (8.46 in)
b: 25 mm (0.98 in) dia.
c: M12

× 1.5P

ST33220000
(

)

Drift

• Installing needle bearing
a: 37 mm (1.46 in) dia.
b: 31 mm (1.22 in) dia.
c: 22 mm (0.87 in) dia.

Tool number
(TechMate No.)
Tool name

Description

ZZA1003D

NT073

ZZA0537D

ZZA1057D

NT663

ZZA1046D

PREPARATION

DLN-89

< PREPARATION >

[TRANSFER: TX15B]

C

E

F

G

H

I

J

K

L

M

A

B

DLN

N

O

P

Commercial Service Tool

INFOID:0000000009479709

ST27863000
(

)

Drift

• Installing carrier bearing
a: 75 mm (2.95 in) dia.
b: 62 mm (2.44 in) dia.

ST30901000
(J-26010-01)
Drift

• Installing rear bearing
• Installing front bearing
a: 79 mm (3.11 in) dia.
b: 45 mm (1.77 in) dia.
c: 35.2 mm (1.38 in) dia.

Tool number
(TechMate No.)
Tool name

Description

ZZA1003D

ZZA0978D

Tool name

Description

Puller

• Removing companion flange
• Removing mainshaft rear bearing

Puller

• Removing mainshaft rear bearing

Pin punch

• Removing retaining pin
a: 6 mm (0.24 in) dia.

Power tool

• Loosening nuts, screws and bolts

NT077

ZZB0823D

NT410

PIIB1407E

Была ли эта страница вам полезна?
Да!Нет
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности