Nissan Juke F15. Manual — part 282
PREPARATION
DLN-133
< PREPARATION >
[REAR FINAL DRIVE: RTVS]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
Commercial Service Tools
INFOID:0000000012199496
ST33032000
(
—
)
Drift
a: 80 mm (3.15 in) dia.
b: 38 mm (1.50 in) dia.
c: 31 mm (1.22 in) dia.
Installing inner race of pinion bearing (rear).
KV37710000
(
—
)
Drift
a: 38 mm (1.50 in) dia.
b: 60 mm (2.36 in) dia.
c: 77 mm (3.03 in)
d: 30 mm (1.18 in) dia.
Installing inner race of pinion bearing (front).
Tool number
(TechMate No.)
Tool name
Description
ZZA0978D
JSDIA2284ZZ
Tool name
Description
Flange wrench
Removing and installing drive pinion lock nut.
Puller
• Removing companion flange.
• Removing inner race of side bearing (right).
• Removing inner race of side bearing (left).
Drift
a: 63 – 76 mm (2.48 – 2.99 in) dia.
b: 55 – 60 mm (2.17 – 2.36 in) dia.
Installing front oil seal.
Drift
a: 45 – 47 mm (1.77 – 1.85 in) dia.
b: 41 – 43 mm (1.57 – 1.69 in) dia.
c: 25 mm (0.98 in) or more
Installing inner race of side bearing (right).
NT035
ZZA0119D
ZZA0811D
S-NT117
DLN-134
< PREPARATION >
[REAR FINAL DRIVE: RTVS]
PREPARATION
Drift
a: 60 – 62 mm (2.36 – 2.44 in) dia.
b: 56 – 58 mm (2.20 – 2.28 in) dia.
c: 25 mm (0.98 in) or more
Installing inner race of side bearing (left).
Replacer
• Removing inner race of pinion bearing
(rear).
• Removing inner race of side bearing (right).
• Removing inner race of side bearing (left).
Power tool
Loosening bolts and nuts
Tool name
Description
S-NT117
ZZA0700D
PBIC0190E
STRUCTURE AND OPERATION
DLN-135
< SYSTEM DESCRIPTION >
[REAR FINAL DRIVE: RTVS]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
SYSTEM DESCRIPTION
STRUCTURE AND OPERATION
Sectional View
INFOID:0000000012199497
Electric controlled coupling
INFOID:0000000012199498
The electric controlled coupling operates as the AWD system. For the operation, refer to
1.
AWD solenoid (right)
2.
Pinion bearing (rear)
3.
Collapsible spacer
4.
Pinion bearing (front)
5.
Companion flange
6.
Drive pinion
7.
Gear carrier
8.
Drive gear
9.
AWD solenoid (left)
10. Electric controlled coupling (left)
11. Side bearing (left)
12. Center stem
13. Rear cover
14. Side bearing (right)
15. Electric controlled coupling (right)
JSDIA2112ZZ
DLN-136
< SYMPTOM DIAGNOSIS >
[REAR FINAL DRIVE: RTVS]
NOISE, VIBRATION AND HARSHNESS (NVH) TROUBLESHOOTING
SYMPTOM DIAGNOSIS
NOISE, VIBRATION AND HARSHNESS (NVH) TROUBLESHOOTING
NVH Troubleshooting Chart
INFOID:0000000012199499
Use the chart below to find the cause of the symptom. If necessary, repair or replace these parts.
×: Applicable
Reference
"
"
"
N
V
H
of
PROPELLER SHAF
T in this section
N
V
H
in F
A
X
, RAX,
FSU and RSU sections
NV
H
in
W
T
s
e
cti
on
NV
H
in
W
T
s
e
cti
on
NV
H
in
F
A
X
an
d R
A
X
se
ct
io
n
NV
H
in
B
R
s
ec
tio
n
NV
H
in
S
T
s
ec
tio
n
Possible cause and SUSPECTED PARTS
G
e
ar t
oo
th
rou
gh
Gea
r co
nt
ac
t i
mp
rop
er
To
ot
h s
u
rf
ac
es
w
o
rn
Ba
ck
la
sh
in
co
rrec
t
Co
mp
an
io
n f
lan
ge
e
xc
es
si
ve
run
ou
t
Gea
r oi
l i
mp
rop
er
PR
OP
EL
LE
R
S
H
A
F
T
A
XLE AND
SUSPENSI
ON
TI
RE
ROAD W
H
EEL
DRIV
E SHAFT
BR
AK
E
S
T
EERING
Symptom
Noise
×
×
×
×
×
×
×
×
×
×
×
×
×
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст