Nissan Primera P12. Manual — part 688
RSU-10
LATERAL LINK AND CONTROL ROD
LATERAL LINK AND CONTROL ROD
PFP:55130
Removal and Installation
EES0014I
REMOVAL
1.
Using a transmission jack, raise torsion beam a little, and
remove nuts and bolts from the lateral link and control rod.
2.
Remove lateral link and control rod from torsion beam.
INSPECTION AFTER REMOVAL
Lateral Link
●
Check lateral link and bushing for deformation, cracks, and damage, and replace if necessary.
Control Rod
●
Check lateral link and bushing for deformation, cracks, and damage, and replace if necessary.
INSTALLATION
1.
Refer to
for tightening torque and reverse the removal procedure for installation.
2.
Using a transmission jack to lift the torsion beam, place lateral
link and control rod horizontally against torsion beam. Tighten
bolts and nuts to specified torque.
SSU016
Standard length:
A 206.5 - 208.5 mm (8.13 - 8.21 in)
B 393.5 - 395.5 mm (15.49 - 15.57 in)
C 600.5 - 603.5 mm (23.64 - 23.76 in)
RAB0085D
Standard length:
D 106.0 - 108.0 mm (4.17 - 4.25 in)
RAB0210D
SSU019
STABILIZER BAR
RSU-11
C
D
F
G
H
I
J
K
L
M
A
B
RSU
STABILIZER BAR
PFP:54611
Removal and Installation
EES0014J
REMOVAL
1.
Remove mounting nuts on upper portion of the stabilizer connecting rod.
2.
Remove stabilizer clamp mounting bolts.
3.
Remove stabilizer from the vehicle.
INSPECTION AFTER REMOVAL
Check stabilizer, connecting rod, bushing and clamp for deformation, cracks and damage, and replace if nec-
essary.
INSTALLATION
●
Refer to
for tightening torque. Install in the reverse order of removal.
●
Because the stabilizer uses the pillow ball type connecting rod,
position the ball joint with the case on the pillow ball head paral-
lel to the stabilizer.
MEIA0005E
RSU-12
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
PFP:00030
General Specification
EES0014K
Wheel Alignment (Unladen)
EES0014L
: Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.
Wheelarch Height (Unladen)
EES0014M
: Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.
Suspension type
Multi-link beam suspension
Shock absorber type
Double-acting hydraulic
Body type
Sedan, H/B
Wagon
Camber
Degree minute (Decimal degree)
Minimum
−
2
°
12
′
(
−
2.20
°
)
−
2
°
13
′
(
−
2.22
°
)
Nominal
−
1
°
27
′
(
−
1.45
°
)
−
1
°
28
′
(
−
1.47
°
)
Maximum
−
0
°
42
′
(
−
0.70
°
)
−
0
°
43
′
(
−
0.72
°
)
Total Toe-in
Distance (A - B)
Minimum
−
1 mm (
−
0.04 in)
Nominal
3 mm (0.12 in)
Maximum
7 mm (0.28 in)
Applied model
F9Q engine
YD22DDTi engine
205/60R16
215/50R17
205/60R16
215/50R17
SEDAN
Front (Hf)
698 mm (27.48 in)
697 mm (27.44 in)
697 mm (27.44 in)
696 mm (27.40 in)
Rear (Hr)
699 mm (27.52 in)
696 mm (27.40 in)
699 mm (27.52 in)
696 mm (27.40 in)
WAGON
Front (Hf)
699 mm (27.52 in)
699 mm (27.52 in)
698 mm (27.48 in)
698 mm (27.48 in)
Rear (Hr)
695 mm (27.36 in)
692 mm (27.24 in)
695 mm (27.36 in)
692 mm (27.24 in)
SFA818A
SC-1
STARTING & CHARGING SYSTEM
K ELECTRICAL
CONTENTS
C
D
E
F
G
H
I
J
L
M
SECTION
A
B
SC
STARTING & CHARGING SYSTEM
PRECAUTIONS . . . . . . . . . . . . . . .. 2
BATTERY . . . . . . . . . . . . . . . . . 3
How to Handle Battery . . . . . . . . . . . . 3
METHODS OF PREVENTING OVER-DIS-
CHARGE . . . . . . . . . . . . . . . ... 3
CHECKING ELECTROLYTE LEVEL . . . . . 3
SPECIFIC GRAVITY CHECK . . . . . . . ... 4
Battery Test and Charging Chart . . . . . . . .. 5
CHART I . . . . . . . . . . . . . . . . 5
CHART II . . . . . . . . . . . . . . . ... 6
A: SLOW CHARGE . . . . . . . . . . . ... 7
B: STANDARD CHARGE . . . . . . . . . .. 8
C: QUICK CHARGE . . . . . . . . . . . 10
Removal and Installation . . . . . . . . . . .11
CHARGING SYSTEM . . . . . . . . . . . ... 12
System Description . . . . . . . . . . . . 12
YD ENGINE MODELS . . . . . . . . . . 12
F9Q ENGINE MODELS . . . . . . . . . .. 12
Wiring Diagram — CHARGE —/For YD Engine . 13
Wiring Diagram — CHARGE —/For F9Q Engine... 14
Trouble Diagnoses . . . . . . . . . . . . . 15
WITH IC REGULATOR . . . . . . . . . ... 15
MALFUNCTION INDICATOR . . . . . . . .. 15
Removal and Installation . . . . . . . . . . 16
Disassembly and Assembly . . . . . . . . ... 17
Disassembly . . . . . . . . . . . . . . ... 17
REAR COVER . . . . . . . . . . . . . 17
REAR BEARING . . . . . . . . . . . . . 18
Inspection . . . . . . . . . . . . . . . ... 18
Assembly . . . . . . . . . . . . . . . . 19
RING FITTING IN REAR BEARING . . . . . 19
REAR COVER INSTALLATION . . . . . . ... 19
STARTING SYSTEM . . . . . . . . . . . . . 20
System Description . . . . . . . . . . . . . 20
YD ENGINE MODELS . . . . . . . . . . 20
F9Q ENGINE MODELS . . . . . . . . . .. 20
Wiring Diagram — START —/For YD Engine . . . 21
Wiring Diagram — START —/For F9Q Engine . ... 22
Trouble Diagnoses . . . . . . . . . . . . . 23
Removal and Installation . . . . . . . . . . 24
REMOVAL . . . . . . . . . . . . . . ... 24
INSTALLATION . . . . . . . . . . . . ... 24
Disassembly and Assembly . . . . . . . . . 25
Inspection . . . . . . . . . . . . . . . ... 26
MAGNETIC SWITCH CHECK . . . . . . . . 26
PINION/CLUTCH CHECK . . . . . . . . ... 27
BRUSH CHECK . . . . . . . . . . . . .. 27
YOKE CHECK . . . . . . . . . . . . . . 28
ARMATURE CHECK . . . . . . . . . . ... 29
Assembly . . . . . . . . . . . . . . . . 30
PINION PROTRUSION LENGTH ADJUST-
MENT . . . . . . . . . . . . . . . . .. 30
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст