Nissan Pathfinder (2006 year). Manual — part 234
INTAKE MANIFOLD COLLECTOR
EM-19
C
D
E
F
G
H
I
J
K
L
M
A
EM
2006 Pathfinder
9.
Loosen nuts and bolts in reverse order as shown with power
tool, and remove intake manifold collector.
CAUTION:
Cover engine openings to avoid entry of foreign materials.
INSTALLATION
Installation is in the reverse order of removal. Note the following:
Intake Manifold Collector
●
If stud bolts were removed from intake manifold, install them and tighten to the specified torque.
●
Tighten nuts and bolts in numerical order as shown.
Electric Throttle Control Actuator
●
Tighten bolts in numerical order as shown.
●
Perform the “Throttle Valve Closed Position Learning” when har-
ness connector of electric throttle control actuator is discon-
nected. Refer to
EC-77, "Throttle Valve Closed Position
●
Perform the “Idle Air Volume Learning” and “Throttle Valve
Closed Position Learning” when electric throttle control actuator
is replaced. Refer to
EC-77, "Idle Air Volume Learning"
PBIC2877E
Intake manifold collector
bolts and nuts
: 11.0 N·m (1.1 kg-m, 8 ft-lb)
Stud bolts
: 6.9 N·m (7.0kg-m, 61 in-lb)
PBIC2877E
PBIC2875E
EM-20
INTAKE MANIFOLD
2006 Pathfinder
INTAKE MANIFOLD
PFP:14003
Removal and Installation
EBS00QBR
REMOVAL
1.
Release fuel pressure. Refer to
EC-79, "FUEL PRESSURE RELEASE"
2.
Remove intake manifold collector. Refer to
3.
Remove fuel tube and fuel injector assembly. Refer to
4.
Loosen nuts and bolts with power tool in reverse order as shown
to remove intake manifold.
5.
Remove gaskets.
CAUTION:
Cover engine openings to avoid entry of foreign materials.
INSPECTION AFTER REMOVAL
Surface Distortion
●
Check the surface distortion of the intake manifold mating sur-
face with straightedge and feeler gauge.
●
If it exceeds the limit, replace intake manifold.
1.
Intake manifold
2.
Gasket
PBIC2878E
PBIC2879E
Limit
: 0.1 mm (0.004 in)
PBIC0870E
INTAKE MANIFOLD
EM-21
C
D
E
F
G
H
I
J
K
L
M
A
EM
2006 Pathfinder
INSTALLATION
Installation is in the reverse order of removal. Note the following:
Intake Manifold
●
If stud bolts were removed from cylinder head, install them and tighten to the specified torque.
●
Tighten all nuts and bolts to the specified torque in two or more
steps in numerical order as shown.
Intake manifold studs
: 11.0 N·m (1.1kg-m, 8 ft-lb)
Intake manifold bolt and nuts
1st step
: 7.4 N·m (0.75 kg-m, 5 ft-lb)
2nd step and after
: 29.0 N·m (3.0 kg-m, 21 ft-lb)
PBIC2879E
EM-22
EXHAUST MANIFOLD AND THREE WAY CATALYST
2006 Pathfinder
EXHAUST MANIFOLD AND THREE WAY CATALYST
PFP:14004
Removal and Installation
EBS00QBS
REMOVAL (LEFT BANK)
1.
Remove air cleaner case and air duct. Refer to
2.
Remove engine undercover with power tool.
3.
Disconnect harness connector and remove heated oxygen sen-
sor 2 on both banks using Tool.
CAUTION:
●
Be careful not to damage heated oxygen sensor 2.
●
Discard any heated oxygen sensor 2 which has been
dropped from a height of more than 0.5 m (19.7 in) onto a
hard surface such as a concrete floor; replace with a new
sensor.
4.
Remove center exhaust tube, main muffler and left front exhaust tube. Refer to
5.
Remove exhaust manifold cover (left bank).
1.
Exhaust manifold cover (right bank)
2.
Exhaust manifold (right bank)
3.
Gasket
4.
Exhaust manifold cover (left bank)
5.
Exhaust manifold (left bank)
PBIC2880E
Tool number
: KV10114400 (J-38365)
LBIA0446E
EXHAUST MANIFOLD AND THREE WAY CATALYST
EM-23
C
D
E
F
G
H
I
J
K
L
M
A
EM
2006 Pathfinder
6.
Disconnect harness connector and remove air fuel ratio sensor
1 (left bank) using Tool.
CAUTION:
●
Be careful not to damage air fuel ratio sensor 1.
●
Discard any air fuel ratio sensor 1 which has been
dropped from a height of more than 0.5 m (19.7 in) onto a
hard surface such as a concrete floor; replace with a new
sensor.
7.
Remove three way catalyst (left bank).
8.
Loosen nuts with power tool in reverse order as shown.
NOTE:
Disregard the numerical order No. 7 and 8 in removal.
9.
Remove gaskets.
CAUTION:
Cover engine openings to avoid entry of foreign materials.
INSPECTION AFTER REMOVAL
Surface Distortion
●
Check the surface distortion of the exhaust manifold mating sur-
face with straightedge and feeler gauge.
●
If it exceeds the limit, replace exhaust manifold.
Tool number
: KV991J0050 (J-44626)
LBIA0447E
PBIC2881E
Limit
: 0.3 mm (0.012 in)
PBIC1096E
EM-24
EXHAUST MANIFOLD AND THREE WAY CATALYST
2006 Pathfinder
INSTALLATION (LEFT BANK)
Installation of the remaining components is in the reverse order of removal. Note the following:
Exhaust Manifold Gasket
Install in direction as shown.
Exhaust Manifold
●
If stud bolts were removed, install them and tighten to the specified torque.
●
Install exhaust manifold and tighten nuts in numerical order as
shown.
NOTE:
Tighten nuts No. 1 and 2 in two steps. The numerical order No. 7
and 8 shown second step.
Heated Oxygen Sensor
CAUTION:
●
Before installing a new air fuel ratio sensor 1 and heated oxygen sensor 2, clean exhaust system
threads using oxygen sensor thread cleaner and apply anti-seize lubricant.
●
Do not over torque air fuel ratio sensor 1 and heated oxygen sensor 2. Doing so may cause dam-
age to air fuel ratio sensor 1 and heated oxygen sensor 2, resulting in the “MIL” coming on.
PBIC2882E
Exhaust manifold stud torque
: 14.7 N·m (1.5 kg-m, 11 ft-lb)
PBIC2881E
Tool number
: (
—
) J-43897-12
: (
—
) J-43897 18
EXHAUST MANIFOLD AND THREE WAY CATALYST
EM-25
C
D
E
F
G
H
I
J
K
L
M
A
EM
2006 Pathfinder
REMOVAL (RIGHT BANK)
1.
Remove engine assembly. Refer to
2.
Loosen nuts with power tool in reverse order as shown.
NOTE:
Disregard the numerical order No. 7 and 8 in removal.
3.
Remove gaskets.
CAUTION:
Cover engine openings to avoid entry of foreign materials.
INSPECTION AFTER REMOVAL
Surface Distortion
●
Check the surface distortion of the exhaust manifold mating sur-
face with straightedge and feeler gauge.
●
If it exceeds the limit, replace exhaust manifold.
PBIC2881E
Limit
: 0.3 mm (0.012 in)
PBIC1096E
EM-26
EXHAUST MANIFOLD AND THREE WAY CATALYST
2006 Pathfinder
INSTALLATION (RIGHT BANK)
Installation of the remaining components is in the reverse order of removal. Note the following:
Exhaust Manifold Gasket
Install in direction as shown.
Exhaust Manifold
●
If stud bolts were removed, install them and tighten to the specified torque.
●
Install exhaust manifold and tighten nuts in numerical order as
shown.
NOTE:
Tighten nuts No. 1 and 2 in two steps. The numerical order No. 7
and 8 shown second step.
Heated Oxygen Sensor
CAUTION:
●
Before installing a new air fuel ratio sensor 1 and heated oxygen sensor 2, clean exhaust system
threads using oxygen sensor thread cleaner and apply anti-seize lubricant.
●
Do not over torque air fuel ratio sensor 1 and heated oxygen sensor 2. Doing so may cause dam-
age to air fuel ratio sensor 1 and heated oxygen sensor 2, resulting in the “MIL” coming on.
PBIC2882E
Exhaust manifold stud torque
: 14.7 N·m (1.5 kg-m, 11 ft-lb)
PBIC2881E
Tool number
: (
—
) J-43897-12
: (
—
) J-43897 18
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст